{"paper":{"title":"Cost-efficient QoS-Aware Data Acquisition Point Placement for Advanced Metering Infrastructure","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":[],"primary_cat":"cs.NI","authors_text":"Fariba Aalamifar, Lutz Lampe","submitted_at":"2018-02-19T14:50:11Z","abstract_excerpt":"In an advanced metering infrastructure (AMI), data acquisition points (DAPs) are responsible for collecting traffic from several smart meters and automated devices and transmitting them to the utility control center. Although the problem of optimized data collector placement has already been addressed for wireless broadband and sensor networks, DAP placement is quite a new research area for AMIs. In this paper, we investigate the minimum required number of DAPs and their optimized locations on top of the existing utility poles in a distribution grid such that smart grid quality of service requ"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1802.06656","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}