{"as_of":"2026-08-18T08:52:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:9df714f4fa4d9c84a7e9078c811a5154b6d93f2d43bc684d5362db33291d15f6","coverage":[{"denominator":59,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":59,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-07T05:40:56.342653Z","state":"measured"},{"denominator":59,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":59,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-18T06:34:40.430872+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2506.07602/citation-record","integrity":"/paper/2506.07602/integrity","json":"/paper/2506.07602/citation-record.json","paper":"/paper/2506.07602"},"outbound":[{"citation":{"cited_paper":{"arxiv_id":"2407.06934","last_updated":"2024-07-09T15:10:20Z","snapshot_observed_at":"2026-08-17T00:38:43.270566Z","submitted_at":"2024-07-09T15:10:20Z","title":"Quantitative stability of the total $Q$-curvature near minimizing metrics","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2407.06934","snapshot_observed_at":"2026-08-07T05:40:56.176564Z","title":null,"venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.176564Z"},"links":{"cited_paper":"/paper/2407.06934","citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:1123751e84fb322844c89a9c18a15a26461d45ea01294f0976d3d7c50f401168","observation_id":"6a7570c6-c366-46a8-8d3f-83176645b196","resolution":{"observed_at":"2026-08-07T05:40:56.176564Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:57.072144Z","title":"Aryan,Stability of Hardy Littlewood Sobolev inequality under bubbling, Calc","venue":null,"work_id":"50d55283-70f2-4992-96b2-c98abafd334f","year":2023},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.181036Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:4fa13728b7eca1778c4ce088c9d814b8d13aff1ad8a014d0250fb23abe70ed9e","observation_id":"3760891d-94c3-4561-ac35-0651c0f10f72","resolution":{"observed_at":"2026-08-07T05:40:57.075012Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:57.063895Z","title":"Aubin,Probl´ emes isop´ erim´ etriques et espaces de Sobolev, J","venue":null,"work_id":"22fd2472-f735-46bb-946c-77ea11c81d68","year":1976},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.184111Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:241c81140e83eb379ecd0301f4cd46e426d1c77641f4d501a7d6e96fefb1f3a4","observation_id":"71fe0548-706b-4abc-afa2-6c26697d58f9","resolution":{"observed_at":"2026-08-07T05:40:57.066812Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:57.055342Z","title":"Bahri and J","venue":null,"work_id":"d8c68607-b08d-4aff-85bf-94a096e5d7a6","year":1988},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.187347Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:b328c3767c68a97f26f61cc711914c293b956edf63f9fde8997b81f3ea1ccc0c","observation_id":"a8885c8b-3081-4c3f-904f-257ad8dddea3","resolution":{"observed_at":"2026-08-07T05:40:57.057991Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:57.047270Z","title":"Bhakta, D","venue":null,"work_id":"529e1af7-32c0-4e3c-9dd4-2b6b8903440d","year":2025},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.190483Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:35a74963a5854e039ef184e45d02a68a66b9c2566c1cd3f2e347b232b2c175e7","observation_id":"8c33e4dc-0248-4c66-9f32-5c179c2f6246","resolution":{"observed_at":"2026-08-07T05:40:57.049893Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2211.14618","last_updated":"2023-04-21T14:29:54Z","snapshot_observed_at":"2026-08-18T01:51:30.445131Z","submitted_at":"2022-11-26T17:13:11Z","title":"Sharp quantitative stability of Struwe's decomposition of the Poincar\\'e-Sobolev inequalities on the hyperbolic space: Part I","version":2},"cited_work":{"arxiv_id":"2211.14618","doi":null,"metadata_source":"pith","pith_arxiv_id":"2211.14618","snapshot_observed_at":"2026-08-07T05:40:56.549424Z","title":"Sharp quantitative stability of Struwe's decomposition of the Poincar\\'e-Sobolev inequalities on the hyperbolic space: Part I","venue":"math.AP","work_id":"0acfb2f8-6924-4ba9-808e-5427c4808d1b","year":2022},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.193475Z"},"links":{"cited_paper":"/paper/2211.14618","citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:3dae092eac1390265326991280191e886af394ee56955c6df02a67b14d3c4f84","observation_id":"2dd4858e-9a4b-44a7-84e9-038032ae1c33","resolution":{"observed_at":"2026-08-07T05:40:56.552662Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:57.039072Z","title":"Bianchi and H","venue":null,"work_id":"6c2c116b-eb1e-4b55-802f-4d4ebe04de5b","year":1991},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.196673Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:0813cf8127c65ab0d6230e7f7d5bdfa67c1032a0a51794301ec343b2cd2a8e0d","observation_id":"ce69cb09-51fb-4a50-882d-8f10f04c2123","resolution":{"observed_at":"2026-08-07T05:40:57.042025Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2503.09801","last_updated":"2025-03-12T20:10:38Z","snapshot_observed_at":"2026-08-16T18:20:34.919704Z","submitted_at":"2025-03-12T20:10:38Z","title":"Quantitative Stability for Yamabe minimizers on manifolds with boundary","version":1},"cited_work":{"arxiv_id":"2503.09801","doi":null,"metadata_source":"pith","pith_arxiv_id":"2503.09801","snapshot_observed_at":"2026-08-07T05:40:56.537363Z","title":"Quantitative Stability for Yamabe minimizers on manifolds with boundary","venue":"math.DG","work_id":"754bb083-0ca9-44c1-835f-57518e10607b","year":2025},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.199568Z"},"links":{"cited_paper":"/paper/2503.09801","citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:e11e28e6e1dbc0c292151c4035622853a5485140df3c043179ee4240a838acf9","observation_id":"35bd8a66-b378-4e26-8758-3b53fc9d5f2e","resolution":{"observed_at":"2026-08-07T05:40:56.540499Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:57.030673Z","title":"Brezis and J.-M","venue":null,"work_id":"19b1962d-e88e-406a-8a09-f9a4d3202e19","year":1985},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.202707Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:0d536ac18f2048afc4ccddc8e324ed66a5bfbf0771161c4a255636644c550413","observation_id":"ac15d83c-c766-4001-a08f-21e31e7a971e","resolution":{"observed_at":"2026-08-07T05:40:57.033405Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:57.021754Z","title":"Brezis and E","venue":null,"work_id":"47a3c703-6670-4f92-b540-5841e598494a","year":1985},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.206075Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:0bf26a1eeefdbfacfc3f6beb631584fa3bb76534a5be1a1a4a033346acdfa376","observation_id":"24ec6690-1612-4efb-88cb-bafc600df3d6","resolution":{"observed_at":"2026-08-07T05:40:57.025187Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:57.013391Z","title":"Brezis and L","venue":null,"work_id":"f7473ff1-7975-4741-939e-7ba1e24d767d","year":1983},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.208695Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:2eeb88e0cadac6e867187d0e630f09928e8f0ac947e909ca0c33323e989cbe9c","observation_id":"c1ff1f3f-f8e1-46b1-ba69-1386abb1fda3","resolution":{"observed_at":"2026-08-07T05:40:57.016439Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:57.004116Z","title":null,"venue":null,"work_id":"ba786bf2-2df8-4e3f-a010-8be88f57035d","year":2021},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.211910Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:48282c8d7a705395ab73d24a8b67bd1318cd5914138dac2fe59609f122fe2c33","observation_id":"73013e2b-f172-403d-8d49-4093d4a248bf","resolution":{"observed_at":"2026-08-07T05:40:57.007674Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.995495Z","title":"Carlen and A","venue":null,"work_id":"5150530a-580b-4d2b-bb6d-7f9d9786a63e","year":2013},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.214682Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:15780ff58f017e48f626f59d980109bfe3ea362d5b709f0e1fb6f722405854f9","observation_id":"2895cf28-2b03-4249-93d4-a10ee870a8a7","resolution":{"observed_at":"2026-08-07T05:40:56.998331Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2404.13961","last_updated":"2024-05-13T10:05:34Z","snapshot_observed_at":"2026-08-17T00:38:42.083869Z","submitted_at":"2024-04-22T08:08:07Z","title":"Sharp quantitative stability of the Yamabe problem","version":2},"cited_work":{"arxiv_id":"2404.13961","doi":null,"metadata_source":"pith","pith_arxiv_id":"2404.13961","snapshot_observed_at":"2026-08-07T05:40:56.524620Z","title":"Sharp quantitative stability of the Yamabe problem","venue":"math.AP","work_id":"b3ba806c-e4a7-4744-b98f-07d5beff7a1a","year":2024},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.217361Z"},"links":{"cited_paper":"/paper/2404.13961","citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:1f04d82ed054724930fb12c41fd710e9dacb71319b4075b7acb06f9c85e91a8e","observation_id":"60557ca5-206b-4137-80c9-a51c0db93ced","resolution":{"observed_at":"2026-08-07T05:40:56.527908Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.986794Z","title":null,"venue":null,"work_id":"ea25de3f-b3fa-443f-9e12-07e4a46ab350","year":null},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.220575Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:584b9757c2c2a021e34158851264262156298b53d9ab843a3fcc9f488e18493a","observation_id":"732f11fe-c92a-4383-a43c-621726ce4f6a","resolution":{"observed_at":"2026-08-07T05:40:56.989562Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.978031Z","title":null,"venue":null,"work_id":"ff7a9bb9-72e2-460a-93c7-6a764b4a41fd","year":null},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.223324Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:b2ee5a5fc39072b0a8d316a913c6b2e6c02f09df4aade7754272e884b6c36aa6","observation_id":"240ce186-114a-43f5-a04e-65e3a20f6c9b","resolution":{"observed_at":"2026-08-07T05:40:56.981032Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.226410Z","title":null,"venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.226410Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:ac0c6fb2d85286998c28eac7e712ed97d8992243cc9598340a5a45510cc9f57f","observation_id":"a1f3235a-3497-43d5-8236-934bebef7292","resolution":{"observed_at":"2026-08-07T05:40:56.226410Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.970004Z","title":"Cianchi, N","venue":null,"work_id":"35449afa-2fae-4ed9-a5ee-d88ab7224361","year":2009},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.229232Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:402338eb3b969cc8ff242470320091a89561e65f4886572fcf4d59d53938d4ac","observation_id":"e62f94c7-357e-422e-b1ce-b68652a733bc","resolution":{"observed_at":"2026-08-07T05:40:56.972786Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.961518Z","title":"Ciraolo, A","venue":null,"work_id":"d8f3e515-c8be-48a2-b0bf-3cba449bbf70","year":2018},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.232310Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:6c64b082d5f01970cf73a569968b23e1f3d368d3063cb30b7a45e67fc4c11bbd","observation_id":"b6c8801e-baa1-410a-9e49-39e9c5bf878d","resolution":{"observed_at":"2026-08-07T05:40:56.964189Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2503.01384","last_updated":"2025-03-03T10:27:31Z","snapshot_observed_at":"2026-08-16T12:53:39.366271Z","submitted_at":"2025-03-03T10:27:31Z","title":"On the stability of the critical $p$-Laplace equation","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2503.01384","snapshot_observed_at":"2026-08-07T05:40:56.235827Z","title":"Ciraolo and M","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.235827Z"},"links":{"cited_paper":"/paper/2503.01384","citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:057643ac0c3d50bf7a168b9c5e3005d7242160514c92cf383d6717eb968ca6f8","observation_id":"8d188b90-b258-41ef-a575-80e0c0552a2c","resolution":{"observed_at":"2026-08-07T05:40:56.235827Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.953351Z","title":null,"venue":null,"work_id":"260f86f9-2c15-49b5-bb30-a3faf1ecb907","year":2025},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.239056Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:b59f002de47101896093f920dbe1941d5c0178a2ab7b0a1a4578fd907bc84265","observation_id":"2c35e0ae-3fd4-42d2-99a4-56c1fe46f946","resolution":{"observed_at":"2026-08-07T05:40:56.956156Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.944622Z","title":"de Nitti and T","venue":null,"work_id":"1ce461b7-ba73-48aa-982b-0ef5a266d007","year":2023},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.241759Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:019619780f0fd01e00c2f756b41d400292c2e671126bd27c8b90287a33ff0220","observation_id":"2e9f15c0-bb70-4b84-b29b-c4f2c4042d5e","resolution":{"observed_at":"2026-08-07T05:40:56.947727Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.936385Z","title":"del Pino, J","venue":null,"work_id":"dcfaec58-5592-4f97-a18d-8d7a5b9ef274","year":2004},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.244592Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:80debc328c9f4a12684ec2a0ead90ca8d5c83b86f00ff087bd0af56708993fcb","observation_id":"1da04454-de18-4827-a8d2-bfe7434ad0f7","resolution":{"observed_at":"2026-08-07T05:40:56.939163Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.928348Z","title":"Dolbeault and M","venue":null,"work_id":"8ed55b96-bd77-4f07-8887-6537676e5b58","year":2021},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.247448Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:a71eb865e63906fa2f877a989a4d1cde5f235e2535cdebc6a39d3c190e7b8d30","observation_id":"379825dc-24d3-4721-9b74-4fd86fdeb52c","resolution":{"observed_at":"2026-08-07T05:40:56.931046Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.919891Z","title":"Dolbeault, M","venue":null,"work_id":"c4515cd6-eaf8-4fb1-8522-046b04847548","year":2025},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.250223Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:64951b38b27b09cc28c72d65c30979b4de331b6bc8b7247fc53304c6fae634b1","observation_id":"7b790235-92d5-4ace-ab39-b38f4d5a1c41","resolution":{"observed_at":"2026-08-07T05:40:56.922762Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.911102Z","title":"Druet,Elliptic equations with critical Sobolev exponents in dimension 3, Ann","venue":null,"work_id":"1c77eef9-bf74-413d-8096-d0c1756a1dd6","year":2002},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.252855Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:efe2ee7969ba829ef210b9213a79e360a5f5b3f8dd1530dbb1f4308614011c56","observation_id":"458d1122-a3b3-47ea-ae33-02bafb74dbe3","resolution":{"observed_at":"2026-08-07T05:40:56.914145Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.902861Z","title":"Differential Geom.63(2003), 399– 473","venue":null,"work_id":"48202251-b0a7-4622-a801-adf9f78dbc35","year":2003},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.255534Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:a3ac1ab5028ebc3907c20d20cc2b16937159dd98d149cd517708d4f792d82f5e","observation_id":"f5fbd05e-415e-4918-8390-1dd748d4b652","resolution":{"observed_at":"2026-08-07T05:40:56.905647Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.894385Z","title":"Druet and P","venue":null,"work_id":"6d25b91a-1412-4bb9-a8a6-1b527fe144e7","year":2010},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.258432Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:bb05e8a1e38be6137f7d66a4342a5e54af28895b0d2672d3e50ed4d6dc6fecb0","observation_id":"78132029-338f-43a3-8948-89cd17501203","resolution":{"observed_at":"2026-08-07T05:40:56.897110Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.886262Z","title":"Engelstein, R","venue":null,"work_id":"2110bbe0-ee4e-4c6a-baae-b4a19964d7d2","year":2022},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.261078Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:198ee7d144cd0d2ff8f9ae09d3144104d9a9f82d09c1396a5ae2df3363b002c4","observation_id":"a60cc48e-1c56-41cf-bb3f-7df6ba6dabaf","resolution":{"observed_at":"2026-08-07T05:40:56.888960Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.877664Z","title":"Figalli and F","venue":null,"work_id":"7992a07a-b237-4254-a19a-e9a0df7bf9b4","year":2020},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.263702Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:ed7b26c210c3a843a8275faab1775ed8ca367f3f22f047d70d8248c967471eb3","observation_id":"8d7ddbc6-97a5-48bd-a380-9bd48dbb0d04","resolution":{"observed_at":"2026-08-07T05:40:56.880769Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.869303Z","title":"Figalli, F","venue":null,"work_id":"68ee0085-7594-496e-b2e2-dc170b817954","year":2010},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.266431Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:0ab15553fb8e8d7c036cb9ae29c427baef5da31f31d10fe3fa81c14241bc4894","observation_id":"3bc34d0a-0f56-4798-9bf8-8a60bac0c864","resolution":{"observed_at":"2026-08-07T05:40:56.872186Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.860897Z","title":"Figalli and R","venue":null,"work_id":"0ed4564d-09f9-4dd7-8da7-0eef4cf29cf7","year":2018},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.269003Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:0f21df4ada115a1492fbba82a54eb70b706b5e4e75bff82a4104d802abd3fe57","observation_id":"f511ca49-b6ef-417d-bc9f-6a4f1aa197b7","resolution":{"observed_at":"2026-08-07T05:40:56.863735Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.852265Z","title":"Figalli and Y","venue":null,"work_id":"326bff47-d662-48c7-b96e-7c93786952cc","year":2022},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.272056Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:66fec4a31cb1618ae70d6a606194ea244aa8bce60ab694509359e139f01ceb68","observation_id":"e5ac1f26-edfd-4be7-93b8-c8e217499acf","resolution":{"observed_at":"2026-08-07T05:40:56.855171Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.843710Z","title":null,"venue":null,"work_id":"db2dd2dd-1dde-43ed-a90b-c425365f37da","year":2022},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.274728Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:b8c7d29c7b7d6ea6057e201d55aea5ecc0edf1bd7bde54374d852e30bd866b9d","observation_id":"3c5568af-4dda-499f-a9b1-20d7dd26258c","resolution":{"observed_at":"2026-08-07T05:40:56.846598Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.835191Z","title":"Han,Asymptotic approach to singular solutions for nonlinear elliptic equations involving critical Sobolev exponent, Ann","venue":null,"work_id":"af81c7f5-5c6d-4013-a7d3-e8eea903127a","year":1991},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.277320Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:ae15138213b1fb8db0c352cdf7889620ada2adc6ec255d822be93df91b503374","observation_id":"4b98f07e-5242-4abd-bd19-98bbc0455a95","resolution":{"observed_at":"2026-08-07T05:40:56.838247Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.826502Z","title":"Jin and J","venue":null,"work_id":"65f71820-7607-4c6b-a470-36e0e8d58149","year":2023},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.280193Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:1f4a6370548ac6916e2033f6c5d3e3f54fa4154d6fcda4a18186bcddbce763bc","observation_id":"597385ec-6860-4d5f-88af-a4102d364db0","resolution":{"observed_at":"2026-08-07T05:40:56.829357Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.817251Z","title":"K¨ onig,On the sharp constant in the Bianchi-Egnell stability inequality, Bull","venue":null,"work_id":"79e26c57-5258-410f-b785-0d06b5df69dc","year":2023},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.282768Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:10a32da91d8c695f37a4d4e346d747fc23c554efd27e2114b3de31b64962d1ca","observation_id":"fe792256-aba7-4c22-8298-6f71a59786a2","resolution":{"observed_at":"2026-08-07T05:40:56.820258Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.808548Z","title":null,"venue":null,"work_id":"632681c3-ab89-4248-9621-186c6c499daa","year":null},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.285310Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:6aea2fb55486bed2448d85dde08f2fd2ece4d49e13a45fa0580446c38a74e46b","observation_id":"e420d65a-3927-4f91-872f-048af07a0fd6","resolution":{"observed_at":"2026-08-07T05:40:56.811724Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.800331Z","title":null,"venue":null,"work_id":"b19fb427-03af-41c5-88bb-8edf238a1655","year":2024},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.287971Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:70616bd1c7eba28dd3320e53d1472e401bfcb67467215dc341d4cae54fd5035f","observation_id":"89479ebf-391d-4f31-9bd8-d738707dddf5","resolution":{"observed_at":"2026-08-07T05:40:56.803193Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.792017Z","title":"K¨ onig and P","venue":null,"work_id":"33ad8dd2-9221-4ef5-8241-a0242262fb55","year":null},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.290684Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:c95c46607d176a39433ecd2e8c3686fd2b0eb6a027d65f76ad582befe78f99cd","observation_id":"a8dd39f6-3755-4b35-bde7-1028251fa824","resolution":{"observed_at":"2026-08-07T05:40:56.794984Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.783739Z","title":null,"venue":null,"work_id":"78ef8acc-ff0d-4ed3-93d5-9c9c022fb493","year":2024},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.293315Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:572066d808ab95490e8cf969c3d3f2d936752cc42d65f851b72ba1b5073342ad","observation_id":"c230d0d6-628d-4357-b8dd-d6cfc21a8f2e","resolution":{"observed_at":"2026-08-07T05:40:56.786452Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2411.04783","last_updated":"2024-11-07T15:22:43Z","snapshot_observed_at":"2026-08-17T16:42:38.432757Z","submitted_at":"2024-11-07T15:22:43Z","title":"Sharp extinction rates for positive solutions of fast diffusion equations","version":1},"cited_work":{"arxiv_id":"2411.04783","doi":null,"metadata_source":"pith","pith_arxiv_id":"2411.04783","snapshot_observed_at":"2026-08-07T05:40:56.432540Z","title":"Sharp extinction rates for positive solutions of fast diffusion equations","venue":"math.AP","work_id":"bdb11279-7df7-4343-b2a0-9984541d7206","year":2024},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.295968Z"},"links":{"cited_paper":"/paper/2411.04783","citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:53f59ccc9ead5b32a1ec71bc9c40c3ee8423990d4c1a701a12e7666318bb5b34","observation_id":"b313181d-dcad-48b6-afd3-3d989f0726f4","resolution":{"observed_at":"2026-08-07T05:40:56.436036Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2503.09250","last_updated":"2025-03-12T10:46:06Z","snapshot_observed_at":"2026-08-16T12:50:47.855552Z","submitted_at":"2025-03-12T10:46:06Z","title":"Construction of bubbling solutions of the Brezis-Nirenberg problem in general bounded domains (I): the dimensions 4 and 5","version":1},"cited_work":{"arxiv_id":"2503.09250","doi":null,"metadata_source":"pith","pith_arxiv_id":"2503.09250","snapshot_observed_at":"2026-08-07T05:40:56.419425Z","title":"Construction of bubbling solutions of the Brezis-Nirenberg problem in general bounded domains (I): the dimensions 4 and 5","venue":"math.AP","work_id":"7b897d5e-22ad-4316-b0a5-765ab5cc1073","year":2025},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":43,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.299011Z"},"links":{"cited_paper":"/paper/2503.09250","citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:f33a8e2e35714289a6d90861f9ca77e6620531ec72669ddda20baec0298498cc","observation_id":"5c6ffee7-950c-42d7-b3ac-66764042e328","resolution":{"observed_at":"2026-08-07T05:40:56.422875Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2503.02340","last_updated":"2025-03-11T20:34:48Z","snapshot_observed_at":"2026-08-16T12:53:19.256621Z","submitted_at":"2025-03-04T07:02:49Z","title":"Sharp stability for critical points of the Sobolev inequality in the absence of bubbling","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2503.02340","snapshot_observed_at":"2026-08-07T05:40:56.302037Z","title":"Liu and Y","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":44,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.302037Z"},"links":{"cited_paper":"/paper/2503.02340","citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:6540fa6d7cd9928a36b81bcab84a14c0126529dd7b5782cc007a172d4697c3d6","observation_id":"421e35c5-1f5f-4ffb-aa2c-9e55a520d86a","resolution":{"observed_at":"2026-08-07T05:40:56.302037Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.775230Z","title":"Musso and A","venue":null,"work_id":"4307a47e-5dd9-42ad-bf0e-bf8f5b7fbd76","year":2002},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":45,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.304798Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:a47682a370f5cdcd0c92fa374a07ef546bdb9da33f732d433f53c563577d4f76","observation_id":"a1d27026-8a6d-4a52-89fb-6ed2fee2d329","resolution":{"observed_at":"2026-08-07T05:40:56.777957Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.767259Z","title":"Musso and D","venue":null,"work_id":"1e99d0dc-71a5-440a-afad-ec91f80f2d55","year":2018},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":46,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.307446Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:4efcf0c42d066f2f1bf9a592237d5876e904f1fc9feeb44f3de2c4c7781f67cb","observation_id":"c1ef14d7-825b-49df-944c-2b349704a540","resolution":{"observed_at":"2026-08-07T05:40:56.769929Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.758602Z","title":"Nobili and D","venue":null,"work_id":"bba0ff45-a938-4c3c-9969-9786194ae098","year":2025},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":47,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.310025Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:6a39bdeb13c987ccb772a4d0bdb969473d43a0ccdbfbefd2379f5c9e36524a47","observation_id":"b6a13309-50b5-4b1a-a280-0000a8be1354","resolution":{"observed_at":"2026-08-07T05:40:56.761349Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.749989Z","title":"Nobili and I","venue":null,"work_id":"6456d174-226e-4400-857e-a8825c003f9b","year":2024},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":48,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.312772Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:1534d3491dd056f2c33e631400df65de00b38a103ea9b4fb1304151daa500b80","observation_id":"534ee9a1-70fa-41e7-994e-bd8b21eb8931","resolution":{"observed_at":"2026-08-07T05:40:56.752826Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2505.24387","last_updated":"2025-05-30T09:18:04Z","snapshot_observed_at":"2026-08-10T03:33:54.634524Z","submitted_at":"2025-05-30T09:18:04Z","title":"Multi-bubble solutions for the Brezis-Nirenberg problem in four dimensions","version":1},"cited_work":{"arxiv_id":"2505.24387","doi":null,"metadata_source":"pith","pith_arxiv_id":"2505.24387","snapshot_observed_at":"2026-08-07T05:40:56.397213Z","title":"Multi-bubble solutions for the Brezis-Nirenberg problem in four dimensions","venue":"math.AP","work_id":"2bb4a22d-e8a3-4bf8-a2c2-4d5ef58e190f","year":2025},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.315414Z"},"links":{"cited_paper":"/paper/2505.24387","citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:84fea68f404ede6fb4b67f888eec200115b4ab2f0f08ed69dcec5d7fe9a1c433","observation_id":"6d913f85-900c-4baf-bb88-427ee4099e9c","resolution":{"observed_at":"2026-08-07T05:40:56.400871Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.741133Z","title":"Pohozaev,On the eigenfunctions of the equation∆u−λf(u) = 0, Dokl","venue":null,"work_id":"8c753a66-721f-4ad3-9bc3-4ecda3af2261","year":1965},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":50,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.318301Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:6c56089fd15500ddd0200e841a42ebe41377969bdc8a00c779b6bcae53f8ae69","observation_id":"0df06dcc-1dfb-4ea3-909a-f14b9116cec1","resolution":{"observed_at":"2026-08-07T05:40:56.744214Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.732150Z","title":"Rey,The role of the Green ’s function in a nonlinear elliptic equation involving the critical Sobolev exponent, J","venue":null,"work_id":"8503f3ff-8b48-4978-9a24-3b81978bfacb","year":1990},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":51,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.320827Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:f9a17706e0b70527ef69256208333202d59abf3cd1917ab3da476b8e125bcab3","observation_id":"9d4ca45d-cf43-4013-9c14-a8d33884a5b6","resolution":{"observed_at":"2026-08-07T05:40:56.735280Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.721731Z","title":"Struwe,A global compactness result for elliptic boundary value problems involving limiting nonlinearities, Math","venue":null,"work_id":"66e521ec-c5c8-4994-9428-ad1cdb692639","year":1984},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":52,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.323889Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:eff0b0be9e60e6a2e866add85cb400bdbecba085e5af0c948398d5de4a3e7641","observation_id":"3e0192a1-beda-4ac4-a45f-4630e82899d8","resolution":{"observed_at":"2026-08-07T05:40:56.725651Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2503.06904","last_updated":"2025-03-10T04:15:26Z","snapshot_observed_at":"2026-08-16T12:51:40.674374Z","submitted_at":"2025-03-10T04:15:26Z","title":"On Brezis' First Open Problem: A Complete Solution","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2503.06904","snapshot_observed_at":"2026-08-07T05:40:56.326585Z","title":null,"venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":53,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.326585Z"},"links":{"cited_paper":"/paper/2503.06904","citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:211fda98ce6266413ee327027e2e84dafaa5da8c98fa633dabd72130fef0ff13","observation_id":"13908506-9408-4df5-88c1-14315e42fea8","resolution":{"observed_at":"2026-08-07T05:40:56.326585Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.605100Z","title":"Talenti,Best constant in Sobolev inequality, Ann","venue":null,"work_id":"23461bb5-1c33-4669-a374-311342a33a00","year":1976},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":54,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.329411Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:6b2cf5925a28a70a7bc24d29e4dbd586c4a2043d30d347e04751cb8244477611","observation_id":"1b57ef13-0565-4773-955f-62968a73b3c4","resolution":{"observed_at":"2026-08-07T05:40:56.608129Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.596270Z","title":"Wei and Y","venue":null,"work_id":"ccd23038-9773-4fcb-becd-978670ef1aa1","year":2022},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":55,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.331997Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:88611be1f494c6a5a41cb1bc71ff89ebdac913561d1e0e76f484e261a545a8c9","observation_id":"1d61e8f4-931e-4a65-b650-d806ea9620a3","resolution":{"observed_at":"2026-08-07T05:40:56.599127Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.585121Z","title":"The Legacy of David R","venue":null,"work_id":"f1cf92ef-7c64-49b5-b4e4-1afa7dc252ab","year":2023},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":56,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.334668Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:3bb6af0da11fad61b28d14c6a3f7a285ed954e5486b403c1c99fc5bd661f98a4","observation_id":"e8bdd96e-4a26-453f-aff5-01430193e703","resolution":{"observed_at":"2026-08-07T05:40:56.589648Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.576627Z","title":"Z.,308 (2024), 1–26","venue":null,"work_id":"d68052a2-65d0-45d5-81cf-5b845b7d0562","year":2024},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":57,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.337239Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:16980b8cb543ae7287f4e8d3ea3b953f2743e5c3897d195770d6badf220ed252","observation_id":"a380cd56-8b1e-41f2-833d-a1d8ed059e64","resolution":{"observed_at":"2026-08-07T05:40:56.579437Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2407.19366","last_updated":"2024-07-28T02:24:44Z","snapshot_observed_at":"2026-08-16T13:30:31.594634Z","submitted_at":"2024-07-28T02:24:44Z","title":"Stability of the Caffarelli-Kohn-Nirenberg inequality along Felli-Schneider curve: critical points at infinity","version":1},"cited_work":{"arxiv_id":"2407.19366","doi":null,"metadata_source":"pith","pith_arxiv_id":"2407.19366","snapshot_observed_at":"2026-08-07T05:40:56.371778Z","title":"Stability of the Caffarelli-Kohn-Nirenberg inequality along Felli-Schneider curve: critical points at infinity","venue":"math.AP","work_id":"217cafbb-9369-43a0-b3ea-e680b44382f0","year":2024},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":58,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.339863Z"},"links":{"cited_paper":"/paper/2407.19366","citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:b94660a4dcfa494d332dbf3f5a5d2ccbef170cf55ab8de0ca19e595142310701","observation_id":"20098f62-3fd6-4acb-bdab-4e7d8f841c60","resolution":{"observed_at":"2026-08-07T05:40:56.377199Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-07T05:40:56.567764Z","title":"Wei and S","venue":null,"work_id":"fe3767f0-e96f-427c-9e8a-005afb0d3301","year":2010},"citing_paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem","version":1},"reference_index":59,"source":"pdf_text","source_observed_at":"2026-08-07T05:40:56.342653Z"},"links":{"citing_paper":"/paper/2506.07602"},"observation_digest":"sha256:ad9aa4b468448859cf100c4414b9c34cfb35a8795aa18003e8fb360faca3ff9b","observation_id":"f59c7441-4263-409e-95a0-8a4ed70b2166","resolution":{"observed_at":"2026-08-07T05:40:56.570745Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-18T06:34:40.430872+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2506.07602","last_updated":"2025-06-09T10:01:59Z","latest_version":1,"primary_category":"math.AP","snapshot_observed_at":"2026-08-10T01:03:00.644681Z","submitted_at":"2025-06-09T10:01:59Z","title":"Sharp quantitative stability estimates for the Brezis-Nirenberg problem"},"reference_resolution":{"displayed":59,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":13,"verified_exact":7,"verified_fuzzy":39},"total_outbound_references":59},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-18T06:34:40.430872+00:00","source":"crossref"},{"observed_at":"2026-08-18T06:34:34.496301+00:00","source":"retraction_watch"}],"thesis":"As of 18 August 2026, this Paper Citation Record lists 59 of 59 outbound references and 0 inbound Pith citation observations for arXiv:2506.07602."}