{"paper":{"title":"On Robust Tie-line Scheduling in Multi-Area Power Systems","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":[],"primary_cat":"math.OC","authors_text":"Lang Tong, Subhonmesh Bose, Ye Guo","submitted_at":"2017-04-24T03:22:17Z","abstract_excerpt":"The tie-line scheduling problem in a multi-area power system seeks to optimize tie-line power flows across areas that are independently operated by different system operators (SOs). In this paper, we leverage the theory of multi-parametric linear programming to propose algorithms for optimal tie-line scheduling within a deterministic and a robust optimization framework. Through a coordinator, the proposed algorithms are proved to converge to the optimal schedule within a finite number of iterations. A key feature of the proposed algorithms, besides their finite step convergence, is the privacy"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1704.07025","kind":"arxiv","version":2},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}