{"as_of":"2026-08-18T17:39:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:fa008f52c87ece6fce3836b10a03bff7fb219563f36e09b8c7320eb6400d0539","coverage":[{"denominator":38,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":38,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-16T10:32:04.773135Z","state":"measured"},{"denominator":40,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":40,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-18T06:34:40.430872+00:00","state":"measured"},{"denominator":2,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":2,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T14:06:19.153167Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"pith","source_observed_at":"2026-08-06T22:05:31.524107Z","state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2504.18604","snapshot_observed_at":"2026-08-07T14:06:19.153167Z","title":"arXiv preprint arXiv:2504.18604 (2025)","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2506.18727","last_updated":"2025-05-26T14:02:18Z","snapshot_observed_at":"2026-08-18T16:06:19.270795Z","submitted_at":"2025-05-26T14:02:18Z","title":"AutoGraph: A Knowledge-Graph Framework for Modeling Interface Interaction and Automating Procedure Execution in Digital Nuclear Control Rooms","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-07T14:06:19.153167Z"},"links":{"cited_paper":"/paper/2504.18604","citing_paper":"/paper/2506.18727"},"observation_digest":"sha256:8398a4eb1e4f299142ed81c4300da5eb7b983979cb698447b62de54d8104ed40","observation_id":"54c16cf3-fbc5-4021-be55-5eb04c48b364","resolution":{"observed_at":"2026-08-07T14:06:19.153167Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"cited_work":{"arxiv_id":"2504.18604","doi":null,"metadata_source":"pith","pith_arxiv_id":"2504.18604","snapshot_observed_at":"2026-08-06T22:05:31.524107Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","venue":"cs.AI","work_id":"a59d3ede-a1b6-4ad8-bc88-f7f976cd4713","year":2025},"citing_paper":{"arxiv_id":"2507.00066","last_updated":"2025-06-28T02:04:06Z","snapshot_observed_at":"2026-08-11T17:30:19.767645Z","submitted_at":"2025-06-28T02:04:06Z","title":"InSight-R: A Framework for Risk-informed Human Failure Event Identification and Interface-Induced Risk Assessment Driven by AutoGraph","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-06T22:05:30.083385Z"},"links":{"cited_paper":"/paper/2504.18604","citing_paper":"/paper/2507.00066"},"observation_digest":"sha256:93a8338853435b0f974ad5b76972b33a93b1456c30b4b4d329820430385491fc","observation_id":"ebce1cd4-e292-4d90-9507-abde83656f89","resolution":{"observed_at":"2026-08-06T22:05:31.570436Z","resolver_source":"local_arxiv","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}}],"links":{"evidence":"/evidence","html":"/paper/2504.18604/citation-record","integrity":"/paper/2504.18604/integrity","json":"/paper/2504.18604/citation-record.json","paper":"/paper/2504.18604"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:04.612631Z","title":"Reliability Engineering & System Safety, 111080 (2025)","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.612631Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:aa89f3887614933698a9e498654c85cae97080a102e93c49ab50e5a32bdf36a2","observation_id":"19dd69b8-9aa5-4770-a721-4651f8e004e8","resolution":{"observed_at":"2026-08-16T10:32:04.612631Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.401871Z","title":": The spar-h human reliability analysis method","venue":null,"work_id":"57e4f78c-8985-42bb-a8ee-654d89b1f768","year":2005},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.617704Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:d8089b97e4a1181ab8bd54642ca41d4e8876b558e273fcd703cdbc2d3c1cfb72","observation_id":"950ebb2b-2398-44ac-ac7d-bc8827ddcdfb","resolution":{"observed_at":"2026-08-16T10:32:05.406368Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.388223Z","title":"Technical report, Idaho National Lab.(INL), Idaho Falls, ID (United States) (2012)","venue":null,"work_id":"212d0e7b-c4ca-4d48-b55d-817ec89a9b26","year":2012},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.622272Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:7a733367bbe4c6c0d2b5659ca330292f8ff0fed2cc417fe6dd8d1dfab5f2814e","observation_id":"b48f633d-ccbe-4a00-957b-02de37438c01","resolution":{"observed_at":"2026-08-16T10:32:05.392586Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:04.626670Z","title":"US Nuclear Regulatory Commission, Washington, DC (2020)","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.626670Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:eef9060ccdd9d7da9929b5e3539e89f20182d6f8ff54be109b4e0e8851adff70","observation_id":"d4bdd31c-028a-4b0b-9991-ad42c97cdd57","resolution":{"observed_at":"2026-08-16T10:32:04.626670Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.365210Z","title":"Reliability Engineering & System Safety 194, 106235 (2020)","venue":null,"work_id":"25efb16b-50e3-4dbf-9058-2a520e0161ab","year":2020},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.631245Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:8135d4245d3353f5c38787b3ccc63e0b4024771f1420d76770fa65b5cf9cdc03","observation_id":"245092f7-62a7-413b-adeb-e0875b16a37d","resolution":{"observed_at":"2026-08-16T10:32:05.369770Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.351570Z","title":": The sacada database for human reliability and human performance","venue":null,"work_id":"8a91d6ff-d805-4983-8a09-36999816f355","year":2014},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.635698Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:ed2bc9ed4cfacb621bbc407250e7f1a46cabc3f2d6d110d706626dd88d86d271","observation_id":"e85dc1b4-ff78-4fac-802a-e26031728ff7","resolution":{"observed_at":"2026-08-16T10:32:05.356021Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.337873Z","title":"Nuclear Engineering and Design 218(1-3), 249–257 (2002)","venue":null,"work_id":"56aaca5b-b2ac-494d-b8fc-d737aefb308e","year":2002},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.640696Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:51723b0e2ebbe5c4a70fbbe7cfc5be8a81f81417682a4ada0eb2700037406748","observation_id":"f2fc918d-5b31-496d-93aa-590f281a7b0c","resolution":{"observed_at":"2026-08-16T10:32:05.342226Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.324004Z","title":"Progress in Nuclear Energy 73, 75–85 (2014)","venue":null,"work_id":"3d9ea3f4-6784-4223-86e7-2f6697d7121f","year":2014},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.644907Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:adbdfcbc4e6cd1bf6da0906d3e11fdc92e9b32b840bf2fbccc6346d184873413","observation_id":"57d585ce-e6a4-45c8-8eca-51e4db63a437","resolution":{"observed_at":"2026-08-16T10:32:05.328412Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.309612Z","title":null,"venue":null,"work_id":"c10d141a-378f-4b7d-98cd-e1085ccc9c62","year":2014},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.649234Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:42f83abe2130eb3c974a599053740349e65ddc56d84f1c92b3ee4ef0b0135c98","observation_id":"9649bdf8-5e19-43cc-bbd7-f1850f545d66","resolution":{"observed_at":"2026-08-16T10:32:05.314607Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.295454Z","title":"Energies 16(15), 5601 (2023)","venue":null,"work_id":"31395789-5db2-4644-bbcf-20c4f259cdc0","year":2023},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.653316Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:0ea2d25988ce949b626c32036e365c31b9ef3cd75475c79945d24f4eed7af81b","observation_id":"be42f52e-a1d2-4dd9-9f5d-2d575a843a92","resolution":{"observed_at":"2026-08-16T10:32:05.299946Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.281992Z","title":"Sandia Corporation, ??? (1964)","venue":null,"work_id":"1c611be5-0d99-4903-9e03-c66ba1d78692","year":1964},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.657568Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:475c1b349b48e7739a6d4f9ca21fbc5da7adb7a019d2a5617f5d9836fcf99433","observation_id":"cf909550-07e9-4ae3-b362-45699f3d4138","resolution":{"observed_at":"2026-08-16T10:32:05.286280Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.267434Z","title":"In: Conference Record for 1985 IEEE Third Conference on Human Factors and Nuclear Safety (1985)","venue":null,"work_id":"287c0265-ebce-4711-a820-ba40928a0c2b","year":1985},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.661658Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:881348911ae5102fb1c42e28ddc4bbf1eb5f2529f4501fb10d23db12cdf8c573","observation_id":"18ca6aab-1f0a-431f-8bf1-23ae6b02cc14","resolution":{"observed_at":"2026-08-16T10:32:05.272235Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.252352Z","title":"Elsevier, ??? (1998)","venue":null,"work_id":"ebb8c416-109d-4113-9ebd-b3553e1ed072","year":1998},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.665980Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:1bbe51f0e1c3e19cbb99ad623a54c1c993944b1f8d8caa0737368d329c020ddc","observation_id":"d3db5a17-25c6-434f-afa3-0628a8e75ea6","resolution":{"observed_at":"2026-08-16T10:32:05.256605Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.238138Z","title":"Technical report, Nuclear Regulatory Commission (1996)","venue":null,"work_id":"3455ff23-74e7-477f-b39e-39a41bbd4c17","year":1996},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.670120Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:8cf9e62c30335005e2596f179425a04d0eb1cfe3be4e07018cfca65af51ebae1","observation_id":"d5fc09f3-4402-4fd2-9baf-625924f7021d","resolution":{"observed_at":"2026-08-16T10:32:05.242923Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.223778Z","title":"RIL-2021-XX (2021)","venue":null,"work_id":"72276c6d-1e87-46a0-b6de-b07f251f80bc","year":2021},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.674165Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:c3200c12e2aea80683ff3e8c2f03cdb37ac189fdd224f1fd57535dd5f94c6021","observation_id":"17aa08d6-5f75-4474-a4f3-92e8d73dfb17","resolution":{"observed_at":"2026-08-16T10:32:05.228496Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2412.18627","last_updated":"2024-12-20T06:21:34Z","snapshot_observed_at":"2026-08-16T20:27:01.254911Z","submitted_at":"2024-12-20T06:21:34Z","title":"KRAIL: A Knowledge-Driven Framework for Base Human Reliability Analysis Integrating IDHEAS and Large Language Models","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2412.18627","snapshot_observed_at":"2026-08-16T10:32:04.678374Z","title":"arXiv preprint arXiv:2412.18627 (2024)","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.678374Z"},"links":{"cited_paper":"/paper/2412.18627","citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:8a74b334add834e940fb4a7b427ac2623d08637af9019bdf8b45e3c18ec570ad","observation_id":"3421120c-f832-49e7-b801-8783553ec87a","resolution":{"observed_at":"2026-08-16T10:32:04.678374Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.209130Z","title":"Reliability Engineering & System Safety 221, 108326 (2022)","venue":null,"work_id":"000a662b-8a5c-496a-8b2a-59842bcb35e2","year":2022},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.682846Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:ee437763deb760e090ca4f5d9a3c08f162bf08b0dccceaf519ea6e0910ae4d39","observation_id":"3de72360-a478-49a0-9d05-b1c7efe1a888","resolution":{"observed_at":"2026-08-16T10:32:05.213823Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.194744Z","title":"Reliability Engineering & System Safety 92(8), 997–1013 (2007)","venue":null,"work_id":"590d49cc-9a4f-47ed-9f86-c6744a96a243","year":2007},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.687245Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:ff29296b230a9cd3af7f3690d5592580f3a2bfc17b4d5ec1e8282dd854c045f5","observation_id":"0ea326b2-80bf-446d-ad22-fa2059a5972b","resolution":{"observed_at":"2026-08-16T10:32:05.199535Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:04.691498Z","title":"ACM Transactions on Computer-Human Interaction (TOCHI) 13(1), 37–70 (2006)","venue":null,"work_id":null,"year":2006},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.691498Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:bbca155a2cd5bdb83720d1d4d92f1d11d6fe18809e3eb6eb8625f35831650984","observation_id":"8d1c2e79-aade-43f7-bb97-083479ceea18","resolution":{"observed_at":"2026-08-16T10:32:04.691498Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.171336Z","title":"Human–Computer Interaction 12(4), 439–462 (1997)","venue":null,"work_id":"869946cf-25f8-4bb7-814c-21315e659bc6","year":1997},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.695932Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:7c3af31a9cb4126ce2f0636768b613420b38826c2db8d7f57f6864360d7675db","observation_id":"8d880661-6601-44da-8097-594ccaafc084","resolution":{"observed_at":"2026-08-16T10:32:05.175986Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.157361Z","title":"EJNMMI research 7, 1–10 (2017)","venue":null,"work_id":"60193455-9822-4e6b-b437-8249f039c1a1","year":2017},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.700523Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:ea348dfdae763bf9371246393556090dd4c032df696dac176b5cc56bb4956259","observation_id":"cc9aaea8-ee96-459e-ae10-71b7a5c0f116","resolution":{"observed_at":"2026-08-16T10:32:05.161676Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.142794Z","title":"Reliability Engineering & System Safety 254, 110541 (2025)","venue":null,"work_id":"4b55a678-eafe-4fc7-b46e-c339d8bb6000","year":2025},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.704345Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:85650c28b27bb897b4e878e5c219ea23fc4366de57263a62315164837dfcc96c","observation_id":"d6146930-9b0e-4a8d-8727-b598a0512dba","resolution":{"observed_at":"2026-08-16T10:32:05.147386Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:04.708190Z","title":"Energies 17(10), 2439 (2024)","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.708190Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:9c15f2263e9d462ca790331bb3f2d5d2cd9aa5d69ee445d2b996d0ffc67c6e9e","observation_id":"c17f9141-d0ee-4fc6-87fa-1b8835af1c57","resolution":{"observed_at":"2026-08-16T10:32:04.708190Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.119196Z","title":"International Journal of Performability Engineering 10(7) (2014)","venue":null,"work_id":"886cab58-c2b2-4abe-9dff-753eb769070b","year":2014},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.712017Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:7e9149e81002bb5d27f2ddf6a8129e533c9e13e69c6506f193c9c9ece8241bdc","observation_id":"e2824a3a-1791-46b7-b596-b2f13778af6e","resolution":{"observed_at":"2026-08-16T10:32:05.123779Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:04.716157Z","title":"In: International Conference on Nuclear Engineering, vol","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.716157Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:54e3e6d71f92f6cfcd175b8de642d98f8416d44410dd2e2866e8c2a1d669e44b","observation_id":"539c0c63-c63d-433d-a713-f87bc8181f5e","resolution":{"observed_at":"2026-08-16T10:32:04.716157Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.094800Z","title":"IEEE Transactions on Intelligent Transportation Systems 9(3), 463–475 (2008)","venue":null,"work_id":"8878ac2e-5eed-4731-b820-0f6454b84a65","year":2008},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.720442Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:ee079cf3266c0e3af3e2125ab242a7a32f1cc28c5c3016dc940fb2826bbd4e81","observation_id":"8dbc56a8-8246-4630-a664-4ada67530158","resolution":{"observed_at":"2026-08-16T10:32:05.099827Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.080217Z","title":"In: Proceedings of the Human Factors and Ergonomics Society Annual Meeting, vol","venue":null,"work_id":"eff6752b-da27-4835-bf88-507c6dd26f6d","year":2003},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.724600Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:6877e1fbde91ad842d3f13c314fcab530589ed494f1e357cb87cd0adccce0cdc","observation_id":"d90dcd08-4e5f-4a56-8fb4-130ab9717742","resolution":{"observed_at":"2026-08-16T10:32:05.084880Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.066157Z","title":"In: Proceedings of the Sixteenth Annual Conference of the Cognitive Science Society, pp","venue":null,"work_id":"a09c3a43-4786-4a74-8aa8-27a5dd232e27","year":2019},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.728598Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:072d0d9a513a957608c985e81834fc0fee321ca1c1da200070fd4eea307b5661","observation_id":"349df8df-b2cb-4653-8bc0-ef569b2d7aa9","resolution":{"observed_at":"2026-08-16T10:32:05.070650Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.052164Z","title":"Cogni- tion and multi-agent interaction: From cognitive modeling to social simulation, 29–52 (2006)","venue":null,"work_id":"61689054-8463-40a9-9524-7ce2303e6426","year":2006},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.732941Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:b2de2d3b1a79cf1dd5769075077b0c5c8f5719e99fa2b6b4ecc031e8e42b7249","observation_id":"76714cbe-f34c-4d80-9881-ec8500539a47","resolution":{"observed_at":"2026-08-16T10:32:05.056782Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.035982Z","title":": Computational cognitive modeling of pilot performance in pre-flight and take-off procedures","venue":null,"work_id":"9e52776a-880c-47ee-8d54-af733087ee97","year":2024},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.737031Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:94b2ba1b57cba2379190f523098a8e09ebce56599f45481ea32b06d866320709","observation_id":"1f470982-4dce-4b59-af3c-142d588b5218","resolution":{"observed_at":"2026-08-16T10:32:05.041171Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.020173Z","title":"International Journal of Industrial Ergonomics 42(4), 359–370 (2012)","venue":null,"work_id":"956198c4-0c4a-4448-8498-9ee55a5f2b81","year":2012},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.741069Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:c2168a80876d46a508a3ae322558e293f1c722ff9af9abecb182aac7434d653b","observation_id":"356531c1-4867-4364-b480-08de7cbb7e0a","resolution":{"observed_at":"2026-08-16T10:32:05.025054Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:05.004832Z","title":"International Journal of Human-Computer Studies 55(1), 41–84 (2001)","venue":null,"work_id":"25f9f5d9-bfa0-497c-9551-9c80b8097ffc","year":2001},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.745048Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:27704f1cfb5e28ddc13b0ed23462b9fc861b9a58c2dca29998c29eeb6fa2b247","observation_id":"9c1b3a2e-b117-413f-a8ca-96ea5b17dcbd","resolution":{"observed_at":"2026-08-16T10:32:05.010158Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:04.990130Z","title":"Nature reviews neuroscience 1(1), 41–50 (2000)","venue":null,"work_id":"7ebadbb7-35cd-4032-abf2-862cb4ee201c","year":2000},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.749533Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:00708be639c1a0816401e44cb92695090386fcd75287240d867fdaecad7b0e7b","observation_id":"077411d9-f81f-4052-b75e-21fb4a298faa","resolution":{"observed_at":"2026-08-16T10:32:04.994556Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:04.975513Z","title":null,"venue":null,"work_id":"ac604c1f-06e1-4ba4-99cf-9cc7ceb6af19","year":1985},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.753710Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:b34bc4cfe93c28f233495cd70385ff4fb2e2e3523a36d440afcc159144981170","observation_id":"482ddeeb-4e07-42c2-8ea7-ebed068baa3d","resolution":{"observed_at":"2026-08-16T10:32:04.979933Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:04.958668Z","title":"Human Factors 59(2), 299–313 (2017)","venue":null,"work_id":"b54cfbea-fd8c-4749-ac63-54422af2c3d0","year":2017},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.758323Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:9e65a547f17935ac15f3cfa0cd3f6d6f2ed3964ef43bc61503d411a5b509ac34","observation_id":"4eb7f998-003c-4068-88f9-f9fe85fe18a7","resolution":{"observed_at":"2026-08-16T10:32:04.964553Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:04.763567Z","title":"arXiv preprint arXiv:2503.09527 (2025)","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.763567Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:c61bcbec27b0fd72eb41008d33b3a5cae8f339bf5a59c52eb560d81b87003c41","observation_id":"ed877773-6443-4be6-a420-d27d36689431","resolution":{"observed_at":"2026-08-16T10:32:04.763567Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2311.16565","last_updated":"2023-12-02T16:48:09Z","snapshot_observed_at":"2026-08-17T14:07:43.503271Z","submitted_at":"2023-11-28T07:13:20Z","title":"DiffusionTalker: Personalization and Acceleration for Speech-Driven 3D Face Diffuser","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2311.16565","snapshot_observed_at":"2026-08-16T10:32:04.768555Z","title":"arXiv preprint arXiv:2311.16565 (2023)","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.768555Z"},"links":{"cited_paper":"/paper/2311.16565","citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:315bd7edba9509b595df7613f04e7b74c8596b34b5f260fff6f1d68d3e420b1f","observation_id":"f510b653-c23a-47cc-a3f4-1986acd99306","resolution":{"observed_at":"2026-08-16T10:32:04.768555Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T10:32:04.773135Z","title":"arXiv preprint arXiv:2412.04955 (2024) 30","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study","version":2},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-16T10:32:04.773135Z"},"links":{"citing_paper":"/paper/2504.18604"},"observation_digest":"sha256:c072e538eb3cacee98c48428d36f5f8bb45465b35eefe670805b291682d18ddd","observation_id":"8ed54664-df74-4095-995c-2bdcaa91544b","resolution":{"observed_at":"2026-08-16T10:32:04.773135Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2504.18604","last_updated":"2025-05-05T23:28:11Z","latest_version":2,"primary_category":"cs.AI","snapshot_observed_at":"2026-08-17T08:31:40.253836Z","submitted_at":"2025-04-25T00:46:00Z","title":"A Cognitive-Mechanistic Human Reliability Analysis Framework: A Nuclear Power Plant Case Study"},"reference_resolution":{"displayed":38,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":11,"verified_exact":0,"verified_fuzzy":27},"total_outbound_references":38},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"thesis":"As of 18 August 2026, this Paper Citation Record lists 38 of 38 outbound references and 2 inbound Pith citation observations for arXiv:2504.18604."}