{"as_of":"2026-08-08T20:11:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:8685f737c846cfad8bd6c5b0a3380db8abe08841eaee362478bb95633596940c","coverage":[{"denominator":95,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":95,"source":"paper_references, paper_reference_links","source_observed_at":"2026-05-24T17:58:42.863642Z","state":"measured"},{"denominator":96,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":96,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-08T06:32:00.761636+00:00","state":"measured"},{"denominator":1,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":1,"source":"paper_references, paper_reference_links","source_observed_at":"2026-07-13T03:18:04.504155Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"1907.09207","snapshot_observed_at":"2026-07-13T03:18:04.504155Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case,","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2607.09400","last_updated":"2026-07-10T13:24:34Z","snapshot_observed_at":"2026-08-06T02:04:32.214072Z","submitted_at":"2026-07-10T13:24:34Z","title":"On-Device Adaptive Battery Power Prediction for Electric Vehicles","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-07-13T03:18:04.504155Z"},"links":{"cited_paper":"/paper/1907.09207","citing_paper":"/paper/2607.09400"},"observation_digest":"sha256:4ffac0440e24402806289b63252fd49f58adc432edc333bdd1376503200188ac","observation_id":"305622d0-dbf4-4b1f-9379-ba7925b39d47","resolution":{"observed_at":"2026-07-13T03:18:04.504155Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"links":{"evidence":"/evidence","html":"/paper/1907.09207/citation-record","integrity":"/paper/1907.09207/integrity","json":"/paper/1907.09207/citation-record.json","paper":"/paper/1907.09207"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"4fd303cc-04bf-4789-8579-5345fcdfafcb","year":2012},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:2fa3fc0584dbdab81621e1b507c76d265bfa30a692743825e09a108e14cdca16","observation_id":"35d8f1b5-8bf0-44b8-b77d-3af2b108c955","resolution":{"observed_at":"2026-05-24T17:59:47.124331Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"A methodology for electric power load forecasting","venue":null,"work_id":"88ba9fe2-26ff-4aeb-8151-ebcbb5b33b57","year":2011},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:52015a1f1a55118587d6965de5262fdb4be10ca4ca7ccf99cf40f7ef1455e6bc","observation_id":"a5e2d308-88f6-45f5-9972-9a51344915f2","resolution":{"observed_at":"2026-05-24T17:59:47.146570Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"062936fe-77d5-4beb-8618-436ff3bcccaa","year":2001},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:1bfb6613a37e02c4d1bfe54ed2c811c4cbebe847b2052f714411b6f2f81dd9f3","observation_id":"e9290fbd-6b7e-4466-93d8-4b404c5864f0","resolution":{"observed_at":"2026-05-24T17:59:47.254886Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Analysis of an adaptive time-series autoregressive moving-average (arma) model for short-term load forecasting","venue":null,"work_id":"7a8e5167-42b9-4a2e-85ba-f55b0d472bcf","year":1995},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:32af1540700088b2cb0ce0ae8fe858bf6cdb9119ca448b0a2ce295c05ad8ef3d","observation_id":"1a5d5a96-1571-4c5b-ab8e-3fd0454f65ae","resolution":{"observed_at":"2026-05-24T17:59:47.128523Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Short-term load forecasting via arma model identiﬁcation including non-gaussian process considerations","venue":null,"work_id":"6ece75b3-775d-4503-93b8-0cda4f2ffae6","year":2003},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:b62782cfdcac715ce24114d21c9cb80823f438424b52d7b1c9b12cd89fcb7b39","observation_id":"8013d3ed-22f6-4343-bdbe-2aaae0be687d","resolution":{"observed_at":"2026-05-24T17:59:47.161008Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"The time series approach to short term load forecasting","venue":null,"work_id":"17c00ac8-decc-486c-a33e-2b9461afa20b","year":1987},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:f4626b65389ae91442b96155087532bff9dd3c4980814edbcea2814e39698b04","observation_id":"b5b093fe-8edf-44ea-b559-dbc24bbf4a3c","resolution":{"observed_at":"2026-05-24T17:59:47.257850Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"A particle swarm optimization to identifying the armax model for short-term load forecasting","venue":null,"work_id":"47e286a8-341b-48d8-8113-c0f4766eff9e","year":2005},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:85a7938ed24ae2eb2c47328c044c9d5a4e3f755d014b2ed0a4b03189f72da99d","observation_id":"ae93da05-82a5-4538-b64b-fbf6cba45cee","resolution":{"observed_at":"2026-05-24T17:59:47.132407Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Identiﬁcation of armax model for short term load forecasting: An evolutionary programming approach","venue":null,"work_id":"b4995222-6539-4ac3-b93e-e27cc8b27ab3","year":1995},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:7007237ebd93993afc0ba3c94957645ec1bd0a4addd202f9c7614ce65ef02cdd","observation_id":"caefb96e-b917-41a4-9c45-99151edbcb7a","resolution":{"observed_at":"2026-05-24T17:59:47.169050Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Building-level occupancy data to improve arima-based electricity use forecasts","venue":null,"work_id":"a5b02712-239e-43ed-9648-2461d1451596","year":2010},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:7b76f680cd840a98ba15d8e24990eb29ae1846bf84ef93e686c00d55942c4a1b","observation_id":"4dbb47a5-c549-4d89-ad76-26e587f7167a","resolution":{"observed_at":"2026-05-24T17:59:47.137651Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"a5860de8-0265-4044-9fbd-c17fae7daa5d","year":1992},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:aabf46e574e2b77f4963b0e36ce05e38ba0ce06c6d092fe22174b5c3d1a91017","observation_id":"b64e2c92-9cc6-48b4-be55-90ae6edd58ae","resolution":{"observed_at":"2026-05-24T17:59:47.201597Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"0961b639-70cc-4bbb-bdc6-528a65896b35","year":1991},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:237ad3cd56f2a8df6893ad418b91c7fb7a4209e26048f7697304cea88f3bb2e8","observation_id":"6c004d9f-3b6d-45e4-8973-f4879b554a1a","resolution":{"observed_at":"2026-05-24T17:59:47.425734Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Liew, and C.S","venue":null,"work_id":"780a2272-af7f-4bea-9b33-6da5c9f58aed","year":1994},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:32723a0e35a32d983037083608cf3946f32ed4d8fd97897f70ba21250a6162fe","observation_id":"a7156324-8f0d-45b7-abb7-1fc0a086f40e","resolution":{"observed_at":"2026-05-24T17:59:47.172779Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Drezga and S","venue":null,"work_id":"8b6d475c-708f-4fb6-9aa1-3a139fb2c90b","year":1999},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:bfc3f131b6c175ed24860cc8c69b4b5c181c6312f5f1ee63ec37d191d6cfe412","observation_id":"44b7f42b-30be-4b42-b0df-83c2ce3ae234","resolution":{"observed_at":"2026-05-24T17:59:47.251445Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"f2fadb21-80bc-4746-a9c4-7e474a2880d1","year":2018},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:377d6325f7ee40d62343069c22ef034a3ddc748ef032be0b7c8f7b5a5223ac35","observation_id":"656e5c8e-e968-435b-b59a-bdec7b4cb86e","resolution":{"observed_at":"2026-05-24T17:59:47.388717Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"A high precision artiﬁcial neural networks model for short-term energy load forecasting","venue":null,"work_id":"22a40f26-cdb7-4ac8-af2d-e988a75c5512","year":2018},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:6fea1be5c413cf0ae6c274602d9490fd74feff1ec05483f7565e859b271da451","observation_id":"5613511d-e7c1-41c4-8bc1-2608fb225037","resolution":{"observed_at":"2026-05-24T17:59:47.330865Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Amarasinghe, D","venue":null,"work_id":"63d86bda-c85a-45d7-96a4-d3cba4eac38c","year":2017},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:0dd467e4f5a4ffe2ecc5b18c35a968519091c5b6bfe68a648048079bd88c8d8a","observation_id":"bb4d1a22-2d8d-4d04-b951-b185be93f05d","resolution":{"observed_at":"2026-05-24T17:59:47.385562Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Electricity short term load forecasting using elman recurrent neural network","venue":null,"work_id":"afd4c699-c91b-48cc-a4ed-b1e6c86239c9","year":2010},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:892289882d25302cebd5eed26e3ebb3b0d88215053de880291635b2b1be34304","observation_id":"ece6a6e1-86ab-4ba6-8b8b-72bfb424f6a0","resolution":{"observed_at":"2026-05-24T17:59:47.369288Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1705.04378","last_updated":"2018-07-20T22:54:01Z","snapshot_observed_at":"2026-07-06T05:42:19.240971Z","submitted_at":"2017-05-11T21:17:00Z","title":"An overview and comparative analysis of Recurrent Neural Networks for Short Term Load Forecasting","version":2},"cited_work":{"arxiv_id":"1705.04378","doi":null,"metadata_source":"pith","pith_arxiv_id":"1705.04378","snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"An overview and comparative analysis of Recurrent Neural Networks for Short Term Load Forecasting","venue":"cs.NE","work_id":"3b5c9433-5bf3-4888-9b0b-c73bfa67f2e6","year":2017},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"cited_paper":"/paper/1705.04378","citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:b46595769f42a3306543ec5130f6d7d4b85445e5ca074e1ddabf22956827c4e6","observation_id":"1a5eb4b7-9636-4719-9f74-b206037132f2","resolution":{"observed_at":"2026-05-24T17:59:46.620179Z","resolver_source":"local_arxiv","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Short-term electric load forecasting using echo state networks and pca decomposition","venue":null,"work_id":"291b2633-a58e-4fe8-bcb7-4ff503d40934","year":1931},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:2457de491f3377a6d48af5455580222527d57cb4f2839b69bc516bf8e7e8849c","observation_id":"6a57af7b-c6f8-4f4a-864b-b7a39258ff60","resolution":{"observed_at":"2026-05-24T17:59:47.351770Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Deep learning for estimating building energy consumption","venue":null,"work_id":"155b6f04-df85-4d3f-91c9-528b1d0665c1","year":2016},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:464d6774e371ccb3c6e9487bd8fd9a6ddba5d0b05ed50d0a68564bb90dda4432","observation_id":"3b063ffd-0609-4a4c-bb13-222605972cb8","resolution":{"observed_at":"2026-05-24T17:59:47.391945Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Electric load forecasting in smart grids using long-short- term-memory based recurrent neural network","venue":null,"work_id":"9e31b900-52fd-4d36-a805-382c2221e11f","year":2017},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:61e39b24e4adb54db5f26aa5c84bc7a8d9dc84adb7751fcb7e941e47fc5adc8f","observation_id":"aa871a43-f670-4a6b-aa73-aa5576fc7ffd","resolution":{"observed_at":"2026-05-24T17:59:47.372434Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Short-term residential load forecasting based on lstm recurrent neural network","venue":null,"work_id":"d9d2612f-f51c-47b4-8030-6eda004e0022","year":2017},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:4ab6c17d8350f217341095d5e8c5453766c93d1f2bff296040dd3ba12d06b10c","observation_id":"ff590de2-9d0e-4c3e-81c7-7a6580c93439","resolution":{"observed_at":"2026-05-24T17:59:47.338065Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Optimal deep learning lstm model for electric load forecasting using feature selection and genetic algorithm: Comparison with machine learning approaches","venue":null,"work_id":"f4afe7ba-3add-4e7a-9322-a80feaff11b2","year":2018},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:4aa1898c6efe94da534397a07155defe7db9893852fcf97afe0043accd5e5219","observation_id":"3a3d64fc-9f92-49c3-96b6-e97e95d857bc","resolution":{"observed_at":"2026-05-24T17:59:47.230548Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Short-term load forecasting with multi-source data using gated recurrent unit neural networks","venue":null,"work_id":"038674d0-a107-4569-ab9d-dde5a6690671","year":2018},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:67aaf1fa4b9fe23405e8d3c9453e8f0beb07f8484ab331520f247529101c6ad3","observation_id":"866c927d-a117-465a-86ca-6912444d5ed5","resolution":{"observed_at":"2026-05-24T17:59:47.334452Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Load forecasting via deep neural networks","venue":null,"work_id":"c53ceb57-f7fa-419b-8c0f-c3aec3c9c01f","year":2017},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:34adb33130285bf46b918f781c377741d2f5499f5cfdb1d19f38e7b7c01fa305","observation_id":"73c40a95-36a8-4c7f-8537-d8c0139facc1","resolution":{"observed_at":"2026-05-24T17:59:47.399036Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"A deep neural network model for short-term load forecast based on long short-term memory network and convolutional neural network","venue":null,"work_id":"5f4e22d4-fb5a-48a8-9483-52ac224f4c67","year":2018},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:3c482ad2c8022b54626d28f07c0177085678da4f30e66f907c16da6857ed59cc","observation_id":"bffe0e80-4efd-47de-9e4e-9a306f9dd83c","resolution":{"observed_at":"2026-05-24T17:59:47.155829Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Global energy forecasting competition 2012","venue":null,"work_id":"e07a319f-0969-4c0d-8d6e-bd521a8225ab","year":2012},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:d1505919c1939bf7790fef64171cda1585ac420ad7d852ef134924496147c4fe","observation_id":"3ec2a462-344c-444a-9aac-67f511d0afa5","resolution":{"observed_at":"2026-05-24T17:59:47.358575Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Using recurrent artiﬁcial neural networks to forecast household electricity consumption","venue":null,"work_id":"8d34b3d3-e01b-45b1-8c31-e77c1407b02f","year":2012},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:eec1f2150ffd8812849406221df087e9c620bf6fa127297d89d9f82644eacd98","observation_id":"281bed97-a7c7-441e-a28f-bd90f43790d9","resolution":{"observed_at":"2026-05-24T17:59:47.419223Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"UCI machine learning repository","venue":null,"work_id":"7480f532-73be-4845-8dcd-fc41730b860b","year":2017},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:585488fd2d2a00dc090fa8cc669334028f5c20af595532743dc910f3ea918a8a","observation_id":"db43bd53-dfec-4f9d-8a0b-2f0b87b51369","resolution":{"observed_at":"2026-05-24T17:59:47.209034Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"22afeab1-da62-4eef-83e7-c2152fba28bd","year":null},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:1b22c8cc8da74e12d9c09133f44ed0af1e52c60a1bc6bf0fed6da6113dd65112","observation_id":"82064963-9c90-4ffa-b10f-6f642fed9378","resolution":{"observed_at":"2026-05-24T17:59:47.409648Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"b2604c74-86b5-4b46-b1e9-bcd6a9e3caa2","year":2017},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:e7b931172575f6a1c923ec64e0ffbb4c25bf355bbdcf19c345a0116fc05b9271","observation_id":"6b2b9110-1177-4c15-bfba-aaf221d2e190","resolution":{"observed_at":"2026-05-24T17:59:47.141761Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"http://traces.cs.umass.edu/index.php/Smart/Smart","venue":null,"work_id":"5be62aad-1c29-410f-9a75-dc48809cd6c5","year":2017},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:14d312fd8974ee8e2e44efb8e343e434b500486fa03c0c0cc5738291cfac5926","observation_id":"56ada2ad-def6-435d-9261-cf245e1670c3","resolution":{"observed_at":"2026-05-24T17:59:47.165374Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Building energy load forecasting using deep neural networks","venue":null,"work_id":"29a8b0c2-5b0c-4035-b211-eaf2c943cd2f","year":2016},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:2bcbf16569be2b4c69653a5f7d5b00f2e5e65c475170e001fd9222f333c25ac5","observation_id":"6965af83-e38b-405c-9af3-bbd5ac67934b","resolution":{"observed_at":"2026-05-24T17:59:47.327562Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Combining auto-regression with exogenous variables in sequence-to-sequence recurrent neural networks for short-term load forecasting","venue":null,"work_id":"8f9eb625-d1a3-4017-99f9-9011540af6b0","year":2018},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:c66f8bf3fdb28a745e9c565032526c8917748ae23ea277f23b8ed395a422ffd4","observation_id":"f10463dd-7a4e-47a1-a973-7dcfd3a6b268","resolution":{"observed_at":"2026-05-24T17:59:47.196032Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"e49e2105-b96b-4b44-a6e2-dee578820d85","year":2014},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:f65f8333b901879e006d6c6d13d6bebf36400df1de02dbf45969910906ae3d44","observation_id":"f2f64ff4-9ad1-418a-8539-b7f905dff816","resolution":{"observed_at":"2026-05-24T17:59:47.177275Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Almalaq and G","venue":null,"work_id":"f8ce7df5-9bc6-46fb-8cae-8558e78a6cff","year":2017},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:94c23bc9bc61172c2e2206c726f32ab6853fbe82196497526064f23de0f294b4","observation_id":"d9455435-0d9d-4fc3-a646-f5ffb6497869","resolution":{"observed_at":"2026-05-24T17:59:47.422777Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Approximation with artiﬁcial neural networks","venue":null,"work_id":"935e55a9-deb1-4387-a331-2a5aaaccea58","year":null},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:dea27e136d38996c95bef26d9595701c0af18bd5e9ccd4b26035e9ef595f0269","observation_id":"c7b587d3-5f0d-49a0-9772-34589b71d820","resolution":{"observed_at":"2026-05-24T17:59:47.290037Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"14fb05d5-858c-4c7a-a158-9c4e85e3b8f1","year":null},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:370ef09d1ca301ec10221e5e67a9fe9853fc9ae5bbf3a991b065df52b9abf45d","observation_id":"091fdfe2-dc26-4c08-ac40-29f6c7882f00","resolution":{"observed_at":"2026-05-24T17:59:47.282956Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"e4cc62da-68b6-4f63-b15b-8d15c8b1f2b7","year":2012},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:a45f24e4304898e4d686c0092a509802ecf4c16f9e2fcfc60cd9dab7fc62cead","observation_id":"bd2aaac8-b475-457f-b8f6-1b7c8e2e8fb7","resolution":{"observed_at":"2026-05-24T17:59:47.264002Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1412.6980","last_updated":"2017-01-30T01:27:54Z","snapshot_observed_at":"2026-07-06T02:11:23.670680Z","submitted_at":"2014-12-22T13:54:29Z","title":"Adam: A Method for Stochastic Optimization","version":9},"cited_work":{"arxiv_id":"1412.6980","doi":"10.1002/mrm.28086","metadata_source":"pith","pith_arxiv_id":"1412.6980","snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Adam: A Method for Stochastic Optimization","venue":"cs.LG","work_id":"1910796d-9b52-4683-bf5c-de9632c1028b","year":2014},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"cited_paper":"/paper/1412.6980","citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:31e681ac3988de1721731bb893ab0bb4f506f624b9479c35428e4892b41de980","observation_id":"5c2da4ee-6280-4f84-a01c-4f112971095e","resolution":{"observed_at":"2026-05-24T17:59:46.598411Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Chen, D.C","venue":null,"work_id":"609c2ce0-9e82-4911-95ba-2a9d83ff9f04","year":1992},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:1ecd486224f14249952edeb145543ad17628b1936782e57f6b1ae585188f66c1","observation_id":"1675c9e4-0f0d-45f6-8e6d-ebc12be2e3fa","resolution":{"observed_at":"2026-05-24T17:59:47.269664Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Deep residual learning for image recognition","venue":null,"work_id":"69be17c6-f3d2-4a88-b8a3-bbac4aee43c1","year":2016},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:bac9b22ed8374216bf5073aa83c278f3031fc4805dbed26d21d26247512be03c","observation_id":"c9d02d37-fcc3-4ba3-8be5-298495248a93","resolution":{"observed_at":"2026-05-24T17:59:47.348368Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"e34c2514-853b-4234-b327-212ce931a2e7","year":1990},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":43,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:b3c02c6f725d9d7a7faafb9261b64d62a676c77149c332fe3cbb9af4d47ddc34","observation_id":"e2ea468b-d855-4615-a638-24b9f00a4a8c","resolution":{"observed_at":"2026-05-24T17:59:47.296750Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Long short-term memory","venue":null,"work_id":"c6484400-07ff-40f1-bce5-885c9c526cc6","year":1997},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":44,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:788aa9914e4c1b3a16cf9bc3a30bc7f880761a49f9406fa67a62edbd125eb846","observation_id":"e609ee4b-20b2-41ca-8aad-bc973943e8c6","resolution":{"observed_at":"2026-05-24T17:59:47.266805Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Learning phrase representations using RNN encoder-decoder for statistical machine translation","venue":null,"work_id":"c17cf4bd-4bee-4a9b-82df-8690771fc4fb","year":2014},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":45,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:f7faffa1de3cd9717eb376b89bf74b35c65edcbfc5acfc5c83922ea8d1555b12","observation_id":"25567d9b-9cc2-494a-b7d1-aa0ee2c06859","resolution":{"observed_at":"2026-05-24T17:59:47.276160Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"806eeb70-822a-4a00-8cdf-fc8331d4a6a1","year":1990},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":46,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:f3d6ea8de255bb897f05530088f06b67c6018b4e916a33a95421f97917884fc4","observation_id":"7e14cacb-76a9-4084-9d1b-ca2cfd1b44fb","resolution":{"observed_at":"2026-05-24T17:59:47.375609Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"e3026ff4-36c9-412f-987f-94b37c5980a2","year":1986},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":47,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:9a7fd7ea0794c3defdc4c9b8634bea51d79234a1d3ebd94f0545d46793008d3c","observation_id":"8e0666c9-c7a6-4893-9248-4bb6e4406529","resolution":{"observed_at":"2026-05-24T17:59:47.272746Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Williams and Jing Peng","venue":null,"work_id":"bc6d996d-1374-4ffc-b4c9-34b0fba5023e","year":1998},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":48,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:e84cc45c037281d41a009e17c115f21d466ca56b03959164f3202a7b476ec3d2","observation_id":"44775344-899a-4bce-99b8-b06ecd77b992","resolution":{"observed_at":"2026-05-24T17:59:47.216508Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Bengio, P","venue":null,"work_id":"f44e1481-f20d-40a1-a948-77074208cdfa","year":1994},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:c822873766ea17ff79e7a880212f6120e78a16d2f71f93e034c1d0ee40b9df96","observation_id":"7417d678-8d39-4d00-bc97-f2af18174bdb","resolution":{"observed_at":"2026-05-24T17:59:47.150521Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"On the difﬁculty of training recurrent neural networks","venue":null,"work_id":"8e2c4db0-cabb-41d7-9f77-db0407c098e5","year":2013},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":50,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:ebe6b29ae74b592ac23f637e46cb5f81a2135c4e64a532aa4669419f81d1f3bf","observation_id":"3161327d-8f1e-4a3d-bec1-93ed81578053","resolution":{"observed_at":"2026-05-24T17:59:47.204817Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Greff, R","venue":null,"work_id":"ab7f60f1-55a5-4382-a6b1-27177e719415","year":2017},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":51,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:865f645ed6fffe4e5a0eb61e89b05473df43ae1072d73ad4e5e81ad682165abd","observation_id":"bfe9d445-c7d5-4869-89fa-0d7df30c41be","resolution":{"observed_at":"2026-05-24T17:59:47.191714Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1412.3555","last_updated":"2014-12-11T06:46:53Z","snapshot_observed_at":"2026-08-03T11:40:51.182181Z","submitted_at":"2014-12-11T06:46:53Z","title":"Empirical Evaluation of Gated Recurrent Neural Networks on Sequence Modeling","version":1},"cited_work":{"arxiv_id":"1412.3555","doi":"10.1145/2939672.2939875","metadata_source":"pith","pith_arxiv_id":"1412.3555","snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Empirical Evaluation of Gated Recurrent Neural Networks on Sequence Modeling","venue":"cs.NE","work_id":"c7f2f5a9-ae4b-48db-aff0-24b9d0528995","year":2014},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":52,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"cited_paper":"/paper/1412.3555","citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:8bb4bdf4f77c7873d5d06adbe4c4b0baf7e84a9d277e034a8c128b6084e78b82","observation_id":"e2adc610-1790-419f-9111-c733bf72bb26","resolution":{"observed_at":"2026-05-24T17:59:46.592129Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-05-19T20:22:37.170537+00:00","source":"crossref_status_cache"},{"observed_at":"2026-05-19T20:22:37.170537+00:00","source":"openalex_status_cache"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1702.01923","last_updated":"2017-02-07T08:33:35Z","snapshot_observed_at":"2026-07-06T05:29:05.528612Z","submitted_at":"2017-02-07T08:33:35Z","title":"Comparative Study of CNN and RNN for Natural Language Processing","version":1},"cited_work":{"arxiv_id":"1702.01923","doi":null,"metadata_source":"pith","pith_arxiv_id":"1702.01923","snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Comparative Study of CNN and RNN for Natural Language Processing","venue":"cs.CL","work_id":"ee231b6a-a3e1-49ed-a763-246944e7e6a7","year":2017},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":53,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"cited_paper":"/paper/1702.01923","citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:7ad4c006b25b59c095059347a071df7c3788860190d496d585562856e4a569ee","observation_id":"1627e89d-60f9-450e-a70d-d2953177a890","resolution":{"observed_at":"2026-05-24T17:59:46.580838Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1312.6026","last_updated":"2014-04-24T15:17:07Z","snapshot_observed_at":"2026-08-04T05:14:04.438326Z","submitted_at":"2013-12-20T16:39:39Z","title":"How to Construct Deep Recurrent Neural Networks","version":5},"cited_work":{"arxiv_id":"1312.6026","doi":null,"metadata_source":"pith","pith_arxiv_id":"1312.6026","snapshot_observed_at":"2026-07-02T12:26:56.633893Z","title":"How to Construct Deep Recurrent Neural Networks","venue":"cs.NE","work_id":"dcfac693-0b2b-4058-8178-ab1e3f354d77","year":2013},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":54,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"cited_paper":"/paper/1312.6026","citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:2901979163ebfd07a0503284b6326cdc5bd35cc46936b962510f2c88e6f0bc5a","observation_id":"a9090d9b-c263-4cfc-8a18-3b5ad895c1b2","resolution":{"observed_at":"2026-05-24T17:59:46.604282Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Learning complex, extended sequences using the principle of history compression","venue":null,"work_id":"a39f8bc7-b30d-49d0-a5b4-f7b01d8f1a0e","year":1992},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":55,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:86352fd289684cd9d176127fa87d67af8b2e80dc6bdb7434a51d63927b63281f","observation_id":"80ace496-09e7-4612-aa87-c6e4d670c5f3","resolution":{"observed_at":"2026-05-24T17:59:47.362328Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1303.5778","last_updated":"2013-03-22T20:55:48Z","snapshot_observed_at":"2026-07-06T03:09:29.048492Z","submitted_at":"2013-03-22T20:55:48Z","title":"Speech Recognition with Deep Recurrent Neural Networks","version":1},"cited_work":{"arxiv_id":"1303.5778","doi":null,"metadata_source":"pith","pith_arxiv_id":"1303.5778","snapshot_observed_at":"2026-07-02T22:47:25.656658Z","title":"Speech Recognition with Deep Recurrent Neural Networks","venue":"cs.NE","work_id":"611d9cf3-f873-4f7a-adc0-ddd2aecf7ccb","year":2013},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":56,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"cited_paper":"/paper/1303.5778","citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:95dee1f6117160c1950b89088465db57e4fded181930dc6d757fdf4178f1329c","observation_id":"d26a88e0-0df4-4aa1-8358-8e3767e37438","resolution":{"observed_at":"2026-05-24T17:59:46.586022Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Training and analysing deep recurrent neural networks","venue":null,"work_id":"a2157687-b2f4-4ba9-bf0e-dd3e943f904c","year":2013},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":57,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:37b2ebe4e56f771ba57b149d9dc50672a224665dd990fb2884d58d0f16f542f2","observation_id":"7e4ac954-407f-49ba-8730-b163a6939f4e","resolution":{"observed_at":"2026-05-24T17:59:47.365708Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Atiya, and Antti Sorjamaa","venue":null,"work_id":"c361e9a4-c33f-43cf-8cfb-6a4c3a46f9aa","year":2012},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":58,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:180b302614b578f1c638d0e370e2c249828718298a88bf49a7cc54d8db2c0564","observation_id":"cd33f158-a5fe-471f-93db-a9b91a6b09b9","resolution":{"observed_at":"2026-05-24T17:59:47.382178Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Time series prediction using dirrec strategy","venue":null,"work_id":"354de8c2-c554-48fa-a405-627af8e75492","year":2006},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":59,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:6f49d0d337ce2477f31f6f7ee93526db10efecf3f9464601d3e9c00945077f64","observation_id":"544b3bd5-831a-4b86-89ba-8ec400334e8b","resolution":{"observed_at":"2026-05-24T17:59:47.286473Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Long term time series prediction with multi-input multi-output local learning","venue":null,"work_id":"e6645f5f-2a2c-4cdd-bf6f-fded8cf17562","year":2008},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":60,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:7d18db8d8a89f15816981d222d01898067396b05db35516a078b56e54476d2ef","observation_id":"fe457d20-86a4-4d24-a1c2-dafe757b4fe0","resolution":{"observed_at":"2026-05-24T17:59:47.341453Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Long-term prediction of time series by combining direct and mimo strategies","venue":null,"work_id":"66a1cf49-18e6-4fc1-9a8e-9eb6dcb27226","year":2009},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":61,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:24101ad3453f0f3f3655dca739f4400acc626dd79fcef25d58ea8f5973858e7a","observation_id":"c3d066a8-b53c-4df5-beba-ab1143fbbaff","resolution":{"observed_at":"2026-05-24T17:59:47.317428Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"664deb56-62cd-4271-89ed-f811c187c13c","year":1931},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":62,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:ae64661ba33d5d7d81aa89a288590faa1d66c191110d035ed78399eead194e8c","observation_id":"b78100ea-1e9f-4cae-8c83-703ed66dcb81","resolution":{"observed_at":"2026-05-24T17:59:47.307113Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"1a369b2f-ba7b-4c6d-8288-93ea13b35ca4","year":2014},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":63,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:b4487a19becb88f8d69f0625c19984f6691744f0a07e3ffbab40e59e9eb68c96","observation_id":"fc990fa7-8f4b-475f-a9a2-9f4d7b4c9149","resolution":{"observed_at":"2026-05-24T17:59:47.300474Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1409.0473","last_updated":"2016-05-19T21:53:22Z","snapshot_observed_at":"2026-07-06T03:53:10.336430Z","submitted_at":"2014-09-01T16:33:02Z","title":"Neural Machine Translation by Jointly Learning to Align and Translate","version":7},"cited_work":{"arxiv_id":"1409.0473","doi":"10.48550/arxiv.1409.0473","metadata_source":"pith","pith_arxiv_id":"1409.0473","snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Neural Machine Translation by Jointly Learning to Align and Translate","venue":"cs.CL","work_id":"d831e763-d530-4029-a65c-ac595d82cb2a","year":2014},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":64,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"cited_paper":"/paper/1409.0473","citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:9e3182c9e4b864c3b2d686ced57cf4ed8b81bf9a503dd574af6eff964021bb2f","observation_id":"681da820-a5b9-461c-8ea6-314c66a9806c","resolution":{"observed_at":"2026-05-24T17:59:46.614796Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-07-16T23:20:48.784513+00:00","source":"crossref_status_cache"},{"observed_at":"2026-07-16T23:20:48.784513+00:00","source":"openalex_status_cache"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"630b8062-99aa-44e1-928c-6f33e3716b38","year":2016},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":65,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:6bf4394b17ec824ce79ea183923e92e2e2ca862930fe0435bb898ed795db65db","observation_id":"2ae0dc0e-6ebd-43df-8b24-be00fa68c206","resolution":{"observed_at":"2026-05-24T17:59:47.303596Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Graves, A","venue":null,"work_id":"6fbe270c-b897-41b3-af12-04d15a212ac2","year":2013},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":66,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:2dcc3addde0ad5fa562720b9c3569d34aa691336f76666a061db9125b76cea22","observation_id":"31e879b0-1f96-41a9-895b-7be2e2dfd344","resolution":{"observed_at":"2026-05-24T17:59:47.314071Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Attention-based models for speech recognition","venue":null,"work_id":"d8b26719-d41e-4b34-add3-ba811fe6fb8d","year":2015},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":67,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:13919665e55a8765fa351a76dd7157109236dea1417bfa810b9b7f3ea7eff5d3","observation_id":"77a05013-d84f-4da1-b8d4-37c084e5c4e6","resolution":{"observed_at":"2026-05-24T17:59:47.310829Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Bahdanau, J","venue":null,"work_id":"fef607ca-302c-4bec-a750-c5806b001001","year":2016},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":68,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:546afc6e74dd5bf8df7a878d84e423413d63775149e59e06f03b61cf73845453","observation_id":"dc0f21e1-5459-41db-9744-181548c6ab98","resolution":{"observed_at":"2026-05-24T17:59:47.241558Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Show, attend and tell: Neural image caption generation with visual attention","venue":null,"work_id":"bd4c09a7-232c-434b-ae93-e22a5f4ab755","year":2048},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":69,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:e72b501f22f9fa0821729e16e6061dff0511ccae3e9a6ca4e3c33f4eeb9ec1a8","observation_id":"03f415ac-b923-4599-816c-c71dff038e58","resolution":{"observed_at":"2026-05-24T17:59:47.324105Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Williams and David Zipser","venue":null,"work_id":"06ccc945-7c37-4238-beaf-21ddb58aaaa1","year":1989},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":70,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:f77aeb0d86e9d19e204134756b78b49f5e85c1ef6d3cbe62a41755009b356059","observation_id":"788bc8d2-8329-4e04-987f-176a7f0e19b4","resolution":{"observed_at":"2026-05-24T17:59:47.320913Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1511.06732","last_updated":"2016-05-06T21:18:46Z","snapshot_observed_at":"2026-07-31T03:58:50.695173Z","submitted_at":"2015-11-20T19:25:54Z","title":"Sequence Level Training with Recurrent Neural Networks","version":7},"cited_work":{"arxiv_id":"1511.06732","doi":null,"metadata_source":"pith","pith_arxiv_id":"1511.06732","snapshot_observed_at":"2026-07-10T20:47:34.549319Z","title":"Sequence Level Training with Recurrent Neural Networks","venue":"cs.LG","work_id":"dc290ee1-26a6-4bd7-9e1f-2750979723af","year":2015},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":71,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"cited_paper":"/paper/1511.06732","citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:f8cfde7ae98aa0930b2dcb2afbc1998b10edeced97c91a86998889f0242db6b6","observation_id":"63540a17-0330-4fe6-8b81-7db8ac9ed2b0","resolution":{"observed_at":"2026-05-24T17:59:46.564902Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Scheduled sampling for sequence prediction with recurrent neural networks","venue":null,"work_id":"bda198da-8984-4cf7-8d88-4609ad3c2582","year":2015},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":72,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:14955c9925b29a9a5224b2c81c965353d0e429ecbdd584b9c017bff39a4cf8b5","observation_id":"77bb2afe-b181-48c5-b4aa-be99d434bb00","resolution":{"observed_at":"2026-05-24T17:59:47.412882Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Courville, and Yoshua Bengio","venue":null,"work_id":"8c7fa4ad-5bb9-4bd0-94a6-77916dc58b64","year":2016},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":73,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:8bbdc98a5a9a60fce20b965262450224a1df1a4bc5f824efb9468e06f4e91c55","observation_id":"62e4799d-bc27-431b-b3ed-570f3958a10f","resolution":{"observed_at":"2026-05-24T17:59:47.402968Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1805.09461","last_updated":"2019-04-15T23:56:10Z","snapshot_observed_at":"2026-07-06T06:40:55.909562Z","submitted_at":"2018-05-24T00:21:34Z","title":"Deep Reinforcement Learning For Sequence to Sequence Models","version":4},"cited_work":{"arxiv_id":"1805.09461","doi":null,"metadata_source":"pith","pith_arxiv_id":"1805.09461","snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Deep Reinforcement Learning For Sequence to Sequence Models","venue":"cs.LG","work_id":"93e81273-568f-4760-bcd3-c78a4c745df9","year":2018},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":74,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"cited_paper":"/paper/1805.09461","citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:40b25f1860c9a06a02569f8c9f8d48821a574feba650b4288ffc5134f5b735ae","observation_id":"7dc03f99-0568-4a1a-bdd9-3aba9af3ed23","resolution":{"observed_at":"2026-05-24T17:59:46.631869Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Combining auto-regression with exogenous variables in sequence- to-sequence recurrent neural networks for short-term load forecasting","venue":null,"work_id":"c822e1d4-4d25-4a77-a07e-716cc17a5f99","year":2018},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":75,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:25135fc66fa642ce08938f7b9837566da952e2c38f7f4198a230012ba348f572","observation_id":"f63e7cb2-8e61-4c93-b840-967ff32b55ab","resolution":{"observed_at":"2026-05-24T17:59:47.379017Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Gradient-based learning applied to document recognition","venue":null,"work_id":"7782ed60-4a1c-49f2-9935-d623c18e8e80","year":1998},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":76,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:b45776f7d4c4ec01b42ad13102fb5bc110ae0dd1a4e9519b51e08ccd55a67e03","observation_id":"dbf6333a-626b-4679-9e10-938753daea1d","resolution":{"observed_at":"2026-05-24T17:59:47.260730Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Imagenet classiﬁcation with deep convolutional neural networks","venue":null,"work_id":"5b0f2749-9883-4417-8344-3deb4857b6f7","year":2012},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":77,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:a8679c8bd464c0b8ce37ab9303905f8eee7d8eda78132844ecd26ecd0a838382","observation_id":"4c4132c6-cb3c-42ed-b2e6-75e084556e48","resolution":{"observed_at":"2026-05-24T17:59:47.355089Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1409.1556","last_updated":"2015-04-10T16:25:04Z","snapshot_observed_at":"2026-07-06T03:53:32.549552Z","submitted_at":"2014-09-04T19:48:04Z","title":"Very Deep Convolutional Networks for Large-Scale Image Recognition","version":6},"cited_work":{"arxiv_id":"1409.1556","doi":"10.48550/arxiv.1409.1556","metadata_source":"pith","pith_arxiv_id":"1409.1556","snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Very Deep Convolutional Networks for Large-Scale Image Recognition","venue":"cs.CV","work_id":"1c4b4409-c14b-488b-a086-c57a5aab8a29","year":2014},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":78,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"cited_paper":"/paper/1409.1556","citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:eafe6a2834f00a6bddffd1c4951d8c9483284d1d1259db6c52f41b8ce388ace0","observation_id":"43eb059d-e165-465b-b13c-ceee41b041ae","resolution":{"observed_at":"2026-05-24T17:59:46.574634Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-07-12T23:51:07.915518+00:00","source":"crossref_status_cache"},{"observed_at":"2026-07-12T23:51:07.915518+00:00","source":"openalex_status_cache"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Going deeper with convolutions","venue":null,"work_id":"374be01e-462c-458e-9ba0-4f8c8b10a5f7","year":2015},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":79,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:2c2df695f39e69c7f4a9a795efe56ef53c0daaa780152bf5c145d60a1093d5d1","observation_id":"3f603c1b-a45b-4b4d-9b8e-2292ec141ea2","resolution":{"observed_at":"2026-05-24T17:59:47.248507Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Fast r-cnn","venue":null,"work_id":"d6e40807-884e-4241-bcb8-082d2046a07a","year":2015},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":80,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:ca16980004212f2e02bd1b7222bab739ddb9ae5ccdaf599f6ee7c7bb31c88b2e","observation_id":"210fef02-4832-48e9-a54d-e1446332c829","resolution":{"observed_at":"2026-05-24T17:59:47.245278Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Faster r-cnn: Towards real-time object detection with region proposal networks","venue":null,"work_id":"ed205d38-bd95-464b-858e-cba7128b5479","year":2015},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":81,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:5ca99468db418521ade6f6018656c80297fb1a23644c1e6b52619ccf8bf70e07","observation_id":"1ba28f0e-ce1f-486a-acf6-b0de8720c2f6","resolution":{"observed_at":"2026-05-24T17:59:47.293649Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Spatial transformer networks","venue":null,"work_id":"53566828-d8d7-4055-b5be-3989f72dbd09","year":2017},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":82,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:ab461611e966a2360b36177c61392da9de4223c3c0c222df2a35784fbbaab98f","observation_id":"d59d09aa-6908-4c72-8c1c-7f08b817556f","resolution":{"observed_at":"2026-05-24T17:59:47.279701Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1702.00783","last_updated":"2017-03-22T16:13:21Z","snapshot_observed_at":"2026-07-06T05:28:35.263230Z","submitted_at":"2017-02-02T18:59:17Z","title":"Pixel Recursive Super Resolution","version":2},"cited_work":{"arxiv_id":"1702.00783","doi":null,"metadata_source":"pith","pith_arxiv_id":"1702.00783","snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Pixel Recursive Super Resolution","venue":"cs.CV","work_id":"445898af-2e1c-4688-8763-52d4db80ceff","year":2017},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":83,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"cited_paper":"/paper/1702.00783","citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:78f0ed069d393b4349ccea5f7f01d3585dfa63b945e2c63fa44c176638fa2149","observation_id":"184ff285-f02d-49cf-938a-e7b0f3d1efa6","resolution":{"observed_at":"2026-05-24T17:59:46.554909Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Photo-realistic single image super-resolution using a generative adversarial network","venue":null,"work_id":"c9861eae-3b75-455a-ae19-32de1b148682","year":2017},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":84,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:c0d73e762621469c441fc152ab489b889eba552c547a560bb4cb04d7a358bd46","observation_id":"323a1c7d-b909-43c9-b026-84da627d6e63","resolution":{"observed_at":"2026-05-24T17:59:47.238180Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Wavenet: A generative model for raw audio","venue":null,"work_id":"38018615-5c5e-4118-bd3d-12993abf484c","year":2016},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":85,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:66768c5bfadb25154add14073c95054f333d258c84297dea21df869436240d64","observation_id":"a941c46d-7a49-4f0d-8e67-038a279265c6","resolution":{"observed_at":"2026-05-24T17:59:47.234503Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1705.03122","last_updated":"2017-07-25T01:40:57Z","snapshot_observed_at":"2026-07-06T05:41:50.872484Z","submitted_at":"2017-05-08T23:25:30Z","title":"Convolutional Sequence to Sequence Learning","version":3},"cited_work":{"arxiv_id":"1705.03122","doi":"10.48550/arxiv.1705.03122","metadata_source":"pith","pith_arxiv_id":"1705.03122","snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Convolutional Sequence to Sequence Learning","venue":"cs.CL","work_id":"8d661523-229c-4623-8d91-eda932ff7d9c","year":2017},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":86,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"cited_paper":"/paper/1705.03122","citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:8458775fd90e817e22a7c94404fd2cc93997c9abefbd7c6f8d34b56543d04971","observation_id":"eb48ba01-2cea-4178-9ee7-d380d1eedece","resolution":{"observed_at":"2026-05-24T17:59:46.569243Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-07-12T23:51:08.473747+00:00","source":"crossref_status_cache"},{"observed_at":"2026-07-12T23:51:08.473747+00:00","source":"openalex_status_cache"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Conditional time series forecasting with convolutional neural networks","venue":null,"work_id":"e980c1e7-dcf8-438f-b93f-a0e1ffd9a89b","year":2017},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":87,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:da844aa9d48c8d62058201dbe510599a728f745106cc99c22e2519c7d7490dc3","observation_id":"1496f9cf-a0db-4d87-b454-8f1cd20114c9","resolution":{"observed_at":"2026-05-24T17:59:47.226611Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1603.07285","last_updated":"2018-01-11T18:54:25Z","snapshot_observed_at":"2026-07-06T04:50:29.194431Z","submitted_at":"2016-03-23T17:52:21Z","title":"A guide to convolution arithmetic for deep learning","version":2},"cited_work":{"arxiv_id":"1603.07285","doi":null,"metadata_source":"pith","pith_arxiv_id":"1603.07285","snapshot_observed_at":"2026-07-04T12:39:49.217701Z","title":"A guide to convolution arithmetic for deep learning","venue":"stat.ML","work_id":"ffb4573d-c3da-4657-a260-b402f63dcbe3","year":2016},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":88,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"cited_paper":"/paper/1603.07285","citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:49bc70ff04f66b77b4458315f92161c37f7776e9eac4973859da5f8e857ffc95","observation_id":"0e17c7d4-f777-4e69-8b37-a7d2e0a664cb","resolution":{"observed_at":"2026-05-24T17:59:46.559746Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1803.01271","last_updated":"2018-04-19T14:32:38Z","snapshot_observed_at":"2026-07-06T06:26:27.965096Z","submitted_at":"2018-03-04T00:20:29Z","title":"An Empirical Evaluation of Generic Convolutional and Recurrent Networks for Sequence Modeling","version":2},"cited_work":{"arxiv_id":"1803.01271","doi":"10.48550/arxiv.1803.01271","metadata_source":"pith","pith_arxiv_id":"1803.01271","snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"An Empirical Evaluation of Generic Convolutional and Recurrent Networks for Sequence Modeling","venue":"cs.LG","work_id":"04430f4e-b270-479c-9dcd-bee723164789","year":2018},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":89,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"cited_paper":"/paper/1803.01271","citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:5f27e84793242d87e01b55c989e064c2eb9a7a4eadddb91d613a9dc4eb7964f0","observation_id":"12917e31-54de-4bd9-aeca-271ba0a9fbf1","resolution":{"observed_at":"2026-05-24T17:59:46.625904Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"14531d8b-500d-41a4-b279-0d84ffb3ab77","year":2015},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":90,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:428f4f6e36a2dc6ccfa4a75b18e7efcd443476ad5ddb989fa373283b648c0237","observation_id":"0c4dc689-5e7c-4755-84de-7bd9a0157862","resolution":{"observed_at":"2026-05-24T17:59:47.219721Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"f7cd4dc7-cfb4-4738-a40d-53fd8ddb15ba","year":2015},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":91,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:20a9c5ea0f07a30e12cb81995b3e4dcd66dced46727dd49e6fb492923f1172d2","observation_id":"fdb97ad6-f6ee-443d-a9cc-ee5e383c752a","resolution":{"observed_at":"2026-05-24T17:59:47.212703Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":null,"venue":null,"work_id":"846f8e8e-40fd-4eca-8887-71a680b3f3c8","year":2006},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":92,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:1fccf08f0deb6611ed8ebeaebca652b9edc61b2f44ae395cfc8e6fc0f70dca8b","observation_id":"758d5b13-c54c-4e5e-800d-91bb6d6ddeed","resolution":{"observed_at":"2026-05-24T17:59:47.406304Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"1611.01186","last_updated":"2017-05-20T10:18:06Z","snapshot_observed_at":"2026-07-06T05:17:18.667361Z","submitted_at":"2016-11-03T20:55:49Z","title":"Demystifying ResNet","version":2},"cited_work":{"arxiv_id":"1611.01186","doi":null,"metadata_source":"pith","pith_arxiv_id":"1611.01186","snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Demystifying ResNet","venue":"cs.NE","work_id":"2122025b-2050-4377-8843-89d0964583f9","year":2016},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":93,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"cited_paper":"/paper/1611.01186","citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:b81c3bf51a471c831c25d56fc306627c42343a8eafa640744895dd30647d8636","observation_id":"eada6e83-43c8-4de6-89ea-3696a2368a45","resolution":{"observed_at":"2026-05-24T17:59:46.609902Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Batch normalization: Accelerating deep network training by reducing internal covariate shift","venue":null,"work_id":"e3a9250e-4b27-48bc-9954-789c0c02ab15","year":2015},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":94,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:b8650de913709eb67d292ae299e4ea0df2d62754b7c924389b21ef20b12390bf","observation_id":"ecb6b59c-cfc2-4141-aba9-68a063acf4b4","resolution":{"observed_at":"2026-05-24T17:59:47.395525Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Marinescu, C","venue":null,"work_id":"fdca3aa4-aac8-4395-a116-647bd3d9672d","year":2013},"citing_paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case","version":1},"reference_index":95,"source":"pdf_text","source_observed_at":"2026-05-24T17:58:42.863642Z"},"links":{"citing_paper":"/paper/1907.09207"},"observation_digest":"sha256:5d62077ffbfa2a7458462c9597ed7b209a3929518fa90838d5a438c594c54440","observation_id":"5c40a206-d129-4ab4-919c-0255de6f04ff","resolution":{"observed_at":"2026-05-24T17:59:47.344779Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-08T06:32:00.761636+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"1907.09207","last_updated":"2019-07-22T10:03:17Z","latest_version":1,"primary_category":"cs.LG","snapshot_observed_at":"2026-08-05T10:14:37.089833Z","submitted_at":"2019-07-22T10:03:17Z","title":"Deep Learning for Time Series Forecasting: The Electric Load Case"},"reference_resolution":{"displayed":95,"state_counts":{"malformed_identifier":0,"metadata_mismatch":1,"parse_uncertain":0,"unresolved":19,"verified_exact":14,"verified_fuzzy":61},"total_outbound_references":95},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-08T06:32:00.761636+00:00","source":"crossref"},{"observed_at":"2026-08-08T06:31:55.24221+00:00","source":"retraction_watch"}],"thesis":"As of 8 August 2026, this Paper Citation Record lists 95 of 95 outbound references and 1 inbound Pith citation observation for arXiv:1907.09207."}