{"as_of":"2026-08-22T09:16:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:dc1c5800652923615c9d6d82cd27fe2b222818591ae0e3c6802052649f7bcdc3","coverage":[{"denominator":16,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":16,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-16T04:52:54.834152Z","state":"measured"},{"denominator":16,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":16,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-22T06:32:14.747728+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2505.00225/citation-record","integrity":"/paper/2505.00225/integrity","json":"/paper/2505.00225/citation-record.json","paper":"/paper/2505.00225"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T04:52:54.964647Z","title":null,"venue":null,"work_id":"0a595304-1584-4cd0-a817-63cab0af4ec1","year":1999},"citing_paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers","version":1},"reference_index":1,"source":"arxiv_source","source_observed_at":"2026-08-16T04:52:54.782481Z"},"links":{"citing_paper":"/paper/2505.00225"},"observation_digest":"sha256:1c1d302480884f5824b7a41fb71ad43640fda206b2c97cd643ff5c62965b6a77","observation_id":"7fff03f4-1004-4000-a2a9-685f2bf3cf52","resolution":{"observed_at":"2026-08-16T04:52:54.967821Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T04:52:54.786967Z","title":null,"venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers","version":1},"reference_index":2,"source":"arxiv_source","source_observed_at":"2026-08-16T04:52:54.786967Z"},"links":{"citing_paper":"/paper/2505.00225"},"observation_digest":"sha256:0f487207418e5a6a9d57199af77198e5dcb3ca8510d4a1c45261a0ca767ddbbe","observation_id":"0a9afac1-3339-4088-b6bb-da5a590c8257","resolution":{"observed_at":"2026-08-16T04:52:54.786967Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T04:52:54.950316Z","title":null,"venue":null,"work_id":"aa432945-c500-4a3b-8fb6-00420b2272c4","year":2023},"citing_paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers","version":1},"reference_index":3,"source":"arxiv_source","source_observed_at":"2026-08-16T04:52:54.790431Z"},"links":{"citing_paper":"/paper/2505.00225"},"observation_digest":"sha256:f4b26f3c44ee07378d02d142c1357623cf768733c38b6dbcf35fff8ca9d46cfc","observation_id":"92a4d281-71cc-42dd-82e8-de6f1a89d9c8","resolution":{"observed_at":"2026-08-16T04:52:54.953688Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T04:52:54.793934Z","title":null,"venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers","version":1},"reference_index":4,"source":"arxiv_source","source_observed_at":"2026-08-16T04:52:54.793934Z"},"links":{"citing_paper":"/paper/2505.00225"},"observation_digest":"sha256:ac0be24d38ba53c7f59efa351bd8e58ad62c3b72b84e688dc0760d8d9917a41b","observation_id":"c0b15da6-e858-4088-a619-245a1fd2119b","resolution":{"observed_at":"2026-08-16T04:52:54.793934Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T04:52:54.797643Z","title":null,"venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers","version":1},"reference_index":5,"source":"arxiv_source","source_observed_at":"2026-08-16T04:52:54.797643Z"},"links":{"citing_paper":"/paper/2505.00225"},"observation_digest":"sha256:5bc23bcd4004e37757e2460184290d298c7daebdb07557f89cc01f66e6f8eed0","observation_id":"a573d8b0-27e3-40ec-bcc3-eb7b476a94a6","resolution":{"observed_at":"2026-08-16T04:52:54.797643Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2012.06678","last_updated":"2020-12-11T23:31:23Z","snapshot_observed_at":"2026-08-14T12:45:55.154777Z","submitted_at":"2020-12-11T23:31:23Z","title":"TabTransformer: Tabular Data Modeling Using Contextual Embeddings","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2012.06678","snapshot_observed_at":"2026-08-16T04:52:54.801098Z","title":null,"venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers","version":1},"reference_index":6,"source":"arxiv_source","source_observed_at":"2026-08-16T04:52:54.801098Z"},"links":{"cited_paper":"/paper/2012.06678","citing_paper":"/paper/2505.00225"},"observation_digest":"sha256:7ac803b62817fe6a717faa00e955d9edeae4db9ef5315d4f28f826418edf2e10","observation_id":"bc49a528-50c3-4dfe-9c70-d96f08569a2c","resolution":{"observed_at":"2026-08-16T04:52:54.801098Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T04:52:54.930601Z","title":"C.; and Joan, C","venue":null,"work_id":"9d237a62-6ba1-4d33-bb26-efdc88577bb0","year":2024},"citing_paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers","version":1},"reference_index":7,"source":"arxiv_source","source_observed_at":"2026-08-16T04:52:54.804921Z"},"links":{"citing_paper":"/paper/2505.00225"},"observation_digest":"sha256:f59683b40d882ec6bba44ede192b19f9a0e395e701aba550a8bd23a167c77c42","observation_id":"43ddd9d6-182d-4380-b9c3-d80f87017837","resolution":{"observed_at":"2026-08-16T04:52:54.934025Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T04:52:54.920400Z","title":"A.; Turner, B.; Levinson, S.; Chen, Y.; Roberts, N.; Prica, M.; and Iyengar, A","venue":null,"work_id":"04dfcfed-c39c-4b5e-ac55-ea5f2a7e8dfc","year":2022},"citing_paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers","version":1},"reference_index":8,"source":"arxiv_source","source_observed_at":"2026-08-16T04:52:54.808169Z"},"links":{"citing_paper":"/paper/2505.00225"},"observation_digest":"sha256:d281e4e34f5bfcab35260bef041e807094210c5ea57c99516c910be34d36edbc","observation_id":"f37497ad-aedc-4b60-9910-3f13109af17e","resolution":{"observed_at":"2026-08-16T04:52:54.924606Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T04:52:54.811521Z","title":null,"venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers","version":1},"reference_index":9,"source":"arxiv_source","source_observed_at":"2026-08-16T04:52:54.811521Z"},"links":{"citing_paper":"/paper/2505.00225"},"observation_digest":"sha256:8b6bde2937d1c5085aa420cc48e234a06ea28ea3bf08fa42b56fe53ea3f9c4c9","observation_id":"29174aff-dbe4-40c0-8739-5a93851febb8","resolution":{"observed_at":"2026-08-16T04:52:54.811521Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T04:52:54.814680Z","title":"B.; et al","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers","version":1},"reference_index":10,"source":"arxiv_source","source_observed_at":"2026-08-16T04:52:54.814680Z"},"links":{"citing_paper":"/paper/2505.00225"},"observation_digest":"sha256:600d8536c11e0203af6f4f9a62c426ee17c9384d537db3edb4509fa33873b862","observation_id":"59635fa5-aca8-4a62-8e45-5ff5d2876aec","resolution":{"observed_at":"2026-08-16T04:52:54.814680Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T04:52:54.817880Z","title":"M.; and Lee, S.-I","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers","version":1},"reference_index":11,"source":"arxiv_source","source_observed_at":"2026-08-16T04:52:54.817880Z"},"links":{"citing_paper":"/paper/2505.00225"},"observation_digest":"sha256:ea65880300fb2517174833da7379ab9ffe3a46ba200a324ce2a5e3667f042f87","observation_id":"02964569-06bf-472c-a562-d505819c01df","resolution":{"observed_at":"2026-08-16T04:52:54.817880Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T04:52:54.820981Z","title":"V.; and Gulin, A","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers","version":1},"reference_index":12,"source":"arxiv_source","source_observed_at":"2026-08-16T04:52:54.820981Z"},"links":{"citing_paper":"/paper/2505.00225"},"observation_digest":"sha256:4557e36dff6d5eac861b1b2865bd619a022bd15f08a9dff1307468fdff2cb61c","observation_id":"9f99c864-ba64-4e3e-bc41-52c7f9290ba2","resolution":{"observed_at":"2026-08-16T04:52:54.820981Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T04:52:54.889273Z","title":"C.; Wanik, D","venue":null,"work_id":"f3790fd1-6934-415b-8461-9c104527c34f","year":2020},"citing_paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers","version":1},"reference_index":13,"source":"arxiv_source","source_observed_at":"2026-08-16T04:52:54.824091Z"},"links":{"citing_paper":"/paper/2505.00225"},"observation_digest":"sha256:afbaa89eed96f1fac9db122da79ebea15d625e80ae58ef63fefa8d693193781e","observation_id":"821401bc-edde-4242-9427-19d36e4c82eb","resolution":{"observed_at":"2026-08-16T04:52:54.892597Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T04:52:54.878418Z","title":null,"venue":null,"work_id":"98898d61-5992-4938-bdeb-c0ad747c51e2","year":2018},"citing_paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers","version":1},"reference_index":14,"source":"arxiv_source","source_observed_at":"2026-08-16T04:52:54.827314Z"},"links":{"citing_paper":"/paper/2505.00225"},"observation_digest":"sha256:7b140a9f88706807bb08705a3a7d942781eccf67e8d51686080ff134aabe3b8d","observation_id":"76516402-6cdd-449e-94d3-c6ace655cef0","resolution":{"observed_at":"2026-08-16T04:52:54.882742Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T04:52:54.830427Z","title":", \" * write output.state after.block = add.period write newline","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers","version":1},"reference_index":15,"source":"arxiv_source","source_observed_at":"2026-08-16T04:52:54.830427Z"},"links":{"citing_paper":"/paper/2505.00225"},"observation_digest":"sha256:c84b7b369e94c97c7df4c3979e5b27b7330396d441c011de96d1ccdd1800899e","observation_id":"b1702429-19e6-471b-9711-de4ea9f9abff","resolution":{"observed_at":"2026-08-16T04:52:54.830427Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-16T04:52:54.834152Z","title":"write newline","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers","version":1},"reference_index":16,"source":"arxiv_source","source_observed_at":"2026-08-16T04:52:54.834152Z"},"links":{"citing_paper":"/paper/2505.00225"},"observation_digest":"sha256:2b65ef61152f05f51f9905fce744b25e071ccfebca50bc7d5d39f449f150145b","observation_id":"d75df361-0512-4642-8aff-63949cefc947","resolution":{"observed_at":"2026-08-16T04:52:54.834152Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"paper":{"arxiv_id":"2505.00225","last_updated":"2025-05-01T00:25:43Z","latest_version":1,"primary_category":"cs.LG","snapshot_observed_at":"2026-08-16T04:45:27.279088Z","submitted_at":"2025-05-01T00:25:43Z","title":"Predicting Estimated Times of Restoration for Electrical Outages Using Longitudinal Tabular Transformers"},"reference_resolution":{"displayed":16,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":13,"verified_exact":0,"verified_fuzzy":3},"total_outbound_references":16},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"thesis":"As of 22 August 2026, this Paper Citation Record lists 16 of 16 outbound references and 0 inbound Pith citation observations for arXiv:2505.00225."}