{"paper":{"title":"Millepede alignment of the Belle 2 sub-detectors after first collisions","license":"http://arxiv.org/licenses/nonexclusive-distrib/1.0/","headline":"","cross_cats":["hep-ex"],"primary_cat":"physics.ins-det","authors_text":"Jakub Kandra, Tadeas Bilka","submitted_at":"2018-12-13T09:53:27Z","abstract_excerpt":"The Belle II detector at the SuperKEKB accelerator observed the first collisions in April this year. Until mid-summer, the first commissioning run uses a reduced version of the full vertex detector. Nevertheless, this phase is an excellent opportunity to improve and test the alignment and calibration procedures being prepared for the first physics runs starting in spring 2019.\n  The procedure presented is based on Millepede II tool to solve the large minimization problem emerging in the track-based alignment and calibration of the pixel and strip detectors, the drift chamber or the muon system"},"claims":{"count":0,"items":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"1812.05340","kind":"arxiv","version":1},"verdict":{"id":null,"model_set":{},"created_at":null,"strongest_claim":"","one_line_summary":"","pipeline_version":null,"weakest_assumption":"","pith_extraction_headline":""},"references":{"count":0,"sample":[],"resolved_work":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","internal_anchors":0},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"author_claims":{"count":0,"strong_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"builder_version":"pith-number-builder-2026-05-17-v1"}