{"as_of":"2026-08-11T02:13:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:e24b7bd1526d2410972a8c29c90531566578632c8dc6c6335f88cfa4aa0b18e7","coverage":[{"denominator":0,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":1,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-10T06:31:04.303077+00:00","state":"measured"},{"denominator":1,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":1,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-10T21:58:10.459190Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"pith","source_observed_at":"2026-08-10T21:58:10.653353Z","state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2301.09703","last_updated":"2023-01-23T20:23:35Z","snapshot_observed_at":"2026-08-11T00:31:17.402420Z","submitted_at":"2023-01-23T20:23:35Z","title":"Two-Stage Learning For the Flexible Job Shop Scheduling Problem","version":1},"cited_work":{"arxiv_id":"2301.09703","doi":null,"metadata_source":"pith","pith_arxiv_id":"2301.09703","snapshot_observed_at":"2026-08-10T21:58:10.653353Z","title":"Two-Stage Learning For the Flexible Job Shop Scheduling Problem","venue":"cs.AI","work_id":"9f59c497-c8f5-471d-8fc3-d0d06bd93418","year":2023},"citing_paper":{"arxiv_id":"2501.03443","last_updated":"2025-01-07T00:09:52Z","snapshot_observed_at":"2026-08-10T21:50:22.326938Z","submitted_at":"2025-01-07T00:09:52Z","title":"Optimization Learning","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-10T21:58:10.459190Z"},"links":{"cited_paper":"/paper/2301.09703","citing_paper":"/paper/2501.03443"},"observation_digest":"sha256:7a83391f25e92556bf182ebde5d62b2e58b640f0ac614e932c48388a4035305f","observation_id":"9e907dce-a80e-4911-a481-3fe81f3d1d9b","resolution":{"observed_at":"2026-08-10T21:58:10.660213Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}}],"links":{"evidence":"/evidence","html":"/paper/2301.09703/citation-record","integrity":"/paper/2301.09703/integrity","json":"/paper/2301.09703/citation-record.json","paper":"/paper/2301.09703"},"outbound":[],"paper":{"arxiv_id":"2301.09703","last_updated":"2023-01-23T20:23:35Z","latest_version":1,"primary_category":"cs.AI","snapshot_observed_at":"2026-08-11T00:31:17.402420Z","submitted_at":"2023-01-23T20:23:35Z","title":"Two-Stage Learning For the Flexible Job Shop Scheduling Problem"},"reference_resolution":{"displayed":0,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":0,"verified_exact":0,"verified_fuzzy":0},"total_outbound_references":0},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"thesis":"As of 11 August 2026, this Paper Citation Record lists 0 of 0 outbound references and 1 inbound Pith citation observation for arXiv:2301.09703."}