{"as_of":"2026-08-24T01:24:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:ad6d4d719b349d17003736d17fe9f9ac36aa9e8bd0a28527c8db1559957e57f4","coverage":[{"denominator":36,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":36,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-10T14:24:36.756011Z","state":"measured"},{"denominator":36,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":36,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-23T06:30:58.430688+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2501.15406/citation-record","integrity":"/paper/2501.15406/integrity","json":"/paper/2501.15406/citation-record.json","paper":"/paper/2501.15406"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.314373Z","title":"Risk-based resource allocation for collaborative system design in a distributed environment,","venue":null,"work_id":"a5b96b49-3b29-44f6-9e03-3335cf9be759","year":2008},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.626971Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:a5daaa7bc2e2e6e69a2e371cd058f07f6140327880223e4fccb4b2b24fa88ef7","observation_id":"79e6f34a-39be-4302-bf02-9cfa891cd2fe","resolution":{"observed_at":"2026-08-10T14:24:37.318274Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.303236Z","title":"Uncertainty quantification in dynamic system risk assessment: a new approach with randomness and fuzzy the- ory,","venue":null,"work_id":"5fdabe0d-eb1e-4b35-a64f-5904464037c6","year":2016},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.631846Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:d418112c52c5242f60f8597a772bba2e40f8d3b6dddf7d2aaf7fca6bda67dc95","observation_id":"d78213aa-59be-4bc6-84e7-6070c5534d26","resolution":{"observed_at":"2026-08-10T14:24:37.307170Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.291900Z","title":"Petri net extensions for modelling and validating manufacturing systems,","venue":null,"work_id":"84ca1045-6a47-436d-aef3-de9856a9703a","year":1994},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.635775Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:943ea8e84d640ad70e1eeb78739436f917027702fbacb7c11551a63b549f7fb0","observation_id":"8495d3d4-7461-4d34-92b3-15123926ee8c","resolution":{"observed_at":"2026-08-10T14:24:37.295777Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.280762Z","title":"Availability modelling of repairable systems using bayesian net- works,","venue":null,"work_id":"65f4a0a0-6994-42a4-afe1-4821288ce816","year":2012},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.639522Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:be8a27ee5c2de99ef300a201c3f58b86ee4b1895945fc0f27dc0f88827aef745","observation_id":"7d625d36-bc5b-4be3-9b9d-b6bf8e513c91","resolution":{"observed_at":"2026-08-10T14:24:37.284771Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.268889Z","title":"A framework for building dimensionless behavioral models to aid in function- based failure propagation analysis,","venue":null,"work_id":"04ccd4e9-7d92-4007-8040-e5d5964c3689","year":2011},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.643265Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:bb2888bc5bef42c2ef881101d1fbf9a99ffef56781c39b321c1945fa0614246c","observation_id":"6c76bc32-7ba0-4eac-a26f-47a7079e7072","resolution":{"observed_at":"2026-08-10T14:24:37.272989Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.257835Z","title":"Generalised fuzzy cognitive maps: Consid- ering the time dynamics between a cause and an ef- fect,","venue":null,"work_id":"f0f362b6-f061-44f5-9cf6-90531ae66b1d","year":2020},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.647192Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:75f92c031d519580cc0c1f64779002d9a739db6ea4e821d8aefe0906c3062d28","observation_id":"b50c1765-97d5-490b-a033-7dd723b370ca","resolution":{"observed_at":"2026-08-10T14:24:37.261613Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.246564Z","title":"Fuzzy cognitive maps,","venue":null,"work_id":"318916ee-48ae-4003-931a-37bcc8697135","year":1986},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.651119Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:7410d26223a8baa51d4d23129356ec050f50dea6c910af8a47a7a27f612bda5f","observation_id":"9a633271-7493-4a76-96f6-91380f497df4","resolution":{"observed_at":"2026-08-10T14:24:37.250603Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.235117Z","title":"A review of fuzzy cognitive maps research during the last decade,","venue":null,"work_id":"ef53dc4c-5ac1-4832-b883-06535d5a1730","year":2012},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.654796Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:3e2d511e106e8971add25a9c705d6406b4b1ad35cdaa59f08f2e93bbe246269b","observation_id":"de37e054-b540-41b1-844f-a137321d5e49","resolution":{"observed_at":"2026-08-10T14:24:37.238966Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.222357Z","title":"A review on methods and software for fuzzy cognitive maps,","venue":null,"work_id":"3ab42cab-800b-4785-be4e-4720063830b6","year":2019},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.658399Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:c447ef0b2f497e04ba2a7c694590e1adbc1ac26aed08f566e8ea6a37ce2afe2c","observation_id":"d5de8057-cc17-429e-a186-bfb313c06d12","resolution":{"observed_at":"2026-08-10T14:24:37.226464Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.210927Z","title":"Fault tree analysis: A survey of the state-of-the-art in model- ing, analysis and tools,","venue":null,"work_id":"7c93b996-ccb9-4f6b-bf28-ed3ec15a5f81","year":2015},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.661903Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:3beeeb34e3b6c7124e11961317d3ce99dfe552c6d59ee729ed0f712bf159d3e5","observation_id":"d0a9a0bd-55f7-493c-aa5a-8e5bc000f17a","resolution":{"observed_at":"2026-08-10T14:24:37.214833Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.199907Z","title":"Failure mode and effect analysis improve- ment: A systematic literature review and future re- search agenda,","venue":null,"work_id":"960ce7be-4fa1-4805-bce9-874988527ff2","year":2020},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.665582Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:83a7e8b74150cce356f88dcafd6d67fa9fb78e93e374325daa1c78982c8d8e3f","observation_id":"c2907689-f495-4a27-8b6c-31762b573733","resolution":{"observed_at":"2026-08-10T14:24:37.203869Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.187786Z","title":"On a machine interference problem with several types of machines attended by a single repairman,","venue":null,"work_id":"1e6ae3bc-0e91-40bf-b3f1-2245ddeba906","year":1983},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.669332Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:1854cf5e20c0c029f20b806ce98366e1e3367ed098bdaf31790cb3b0e6e4a949","observation_id":"3bafb5f0-e573-4511-9b63-91021c86fcc2","resolution":{"observed_at":"2026-08-10T14:24:37.192256Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.065702Z","title":"Time-dependent risk associated with dete- rioration of highway bridge networks,","venue":null,"work_id":"b014cce7-1db8-4f08-a3e0-dfcd1125a36b","year":2013},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.672519Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:62a7a6df45f0a234770e273c3fc00e802d8db27a07e6748911c824462de32c42","observation_id":"20838eb0-997f-411d-8a73-d4afc7cbb8e8","resolution":{"observed_at":"2026-08-10T14:24:37.069626Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.053877Z","title":"Monte carlo simulation of tolerance synthesis equations,","venue":null,"work_id":"83ec75b7-b3cc-47a8-9a63-cbfc4dfa23da","year":2001},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.676347Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:848c52c5a13684b3e15eedee3453d3c9d0aeb55d9232c611a33b19e78d7222f7","observation_id":"dcdb5532-861e-4cd3-bc5d-c1501048489d","resolution":{"observed_at":"2026-08-10T14:24:37.058096Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.041892Z","title":"Reliability analysis with monte carlo simulation and dependent kriging pre- dictions,","venue":null,"work_id":"73d9f280-375b-429a-a311-b04cdf08cd52","year":2016},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.679745Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:b13a77947e79b2f944b16139929b32f9d3d0cea04a386e79ed0fc2ec00822af8","observation_id":"ae018ab8-8e7a-43ca-90d5-9bd31e1b8918","resolution":{"observed_at":"2026-08-10T14:24:37.046290Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.030603Z","title":"Quantitative risk analysis of offshore drilling op- erations: A bayesian approach,","venue":null,"work_id":"b7e75de8-bd06-4ade-810c-385f51389452","year":2013},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.683227Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:810d06bf19855d0131233ca84d3c1bf4fe0d77ccaf9d2e1cc8c2f9396ce6f113","observation_id":"e59e0c06-8240-4533-9547-29f67487be6c","resolution":{"observed_at":"2026-08-10T14:24:37.034596Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.018600Z","title":"Resilience model- ing and quantification for engineered systems using bayesian networks,","venue":null,"work_id":"16f5a769-44b7-4628-ad0e-e9077845fb47","year":2016},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.686654Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:02b217129f49b62156c53719f663f33ba7272a887debc669a463114766c388a2","observation_id":"b2171666-73dd-4e0f-b361-ab9244ca57d4","resolution":{"observed_at":"2026-08-10T14:24:37.022858Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:37.004546Z","title":"Bayesian computer-aided experimental de- sign of heterogeneous scaffolds for tissue engineer- ing,","venue":null,"work_id":"54da0a09-256c-4e00-90b5-781f7f90f08b","year":2005},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.690219Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:a8f92f22000ed6f57104109fb8fdb3feb9fab5defb53d067c525d892d3a98411","observation_id":"496d1340-530a-4c61-8dc8-406767a75bf6","resolution":{"observed_at":"2026-08-10T14:24:37.009601Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.991240Z","title":"Applica- tions of bayesian networks and petri nets in safety, reliability, and risk assessments: A review,","venue":null,"work_id":"6ef6da53-50bf-47d6-81c3-608f648fb1c6","year":2019},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.693736Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:1229c6351684e89235ab73b2230bea597fab17705a0e8974f7c2bbfb0dfc36c7","observation_id":"e397a33d-7ea4-436e-b630-27d458c874b4","resolution":{"observed_at":"2026-08-10T14:24:36.995542Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.979304Z","title":"Extended object- oriented petri net model for mission reliability sim- ulation of repairable pms with common cause fail- ures,","venue":null,"work_id":"55b6beb5-d7f9-49a9-9a29-9005cd39ba09","year":2015},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.697500Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:8a67f10cb661434b6f4e32e331aafec5644dc524871a0a655134b815b400d616","observation_id":"7799b84a-7ff9-47de-93e0-1bbbf9933257","resolution":{"observed_at":"2026-08-10T14:24:36.983584Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.968438Z","title":"Modeling the design process of product variants with timed colored petri nets,","venue":null,"work_id":"636ed8a7-e283-4471-906e-3c6cf25ed3b2","year":2009},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.700996Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:6764eb6b649f73df708da1bf35593ab7807c4570e3797f5927cd72c2f3dfebcf","observation_id":"4347be95-5d77-490c-9965-1c1f2f765706","resolution":{"observed_at":"2026-08-10T14:24:36.971977Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.957659Z","title":"Bayesian in- ference in probabilistic risk assessment—the current state of the art,","venue":null,"work_id":"06b074be-d9bb-42ac-9b83-0a7255a7106d","year":2009},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.705238Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:a3fca115a09c1b9807e385c39601bc4b46996e04e3e26d07c8f238fcdf6a1864","observation_id":"814b3687-f235-4c99-a505-f73d1e39d79c","resolution":{"observed_at":"2026-08-10T14:24:36.961444Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.947206Z","title":"Markov re- generative stochastic petri nets to model and eval- uate phased mission systems dependability,","venue":null,"work_id":"cb3d0094-548b-4de4-b34f-595ca2f524af","year":2001},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.708730Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:feafaa3b57398573cbc612aad55b2514661fb85784f3847128646b9dd6db7da6","observation_id":"ac170607-a692-42bf-9628-211229d0443c","resolution":{"observed_at":"2026-08-10T14:24:36.950869Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.936635Z","title":"Soft- ware failure prediction based on a markov bayesian network model,","venue":null,"work_id":"0c83841a-830b-49d4-92a5-3f2ca2c0fd10","year":2005},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.712470Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:604a1c16c9e7d6c4f2d004eb8af29b0943c3b4bc75431c969a7f0abde28f4d19","observation_id":"349acaf4-ec18-4ae8-834c-d69ca4dfbfcf","resolution":{"observed_at":"2026-08-10T14:24:36.940397Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.924269Z","title":"A bayesian monte carlo-based algorithm for the estimation of small failure probabilities of systems affected by uncertainties,","venue":null,"work_id":"adfdc488-bcb7-483b-9b01-8e8cec3d23ae","year":2016},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.716277Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:c16111404b6d7395629c0f149c5666b459104ad9f4cfefadd40fb3618e30ba32","observation_id":"8ea70697-ccf4-4919-b417-16e92d79520a","resolution":{"observed_at":"2026-08-10T14:24:36.928630Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.912800Z","title":"Dcr-based causal design knowledge evaluation method and system for future cad applications,","venue":null,"work_id":"22ca84c8-81c5-4d6d-9ad1-b81875afa24b","year":2012},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.719824Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:b6832a9dec493a5fa6c73749f11a386e63f5607ec4226207fd8e064efe7d1390","observation_id":"4182e569-067e-4e2e-af56-f784a6a13b52","resolution":{"observed_at":"2026-08-10T14:24:36.916780Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.901255Z","title":"I., 2013, Fuzzy cognitive maps for applied sciences and engineering: from fundamen- tals to extensions and learning algorithms , V ol","venue":null,"work_id":"d5669e6c-a35f-4d8e-a7a4-ae860eafc395","year":2013},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.723386Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:a5a1efb6b233aeacdfdaf9fe9fa4af5f49b0cc9bb40234e070ee3ce4ee86aef5","observation_id":"2de8add6-6934-4c0e-8ff4-39da84fad6fe","resolution":{"observed_at":"2026-08-10T14:24:36.905310Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.889848Z","title":"A hybrid intelli- gent model for assessment of critical success factors in high-risk emergency system,","venue":null,"work_id":"39c73de1-cd80-469e-94aa-85000db47ad3","year":2018},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.727163Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:640d184393130dd25862797c78ec5b50157ae39e332990c4ed71f2604acdec44","observation_id":"fe984310-1007-4081-a571-a7ea8aba6a2f","resolution":{"observed_at":"2026-08-10T14:24:36.893811Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.876529Z","title":"Dynamic risks modelling in erp maintenance projects with fcm,","venue":null,"work_id":"79215731-3a0e-4487-97b9-d5c8d052d830","year":2014},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.730576Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:3ee43709d0cb2091e72f128b1d0e30f5c287996598c4e1c5621ff15b576f0690","observation_id":"50dda42f-6e0f-491d-9b19-b95f98539df3","resolution":{"observed_at":"2026-08-10T14:24:36.882113Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.863560Z","title":"Analyzing risk impact factors using extended fuzzy cognitive maps,","venue":null,"work_id":"25930d19-bf11-4f93-ad38-410033b7258d","year":2011},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.734399Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:3a94a174d5ac7bb6db4c70963bb4381f64867fe161fe271661500003b683f5bd","observation_id":"dba09ad9-df23-4b57-97cf-b0321c99a9de","resolution":{"observed_at":"2026-08-10T14:24:36.867709Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.850761Z","title":"A hybrid decision-making approach based on fcm and moora for occupational health and safety risk analysis,","venue":null,"work_id":"d03e814f-9f7f-49e2-9b17-b21b56f7d6ae","year":2019},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.738017Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:537b2bc18537a3f6ebc5fbfc28d33314760a2c250a10bc39e16574a4a6a8a314","observation_id":"0411b178-680e-4e44-b33d-ab928e410632","resolution":{"observed_at":"2026-08-10T14:24:36.855655Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.838098Z","title":"Risk evaluation in failure mode and effects analysis using fuzzy weighted geomet- ric mean,","venue":null,"work_id":"af2f2e47-7d79-4542-9a9d-c18fe7af6ae1","year":2009},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.741651Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:8a1c3441644bb3faff6ea670df2dae22c6ebd7ce6a4650aebba19ca9a1b675d1","observation_id":"27a67013-b9e7-412c-a60a-4f57ce8136c9","resolution":{"observed_at":"2026-08-10T14:24:36.841990Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.825450Z","title":"A decision-making method for complex system de- sign in a heterogeneous language information envi- ronment,","venue":null,"work_id":"43812d98-7621-4386-80ad-b7345ad1d6d1","year":2021},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.745359Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:9758d2e225a579006ffe0c4b30984329ae49bec9384b1528bba2e973180bc36d","observation_id":"6e82dc70-676d-4f3c-966f-dd85a255ff3f","resolution":{"observed_at":"2026-08-10T14:24:36.829628Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.810764Z","title":"Probabilistic linguistic term sets in multi-attribute group decision making,","venue":null,"work_id":"53fe7634-163b-4178-806a-4094da87f1cd","year":2016},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.748770Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:d9c5dc4b0ef46e2f09525d02e7a7e03451756b7e8ecaa49495c8c898316d213e","observation_id":"bb8d185c-a5b0-4346-8de7-3ab89ae0737d","resolution":{"observed_at":"2026-08-10T14:24:36.815356Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.798316Z","title":"Consensus, dissension and pre- cision in group decision making by means of an al- gebraic extension of hesitant fuzzy linguistic term sets,","venue":null,"work_id":"1540f80a-2115-4c1c-975f-57a4f101e690","year":2018},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.752409Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:2bfcf93af433a698154786ad05d041a7b1f5d3ab3587b9aee61de9d7478a7fdb","observation_id":"d37964f2-f3e6-487b-99cf-97e211c2f277","resolution":{"observed_at":"2026-08-10T14:24:36.802486Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T14:24:36.784225Z","title":"Approximating the condition and maximum load of an engine by comparing en- gine measurements,","venue":null,"work_id":"4e6bcf2b-3361-434a-a6de-f5504b5083f6","year":2016},"citing_paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs","version":1},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-10T14:24:36.756011Z"},"links":{"citing_paper":"/paper/2501.15406"},"observation_digest":"sha256:7d884c00ab7792cb93d5db7ea0ae73297ad5c74946edca938a39e2b710cbfae7","observation_id":"3ef54d7e-04c7-42d6-be44-1e21ca506a87","resolution":{"observed_at":"2026-08-10T14:24:36.790299Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-23T06:30:58.430688+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2501.15406","last_updated":"2025-01-26T05:22:45Z","latest_version":1,"primary_category":"cs.CE","snapshot_observed_at":"2026-08-20T13:54:53.562897Z","submitted_at":"2025-01-26T05:22:45Z","title":"A Token-FCM based risk assessment method for complex engineering designs"},"reference_resolution":{"displayed":36,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":0,"verified_exact":0,"verified_fuzzy":36},"total_outbound_references":36},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-23T06:30:58.430688+00:00","source":"crossref"},{"observed_at":"2026-08-23T06:30:53.778098+00:00","source":"retraction_watch"}],"thesis":"As of 24 August 2026, this Paper Citation Record lists 36 of 36 outbound references and 0 inbound Pith citation observations for arXiv:2501.15406."}