{"as_of":"2026-08-22T22:20:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:d15fc21f5fe20190822b3f8ba0d1ad99aa1a91bf510aaae509530278b6344528","coverage":[{"denominator":31,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":31,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-06T21:06:40.812734Z","state":"measured"},{"denominator":31,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":31,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-22T06:32:14.747728+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2507.01225/citation-record","integrity":"/paper/2507.01225/integrity","json":"/paper/2507.01225/citation-record.json","paper":"/paper/2507.01225"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:46.397274Z","title":"In: Proceedings of the 53rd Annual ACM SIGACT Symposium on Theory of Computing, pp 1070–1080","venue":null,"work_id":"088ff9d9-dc2d-4aa2-a584-f080be1369db","year":2021},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:38.345653Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:f49d9fe6ea14a35226539c0b8808547ffb0b7ccc7a5019c4b76cf5810724f967","observation_id":"71c5e107-2766-4e59-a374-8d94874cebcd","resolution":{"observed_at":"2026-08-06T21:06:46.404365Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:46.382113Z","title":"IEEE Transactions on Automation Science and Engineering 33","venue":null,"work_id":"ab0d50ff-ed7b-4b90-97c2-36fce6e170d4","year":2022},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:38.393620Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:43bd93f482bdcfd3aaa926d278051026faa96619e81ab6a1bd99eef4b0fa6100","observation_id":"ccbad95d-fd6f-45f9-a1b8-58e74f66aab2","resolution":{"observed_at":"2026-08-06T21:06:46.387373Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:46.364383Z","title":"PhD thesis","venue":null,"work_id":"9a3a4f83-cfda-44b1-9e01-1eeb41cfbffa","year":2005},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:38.451313Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:044f2ffceccad41fd094d645ab417fb267eac439db3f41e738627809e4bad729","observation_id":"412ad144-de40-442a-a599-5f37790877ea","resolution":{"observed_at":"2026-08-06T21:06:46.369463Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:46.346982Z","title":"Journal of Scheduling 12(3):315–344","venue":null,"work_id":"5d3f43a0-dc8d-4905-bf07-8aed419bbd4d","year":2009},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:38.514020Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:3feec909d9aff8920505d584f3994672b7e2d35835a338eb1890b30a648ca2cd","observation_id":"9bbdabb6-67e6-46ec-968d-307a55bc5f2b","resolution":{"observed_at":"2026-08-06T21:06:46.351400Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:46.330504Z","title":"In: 2016 IEEE 9th International Conference on Cloud Computing (CLOUD), IEEE, pp 577–584","venue":null,"work_id":"44f5e24f-41d6-4e17-87ea-02e34345e77c","year":2016},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:38.578350Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:b3c27b0f9fcb12974930d832314b4a72e5ce825860d26a00324b8105aa454bc3","observation_id":"b63d53f1-f580-48f4-b659-ce01d69e9f24","resolution":{"observed_at":"2026-08-06T21:06:46.336572Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:46.310380Z","title":"Management Science 66(8):3329–3339","venue":null,"work_id":"26f499e4-b7d2-4077-b006-f7fa1ea301d7","year":2020},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:38.653152Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:84b85afc227c1cad961499a7b0730a38c70d11223bbd49fb1b259bd9a437e43a","observation_id":"189759f1-b1dd-4048-bd8d-bcf614ebf1ef","resolution":{"observed_at":"2026-08-06T21:06:46.316878Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:46.287786Z","title":"Journal of Scheduling 18(3):263– 273","venue":null,"work_id":"e20d3826-2221-4de9-b177-dafaa48b19cb","year":2015},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:38.712730Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:0c07c1f9e44ca17d9ab1e8f8e326fb2d429c4c98ad7d90c178c2d88caa54f789","observation_id":"58efb992-f278-44c7-90a2-1e2b2dee266a","resolution":{"observed_at":"2026-08-06T21:06:46.295708Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:46.118765Z","title":"Available at SSRN 2873356","venue":null,"work_id":"42b8384b-4b81-43a4-8f36-e922fc402d93","year":2016},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:38.775668Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:b92b1d8b00af7b050f3963fc041ac7169eea0b297578666247bac092eaa87271","observation_id":"2a8e05ed-7dc5-4be0-a188-cde6c6929d1d","resolution":{"observed_at":"2026-08-06T21:06:46.243182Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:45.821762Z","title":"Or Spectrum 42(4):901–933","venue":null,"work_id":"ec580a49-5bfd-40bf-b63c-cd9cc149ad54","year":2020},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:38.840824Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:53a8d14cffa29894cff08d13ae7f17c0abd8f1c86d8e1640beb99d4f287a6d22","observation_id":"e54cc402-9144-4346-a595-e0f66df44c60","resolution":{"observed_at":"2026-08-06T21:06:45.982036Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:45.548013Z","title":"https://github.com/google/or-tools","venue":null,"work_id":"135ac6dd-6a7c-4d50-9ba8-69906f1a0db5","year":2022},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:38.905962Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:d351c559eac68b896dbaee93d046a80d70f76d79395d4bd69e05a2aee6a81e38","observation_id":"0bdf34f0-0f05-4cde-9c8a-05625290c0d5","resolution":{"observed_at":"2026-08-06T21:06:45.664800Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:45.312398Z","title":"In: Pro- ceedings of the International Conference on Automated Planning and Scheduling, pp 119–123","venue":null,"work_id":"c4b2f0f4-aa91-4b45-89ae-d36118c4a334","year":2022},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:38.971200Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:3c2d7ace59f00048ce739071a841be1e70790812605b8a0afc9d1b4a4784dde9","observation_id":"9c376a16-7822-4e01-90a9-71a2b0ae59e8","resolution":{"observed_at":"2026-08-06T21:06:45.381272Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:45.218966Z","title":"Journal of project management 3(2):55–88","venue":null,"work_id":"1dfbb86d-b501-4157-8f02-f5cb77c9e6e0","year":2018},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:39.037071Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:88c60417d5946fadf4d8e49982af7b3275e73f635a29fe1ce5a55193858b9517","observation_id":"cdbe523e-7d16-4728-bab9-e51c165e6faa","resolution":{"observed_at":"2026-08-06T21:06:45.294104Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:45.069478Z","title":"European Journal of operational research 297(1):1–14","venue":null,"work_id":"7a88f5bd-0345-4347-9223-dcb836177108","year":2022},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:39.100673Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:8af493861043d71e9f7af11add648ce57d9ccc5b67725df7112a107ef79d875f","observation_id":"9f176c02-898f-4315-9468-15f8a5c47af8","resolution":{"observed_at":"2026-08-06T21:06:45.147961Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:44.932105Z","title":"Journal of the Operational Research Society 56(4):406–413","venue":null,"work_id":"369cd4ec-cae5-42eb-8624-7048b74e9f7a","year":2005},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:39.161028Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:2c8abb17fcc6f730ab186f18db7853fcb1008980f3fccc55fd0420767ac3b0b7","observation_id":"c5a5f1e3-2548-4f98-9e54-c997d0d1b5a4","resolution":{"observed_at":"2026-08-06T21:06:45.007157Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:44.788402Z","title":"The Journal of Supercomputing 79(7):7484–7512","venue":null,"work_id":"d89b4ba6-9e37-4b60-851f-307bdd04d872","year":2023},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:39.226655Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:d65be12df63b3ff4cb5e3ad4df64cea526a09a120bb07e3176a06fae1ed36a23","observation_id":"52ecd731-9af9-4879-b2a0-927c145c8b30","resolution":{"observed_at":"2026-08-06T21:06:44.841647Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:44.610222Z","title":"IEEE Transactions on Cloud Computing 34 9(03):1180–1194","venue":null,"work_id":"236d6cac-7da4-49a3-94a5-96da6ae6be54","year":2021},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:39.293530Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:b9c01330c976de73e178adedca9da56327505cc8664adf49212dc6de86198456","observation_id":"c4495db6-4602-422b-9629-76b30cd36911","resolution":{"observed_at":"2026-08-06T21:06:44.697721Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:44.417803Z","title":"International journal of machine learning and cybernetics 7(4):613–621","venue":null,"work_id":"6bc52f3c-5d50-4d27-b11c-8e048533809b","year":2016},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:39.349424Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:0e10bede42b16a12b0f6dd0185e2119bc4e23a7db192e06b3c54353e2e1bb4a6","observation_id":"892cd6d7-e257-4e88-9552-847349eabf1e","resolution":{"observed_at":"2026-08-06T21:06:44.506633Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:44.241196Z","title":"In: Pro- ceedings of the seventeenth annual ACM symposium on Parallelism in algorithms and architectures, pp 66–75","venue":null,"work_id":"0afe6661-a1d7-4433-a761-0c28ea12e6ca","year":2005},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:39.496623Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:5178bbb23ce6caad656481b55ac88e712b11874bbc654ebf6a4f81e6c3a7a674","observation_id":"99f7a41f-06a5-4942-9a35-0e921d229962","resolution":{"observed_at":"2026-08-06T21:06:44.320685Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:44.053613Z","title":"Discrete applied mathematics 6(2):173–191","venue":null,"work_id":"9da91375-4453-4f53-81b4-1992d082709c","year":1983},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:39.607177Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:731378edf8cb54144207c9ca67eacc25306e06848fe4bd3659ac49d50aa6be22","observation_id":"f555e2d4-0f56-478e-83ad-f9551fcbb0c6","resolution":{"observed_at":"2026-08-06T21:06:44.138439Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:43.847491Z","title":"Springer","venue":null,"work_id":"bfbff8d3-0433-4e3c-98f8-76228ddce43e","year":2002},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:39.716573Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:f40a6dc9e49e1ae43e16deb698d1be325c068090d290745b38e2299d9bb77443","observation_id":"41be3242-20b2-47e4-9991-2837762c6b76","resolution":{"observed_at":"2026-08-06T21:06:43.949538Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:43.648601Z","title":"In: 2015 IEEE 27th International Conference on Tools with Artificial Intelligence (ICTAI), IEEE, pp 453–460","venue":null,"work_id":"39f8e3f5-f7b8-4599-8b62-7a3c54c6f246","year":2015},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:39.833748Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:d97f2a1b961b135662981d787ca5016c0af2f827f0d59227605e6ced83ad5c11","observation_id":"2b675dae-320e-4e2e-822c-78f48b80edeb","resolution":{"observed_at":"2026-08-06T21:06:43.733471Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:43.421175Z","title":"ARPN Journal of Engineering and Applied Sciences 8(1):26–32","venue":null,"work_id":"bba6458a-8305-4d66-96eb-f92d5128e1b6","year":2013},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:39.969547Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:262c72566a3eb51c5003c8d29550296192cea6176d1e34b4a1c387712d55b503","observation_id":"ab040c99-e3c6-4616-9cee-79a949a26264","resolution":{"observed_at":"2026-08-06T21:06:43.517007Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:43.239156Z","title":"Journal of Scheduling 21(3):349–365","venue":null,"work_id":"55f2cd61-173b-4546-a3dc-de8bdbf451f3","year":2018},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:39.980024Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:6bbb534a14d7cbd677729665aec25dd4a86c11a586f3109e33fbbb722a97ee27","observation_id":"e7d984e6-327f-4d4d-95cb-3b9d864199f5","resolution":{"observed_at":"2026-08-06T21:06:43.311356Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:42.974580Z","title":"Constraints 16(3):250–282","venue":null,"work_id":"22bcaf0a-7c80-4231-8594-cf6ae3c2bb1c","year":2011},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:40.044534Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:e9a8b0000068403b196bc05455abb1386d492d61fa14d227c14aef4b805e9db9","observation_id":"a8d654ba-c7a0-4eb0-9b5d-7b7ddce2a4ba","resolution":{"observed_at":"2026-08-06T21:06:43.134841Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:42.787230Z","title":"European Journal of Operational Research 181(1):86–101","venue":null,"work_id":"05cdec32-b5c4-4039-96e8-c2699dd7a167","year":2007},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:40.144733Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:4b579f16724857713c4dd46c06f716701335076e60585f5b629b867dd584b22a","observation_id":"7c2cf2b2-6657-4247-a0d6-1ddefcb91def","resolution":{"observed_at":"2026-08-06T21:06:42.919725Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:42.403127Z","title":"Journal of Artificial Intelligence Research 64:385–427","venue":null,"work_id":"e1d8318d-6bcf-48a8-871b-27bd60312aa2","year":2019},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:40.209860Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:7ddd41cf85f028c568ca10d365a10870ff955b2c0192b85f71110c376b6959e4","observation_id":"0c6ae664-42cb-485b-8b15-5a142e501989","resolution":{"observed_at":"2026-08-06T21:06:42.594109Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:42.081835Z","title":"Journal of Scheduling 21(2):251–267","venue":null,"work_id":"0d3ea39c-3540-4665-9c1a-66dd67c744d2","year":2018},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:40.332832Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:01681e52b99dcbce2059594d12e907476486c7fea7b9d0d876c1f314e1d7efed","observation_id":"04499d7a-e94f-43a4-ae6a-e4116898ce90","resolution":{"observed_at":"2026-08-06T21:06:42.219097Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:41.773686Z","title":"In: Proceedings of the AAAI Conference on 35 Artificial Intelligence","venue":null,"work_id":"bfabd4a9-25a1-4982-8698-f144e30b32c6","year":2016},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:40.470234Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:dad44c7b64b050e9dbbabc397dcdb3f43b631f7cdb4af28ecf4cf60961abad74","observation_id":"c1e1fe10-ce2a-4a2b-a475-b6abdb10121b","resolution":{"observed_at":"2026-08-06T21:06:41.919946Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:41.510823Z","title":"IEEE Transactions on Evolutionary Computation 18(5):742–763","venue":null,"work_id":"7a2ebde2-b33d-4d8a-9f70-0e155de9c507","year":2013},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:40.592023Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:755dbc5bb68da08e7cc47a1d26f0079ece3424241a2f6e62498f7fd90f44c28d","observation_id":"30768d69-510d-42dc-babd-ba858d3701d9","resolution":{"observed_at":"2026-08-06T21:06:41.628041Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:41.216031Z","title":"Journal of Systems and Software 184:111123","venue":null,"work_id":"c60d853b-8892-46da-9933-3f34d9a0e201","year":2022},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:40.715761Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:61efa24d17a3b6ce97f190e26f8c4a3760b4c780b997a1327424f32628fd5a4d","observation_id":"f261b129-fe42-4a80-b9af-03a00f17ae7c","resolution":{"observed_at":"2026-08-06T21:06:41.335366Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T21:06:40.967231Z","title":null,"venue":null,"work_id":"659f75e8-7712-44ea-a374-8848703b08b1","year":2021},"citing_paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration","version":2},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-06T21:06:40.812734Z"},"links":{"citing_paper":"/paper/2507.01225"},"observation_digest":"sha256:811fa1a3901969eefb79c5efe0c4f10bb79787954ef151b05467d8b5c0f1b79e","observation_id":"ee8572c5-2c7e-4c20-b73f-28656424288e","resolution":{"observed_at":"2026-08-06T21:06:41.062041Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-22T06:32:14.747728+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2507.01225","last_updated":"2025-07-21T18:56:31Z","latest_version":2,"primary_category":"cs.DC","snapshot_observed_at":"2026-08-22T04:09:27.398287Z","submitted_at":"2025-07-01T22:56:08Z","title":"Capacity Planning and Scheduling for Jobs with Uncertainty in Resource Usage and Duration"},"reference_resolution":{"displayed":31,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":1,"verified_exact":0,"verified_fuzzy":30},"total_outbound_references":31},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-22T06:32:14.747728+00:00","source":"crossref"},{"observed_at":"2026-08-22T06:32:06.552537+00:00","source":"retraction_watch"}],"thesis":"As of 22 August 2026, this Paper Citation Record lists 31 of 31 outbound references and 0 inbound Pith citation observations for arXiv:2507.01225."}