{"as_of":"2026-08-16T18:21:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:5851d21c158bb069af6eec84cfa7f1e0c6ddb435b299a3fc8c2c1ac1408ef911","coverage":[{"denominator":83,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":83,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-06T11:48:09.288805Z","state":"measured"},{"denominator":83,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":83,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-16T06:30:59.297886+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2507.22442/citation-record","integrity":"/paper/2507.22442/integrity","json":"/paper/2507.22442/citation-record.json","paper":"/paper/2507.22442"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:03.893078Z","title":null,"venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:03.893078Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:31399fe080b21314ea24110cf20514fc6cc4f24fc5c1618331ebec5f78e8312f","observation_id":"f94bfe13-09db-4cb5-9d54-eb750e0c8197","resolution":{"observed_at":"2026-08-06T11:48:03.893078Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:03.964564Z","title":null,"venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:03.964564Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:86fa62aaae7104914038724939b71d2e3c08435694bb72c05db7023c0894d324","observation_id":"c2931682-1ec5-4694-8a87-19ac96445b5d","resolution":{"observed_at":"2026-08-06T11:48:03.964564Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1109/mines.2011.143","metadata_source":"openalex","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T05:30:23.456663Z","title":null,"venue":null,"work_id":"bff5bbfd-f95b-449c-beb9-cc8c802871d1","year":2011},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:04.030377Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:7a56d52f5258ece95ca69b85ba062bfaca3168d30b5506c561bed68d20342686","observation_id":"38517688-2f35-48c5-b705-6bf0c8d259d0","resolution":{"observed_at":"2026-08-06T11:48:09.368266Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:04.095034Z","title":null,"venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:04.095034Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:f87eb4c63cb1479629b862fd30e460879c2c0ccb4740a26d223caacb670bc156","observation_id":"8049a0e7-0ec6-46db-b488-bad3e3c9c7e2","resolution":{"observed_at":"2026-08-06T11:48:04.095034Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:04.172650Z","title":null,"venue":null,"work_id":null,"year":2012},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:04.172650Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:cc6e8a8b85ff5ae00f0efa0eb1f53f4232d2282fdd3d657ed091bb56d1dc04f3","observation_id":"e88993b0-e1ec-40e7-a90c-135b540be118","resolution":{"observed_at":"2026-08-06T11:48:04.172650Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.286930Z","title":null,"venue":null,"work_id":"17573d58-e4fc-4826-8567-d0076d7d7138","year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:04.251149Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:9c174af2aa0e8a3284a61eb6216c8eef7f8fde0ec390701f3361df67fe1fcaad","observation_id":"56db90b0-e93c-4833-9233-3fa406957a93","resolution":{"observed_at":"2026-08-06T11:48:11.290529Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:04.321711Z","title":null,"venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:04.321711Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:d5e0217f2f9545c2a47b64abe1370e962b30148fd868e61f0e664fdc6d233624","observation_id":"f3596c9d-dc80-463b-8d78-c1ee8b8c9e56","resolution":{"observed_at":"2026-08-06T11:48:04.321711Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.275984Z","title":null,"venue":null,"work_id":"ac3c91bc-2d0c-4155-ac96-98fdfdb68de5","year":2011},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:04.378807Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:b47705b4466b1578ca21d231b4e468db29f57dfa2bfb57cc5c8ce294b2012d25","observation_id":"369b6ddc-9a88-47ab-acb4-8aad91c0baa9","resolution":{"observed_at":"2026-08-06T11:48:11.279780Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.265455Z","title":null,"venue":null,"work_id":"0f5207f3-1055-4ec9-a7ca-dcb2c5edf85e","year":2018},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:04.468987Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:6abc4724f7e7ed9ee70ca83f58159587a972aeeb85400dbd8d5d931af9d704b1","observation_id":"c676b538-750f-43bc-9336-9dfa8ba6dbab","resolution":{"observed_at":"2026-08-06T11:48:11.268661Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:04.545975Z","title":null,"venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:04.545975Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:cd612ddb653fca7262b1d65cba92ef185eb24f99dcc4c2dd7bb7f4cbdebcc5a3","observation_id":"96e24b97-7fb1-4148-8b89-8e37e8ada48c","resolution":{"observed_at":"2026-08-06T11:48:04.545975Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.254252Z","title":null,"venue":null,"work_id":"bf0d85c5-2ce1-4f3f-b3fa-fcc89c30f22c","year":2020},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:04.631915Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:6d56df38b9df3b0766bd0c502d9cb337682e9c1b19b278d24494f6b7e25cbab1","observation_id":"0efbe31f-b0f5-4ec6-8d2c-1f11d6e9f684","resolution":{"observed_at":"2026-08-06T11:48:11.258082Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.245060Z","title":null,"venue":null,"work_id":"e8f81796-377c-4d11-979a-78503f92cf92","year":2019},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:04.689461Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:fb8b63e69ac32160be346ced1969aad343678bb66225034ff081ebaeccd88bdc","observation_id":"dbf145b0-92a2-4ecb-b176-651d7e46ec96","resolution":{"observed_at":"2026-08-06T11:48:11.248052Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.234972Z","title":null,"venue":null,"work_id":"2e8ca04a-1479-4cdf-8b6f-274440b1cfeb","year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:04.758277Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:1805665a1578f7e87483d751a1a27e061cb13372adccb9898cc1e7be089b9249","observation_id":"d7fac8a4-515a-4883-85ca-596751c2f6d1","resolution":{"observed_at":"2026-08-06T11:48:11.238405Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"9535.33542","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.505359Z","title":null,"venue":null,"work_id":"44f5662b-a2ba-476c-ba63-9b9cf3e00d61","year":2019},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:04.806210Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:84caaf9919e007771964d4a477fee2904b7d580d5f9156d6151f3c17158ff010","observation_id":"0ea3a49b-5c68-4e4d-93f2-3200335c8ca3","resolution":{"observed_at":"2026-08-06T11:48:10.510527Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.224951Z","title":null,"venue":null,"work_id":"bccb9030-4b34-4bad-bc76-28ef8881eecb","year":2019},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:04.884292Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:a8eb32fddfce7fd340d4213ec08a73692e1403717eb9c4f4b99d016c7332ff94","observation_id":"f3c55a2b-2ac7-43dd-b129-b7b5c13b1440","resolution":{"observed_at":"2026-08-06T11:48:11.228101Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.214764Z","title":null,"venue":null,"work_id":"e5bc7d09-3303-4583-bcd7-ecde4687fa50","year":2019},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:05.018460Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:acd30693f53f271fd632f2c0d6911a4d98ce0b5cec9203bb9fa7454b7a25d4c9","observation_id":"9b7635a5-1053-45f8-a67f-ac04a1f20f88","resolution":{"observed_at":"2026-08-06T11:48:11.218208Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:05.081083Z","title":null,"venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:05.081083Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:19007c2da80553792862d8c139e66271c55f9cc568a0be025d917ddfb163ebc2","observation_id":"8eb242b8-fc9c-4157-a9aa-28862b1136f2","resolution":{"observed_at":"2026-08-06T11:48:05.081083Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.203871Z","title":null,"venue":null,"work_id":"8f12fd55-c2b0-4db2-a136-7607058ce060","year":2021},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:05.126505Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:285a4b172f6db99efcdd62cddbf9b4e5909c8f7d7aff18787f2c0c74756a5bf2","observation_id":"002bd567-8ad7-46c7-8353-9306f13b27d2","resolution":{"observed_at":"2026-08-06T11:48:11.207350Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.192923Z","title":null,"venue":null,"work_id":"8c5983aa-07c2-4217-a0b8-de6a1c6614f0","year":2020},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:05.222106Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:753241cb4f3cee05de6c99bdb1394adeee6b26ed2f26c97f7c8a4b1a5424fb11","observation_id":"9ab58921-2734-4d65-8fe0-8a4fe8b985aa","resolution":{"observed_at":"2026-08-06T11:48:11.196897Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2302.12879","last_updated":"2023-02-24T20:29:49Z","snapshot_observed_at":"2026-08-16T15:52:51.267122Z","submitted_at":"2023-02-24T20:29:49Z","title":"autofz: Automated Fuzzer Composition at Runtime","version":1},"cited_work":{"arxiv_id":"2302.12879","doi":null,"metadata_source":"pith","pith_arxiv_id":"2302.12879","snapshot_observed_at":"2026-08-06T11:48:10.290454Z","title":"autofz: Automated Fuzzer Composition at Runtime","venue":"cs.CR","work_id":"54189fa1-b134-4736-872e-aa353c0f6071","year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:05.263141Z"},"links":{"cited_paper":"/paper/2302.12879","citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:f8e18be789ac46b9306baa5cb181194e599412325ca74bad7a00acca8d579490","observation_id":"a0a49bcb-a32a-42a2-afe2-e5c0afd2ce58","resolution":{"observed_at":"2026-08-06T11:48:10.294975Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.180896Z","title":null,"venue":null,"work_id":"36909d4b-d488-4cb1-9827-dd0b0ca35e95","year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:05.360314Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:2bf7c78eddf7b93eab7ebd9ab28fb401e2626d75be17c2079e719abe10110860","observation_id":"ab1283c5-136a-4d84-9af1-ecb29f65ee34","resolution":{"observed_at":"2026-08-06T11:48:11.184409Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.170698Z","title":null,"venue":null,"work_id":"36d04b31-b732-41df-b21a-2e2e02f0612e","year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:05.423707Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:f9e4537cc4aeae86cf4a2e2b7d3bf2e7ca2a369109f18f103b129a030358be4c","observation_id":"abf17619-38b8-4b15-a1a8-7e67b607c58b","resolution":{"observed_at":"2026-08-06T11:48:11.173979Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.160269Z","title":null,"venue":null,"work_id":"e8730023-7f91-4846-ab4a-2150f12deaa3","year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:05.509788Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:1321e6dc1fa7499be8d847315d0b3794c321a5f6d363ade433c613c3055113ac","observation_id":"7ffb8d14-3c0b-4fe9-9cb3-86ff71d1556e","resolution":{"observed_at":"2026-08-06T11:48:11.163785Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.149915Z","title":null,"venue":null,"work_id":"f3be25d6-6bbb-4658-b618-7ca30f793b26","year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:05.586212Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:364314193d9e20dfeb49c0f298bf31bc784e35e24fa6a9bb5506e01a78690fd4","observation_id":"9b2f743b-a66c-4c06-b146-40487c8cecc8","resolution":{"observed_at":"2026-08-06T11:48:11.153353Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.140123Z","title":null,"venue":null,"work_id":"2dbb0b4f-61e3-4d4a-84f9-8d0a01c5a64b","year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:05.652183Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:61b790350a59a16c183229f454807ffa3b1576d2be3cfbac327529f9dde3a0f5","observation_id":"4a2bd64a-e852-4d1e-ab2d-2063269f0bf2","resolution":{"observed_at":"2026-08-06T11:48:11.143440Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.129529Z","title":null,"venue":null,"work_id":"05ac1991-92a1-400b-be5a-526fd47c5e69","year":2022},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:05.692784Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:1d7a99b3d80db843bc572e44942c9ca4d476e288577f4a0d81da40f60ee53154","observation_id":"737bdb0f-d356-47da-aade-46cc94ebfcd7","resolution":{"observed_at":"2026-08-06T11:48:11.133390Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:05.759634Z","title":null,"venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:05.759634Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:552e62ce94059958bc00105f396bf6e5c4f06d6a43ec133e9c5d620083b89877","observation_id":"353ca0f3-8624-485e-b4fc-7ce8557e02e1","resolution":{"observed_at":"2026-08-06T11:48:05.759634Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:05.816062Z","title":null,"venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:05.816062Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:bb7b1867f7efbe9ffbd9a7f4a0cd89e66fd6097c3303b06af7d1e4bd904bc937","observation_id":"0c86450d-dacc-47fd-9ab1-a35d07f044ef","resolution":{"observed_at":"2026-08-06T11:48:05.816062Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2306.11673","last_updated":"2023-06-20T16:51:59Z","snapshot_observed_at":"2026-08-16T15:22:29.323806Z","submitted_at":"2023-06-20T16:51:59Z","title":"A Survey on Automated Software Vulnerability Detection Using Machine Learning and Deep Learning","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2306.11673","snapshot_observed_at":"2026-08-06T11:48:05.891089Z","title":null,"venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:05.891089Z"},"links":{"cited_paper":"/paper/2306.11673","citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:b5e0cb927f1f178babd331c9991b32f173439dd03795030f5cc532efe8cd32ac","observation_id":"b8b61401-ad77-4559-8fb9-84b0b5cf2ef8","resolution":{"observed_at":"2026-08-06T11:48:05.891089Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.119628Z","title":null,"venue":null,"work_id":"7cbfb091-ca83-499e-9b27-e909e432515e","year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:05.928516Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:62e6bbc4bc628d85bdf1306b8d4e3ce604a0c712c6117a0c193f3a455d73a23b","observation_id":"281c1efc-f3f6-459a-ac22-0d12abbdce2e","resolution":{"observed_at":"2026-08-06T11:48:11.122551Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2306.06782","last_updated":"2023-06-11T21:44:47Z","snapshot_observed_at":"2026-08-16T15:24:46.038859Z","submitted_at":"2023-06-11T21:44:47Z","title":"Augmenting Greybox Fuzzing with Generative AI","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2306.06782","snapshot_observed_at":"2026-08-06T11:48:05.989796Z","title":null,"venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:05.989796Z"},"links":{"cited_paper":"/paper/2306.06782","citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:25d4b68aa3fb2952ac737531e5815f87d02a92ad86607dfa3cfd46dd93f548df","observation_id":"655c0ff6-24e1-4ab9-a302-f0d5c8739dc3","resolution":{"observed_at":"2026-08-06T11:48:05.989796Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"3217.32032","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.174143Z","title":null,"venue":null,"work_id":"c9a164ad-6e20-4970-b6f3-569f0b4d7132","year":2018},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:06.061978Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:f9c781b6fd1aef699bcf5c026ef3eb0a7fb026c864408a45566578709a0ed1a7","observation_id":"536ee764-a5ac-4cad-bdc0-9439a5af25c3","resolution":{"observed_at":"2026-08-06T11:48:10.179134Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.109883Z","title":null,"venue":null,"work_id":"56d09300-85b5-4952-9e73-b5017feb61cd","year":2022},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:06.103632Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:01c1c04437f517915cd18491c8aaa3a0ba220dd9a9f51f79b1b7cd4c3a20046b","observation_id":"db7f222c-c700-464e-87c5-9199bfd9790d","resolution":{"observed_at":"2026-08-06T11:48:11.113064Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.099924Z","title":null,"venue":null,"work_id":"69fcef6c-ead5-44d0-895e-82621778cc40","year":2020},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:06.180427Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:39f23ce38a1f470297e0863083ef94c8951a3e6ec2ce0d10cc98ef3bd4fff0ea","observation_id":"65c23bef-f5bd-4592-b0e8-9abbeab6af2a","resolution":{"observed_at":"2026-08-06T11:48:11.103286Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:06.249505Z","title":null,"venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:06.249505Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:5f1176f3276cbc6f06070bc020de160113fa29c8326700726bf93fbb8f363548","observation_id":"4300fd51-ebfa-49da-a42b-92ac7063ca8a","resolution":{"observed_at":"2026-08-06T11:48:06.249505Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:06.309740Z","title":null,"venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:06.309740Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:93f5007deebb8beff15d4b20e1b27526cff6158714e199565d357f9104d09124","observation_id":"c1dcb471-8aec-46e1-8727-4da07b2e6726","resolution":{"observed_at":"2026-08-06T11:48:06.309740Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.089458Z","title":null,"venue":null,"work_id":"14e0beed-c825-4767-8607-2f4b41f57fd9","year":2018},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:06.395617Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:d5a0404d29540f9a9426e5f21f84b68cfe77b8947669a49869800b280ae70d5f","observation_id":"af581a4e-9cd7-4619-a8a2-e377ccb73016","resolution":{"observed_at":"2026-08-06T11:48:11.092519Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.078296Z","title":null,"venue":null,"work_id":"0f13a52d-acf6-4874-8e7a-38f017ad5021","year":2022},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:06.422040Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:3e772a3ab347d0381c6490286953bdaeced29f285f6d6c17d6c0399111cb71c4","observation_id":"792ec7d0-6ef5-4d40-a788-a08b391f5f81","resolution":{"observed_at":"2026-08-06T11:48:11.081824Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.067846Z","title":null,"venue":null,"work_id":"0f4437e5-3738-44c8-beda-46dbce855910","year":2024},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:06.471737Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:7f66a9549ab2a0bcf0c33a41530eb6cd55d564c44036b4c5c16699423dbd5fe5","observation_id":"ce50b399-b46b-4a57-96ba-1d43fce481cb","resolution":{"observed_at":"2026-08-06T11:48:11.071163Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1609/aaai.v33i01.33011044","metadata_source":"openalex","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-10T05:30:23.456663Z","title":null,"venue":"Proceedings of the AAAI Conference on Artificial Intelligence","work_id":"bd52efc4-b1ee-4fb2-abe1-89c1592d8a6a","year":2019},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":41,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:06.540370Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:f6464b2b1520d8c7d4e3a2dabddf1c62af52b89cd9c86d76da4371419cb77de3","observation_id":"0316a882-530f-4f7c-b5c7-de76716a306a","resolution":{"observed_at":"2026-08-06T11:48:09.356976Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.057728Z","title":null,"venue":null,"work_id":"214f8d25-36f2-4242-8cf8-6c2935093512","year":2024},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":42,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:06.583466Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:0bf5f0a4f5ecfb7b07463d69142f8af66064899745849e93dd382d13c429cdb3","observation_id":"420c2c95-8473-4b28-9251-bb7bfcd11230","resolution":{"observed_at":"2026-08-06T11:48:11.060996Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.046499Z","title":null,"venue":null,"work_id":"d84e38e5-245a-4d95-92ad-11007e54a5c0","year":2019},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":43,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:06.644435Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:d201d272fd53ed3a6fe48a592799fad6e7ff62760009f7157853f589108250f6","observation_id":"3d6f63a5-f702-447b-80c0-c7e10cb2a66f","resolution":{"observed_at":"2026-08-06T11:48:11.050242Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.035030Z","title":null,"venue":null,"work_id":"10f52007-ff35-4d52-b906-d8c91a49a51c","year":2019},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":44,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:06.715119Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:f09fe94257431438aa1b7dc86ccd88b4defbdfe7442eb8318c0492ab8b39b0dc","observation_id":"e4999868-5535-4c36-9ce1-6426b2cd9be4","resolution":{"observed_at":"2026-08-06T11:48:11.038491Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.023401Z","title":null,"venue":null,"work_id":"9068c913-1dc7-400f-9ab1-344948e3b06c","year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":45,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:06.759599Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:2c2a73fc6a9d35e0fb9ec3f47a577111196a1d63dab74a520d474679a3a869ef","observation_id":"ad1c740b-5e4d-4de0-94c4-0da6d07b4bb9","resolution":{"observed_at":"2026-08-06T11:48:11.027031Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:06.843099Z","title":null,"venue":null,"work_id":null,"year":2010},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":46,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:06.843099Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:51fd96fdbc5ebf708f0d8bee72ed99b65648691ff421b9c911d3667eb6d72bc5","observation_id":"db22a37b-3105-4ced-9924-c27003dcdc03","resolution":{"observed_at":"2026-08-06T11:48:06.843099Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:11.005780Z","title":null,"venue":null,"work_id":"8815f57a-a440-41f7-81b1-f8ea4c274197","year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":47,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:06.908443Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:beebe192dc73865ffd14b3d7966c3bb75b43f1c792d08530f5f4fda2e7609e74","observation_id":"aaf5ed15-f605-4b88-a569-d707906a6052","resolution":{"observed_at":"2026-08-06T11:48:11.009158Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:06.988748Z","title":"Nguyen, Long H","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":48,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:06.988748Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:f494c2a99f3eafde2b92f7f16d32eb32605899d128e27173ff1b278266c97d36","observation_id":"4f0994a8-724d-41ee-9ce8-6a5d6dc3df30","resolution":{"observed_at":"2026-08-06T11:48:06.988748Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"4884.34189","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:09.967630Z","title":null,"venue":null,"work_id":"3c31c341-ca3b-4845-b266-215bc2634ab0","year":2021},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:07.043888Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:9e53a15891226eef4852d298f2b2fdaffbf62a2a0d921eddbd6970334537810f","observation_id":"491bcb51-cc17-4788-b097-c1d44f80bd76","resolution":{"observed_at":"2026-08-06T11:48:09.972539Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"7852.34587","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:09.903511Z","title":null,"venue":null,"work_id":"1b98f9a2-a357-48e9-baf8-3c7519582c27","year":2021},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":50,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:07.115472Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:c6020870b978cf8dc6642140d6bf8ead4c06fc5325bc6eb9326fc30de2018073","observation_id":"2c74fa43-9d05-4b95-ad75-601a47cae12f","resolution":{"observed_at":"2026-08-06T11:48:09.908731Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.995429Z","title":null,"venue":null,"work_id":"a0eb418c-a29e-4466-9ef9-28f05ba3a871","year":null},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":51,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:07.199974Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:3fc7c4a3a58f2e218cd9bc12c8b84d79e096732c1135756c271774412c5cfaf7","observation_id":"a84363d5-e999-4fc0-a5b8-20f578434238","resolution":{"observed_at":"2026-08-06T11:48:10.999390Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.974411Z","title":null,"venue":null,"work_id":"6d4f8c62-ef86-4cae-85ab-0fad380923f2","year":2020},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":52,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:07.393308Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:efbc37ec7444afa5b5578ffe521d2c2d582c0a4e73e5ab2aa9fc9a79f2043862","observation_id":"aab7cbda-11a1-4768-9ce1-e8a65bb5729c","resolution":{"observed_at":"2026-08-06T11:48:10.978150Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.963680Z","title":null,"venue":null,"work_id":"25110fd3-6e50-48c2-b0ba-6d3969168f67","year":2022},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":53,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:07.471626Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:964fcb0d01f4275bac9fcb16198661caafb7368fcbb9a05315fc0652d10dc5a6","observation_id":"02db7353-1b47-41c6-a0fd-cff8f58ecb6c","resolution":{"observed_at":"2026-08-06T11:48:10.967240Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.952600Z","title":null,"venue":null,"work_id":"3972e1d5-088f-4fb9-81a1-c551fe4c3723","year":2020},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":54,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:07.477743Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:bc4eab2b8e893c6d27c3e1832cbb10ed017444503a9f884690c7307534c005ec","observation_id":"1f1ce250-9a7f-4554-b397-a42db9ce49d9","resolution":{"observed_at":"2026-08-06T11:48:10.956101Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.940122Z","title":null,"venue":null,"work_id":"a4680fce-e4cb-42f8-b9ba-a90f250dc8e5","year":2017},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":55,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:07.567385Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:6c45bfda4ea7acfdd02ef52d7221bdb6f108045a3e90efd5e6ed333c9af2d00b","observation_id":"35aa0a9f-13ac-4ed6-9706-244ce8d28444","resolution":{"observed_at":"2026-08-06T11:48:10.944042Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"1631.13217","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:09.815473Z","title":null,"venue":null,"work_id":"d5a10c61-235f-4e84-8fe2-4ae7857dd6ab","year":2007},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":56,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:07.631574Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:d1baff419595b7e3809ea42557eaa37010149a64808cbb0f07fb34f20a814088","observation_id":"481c7fb9-47f7-4f75-8e11-98bbed0ab8bf","resolution":{"observed_at":"2026-08-06T11:48:09.821532Z","resolver_source":"raw_fallback","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:07.748269Z","title":null,"venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":57,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:07.748269Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:cd2f413c9d9741f7d4af1c35821bec2d9efcadfba93a0a263643596033fb2074","observation_id":"1d7c780d-2ebf-40d0-945d-65ffd1fdb099","resolution":{"observed_at":"2026-08-06T11:48:07.748269Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2506.04962","last_updated":"2026-06-28T09:23:55Z","snapshot_observed_at":"2026-08-16T14:43:03.888466Z","submitted_at":"2025-06-05T12:37:33Z","title":"PoCGen: Generating Proof-of-Concept Exploits for Vulnerabilities in Npm Packages","version":4},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2506.04962","snapshot_observed_at":"2026-08-06T11:48:07.812309Z","title":null,"venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":58,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:07.812309Z"},"links":{"cited_paper":"/paper/2506.04962","citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:68c46d8e31719e1b7b16e591e240a1ffced07476822c64b75c228e569c8dc8dc","observation_id":"1e8fd408-8dec-48af-9bfa-74d5e509d1cd","resolution":{"observed_at":"2026-08-06T11:48:07.812309Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:07.885831Z","title":null,"venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":59,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:07.885831Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:8f66b3f1d5a950f631f1ec431bba9db721d8bbe7380642d34a4b147dcbf33294","observation_id":"48833402-8dca-4120-9dd6-920c666a2226","resolution":{"observed_at":"2026-08-06T11:48:07.885831Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.929483Z","title":null,"venue":null,"work_id":"2e0397c5-c26c-4c59-8969-7c78e066288c","year":2016},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":60,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:07.945509Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:8610f5c6b561b3342baa4fc1b8479cfe29b9768d8d66ead2badf65e44e60d5c0","observation_id":"e4ab0999-ebdb-478c-94e2-8e5d40dc67ad","resolution":{"observed_at":"2026-08-06T11:48:10.933012Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.919083Z","title":"2023.AddressSanitizer","venue":null,"work_id":"09ea6431-fa7e-4207-bd06-42565856ac76","year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":61,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:07.979256Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:e8f1a56521df49b7fa768f17ac4fe21ff617406459095f16a637f9a90d4fcef5","observation_id":"4347f1e0-1374-43d3-9464-b965e400068a","resolution":{"observed_at":"2026-08-06T11:48:10.922341Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.908567Z","title":null,"venue":null,"work_id":"19670061-52f4-4cbd-8497-9dbab316ebaf","year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":62,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:08.077745Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:7d9eb7b2bfff22004d62a5c4689d5f66c32eb44437ebc63e9727798757d9c621","observation_id":"347bb801-84d8-469f-b4cf-aa9b647e278b","resolution":{"observed_at":"2026-08-06T11:48:10.911955Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.897892Z","title":null,"venue":null,"work_id":"82baf64e-0e54-4deb-9f2a-e251fa60ff2b","year":2016},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":63,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:08.157200Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:1abdcad4ca2a63678631c1ddaaf7b083f103bc53e9e61db3b07830f48ee1df96","observation_id":"8c11f600-d9e6-48ca-9361-ae40a864574f","resolution":{"observed_at":"2026-08-06T11:48:10.901469Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.887560Z","title":null,"venue":null,"work_id":"5118b474-72ae-48f6-85ab-e1183e241407","year":null},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":64,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:08.268832Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:9cd8203e3422ab84ea1d34fffecdc2348d735452b82bf280bc5bb813e14bb069","observation_id":"b400639e-f803-4864-a486-5cb02532e4c4","resolution":{"observed_at":"2026-08-06T11:48:10.890951Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:08.407474Z","title":null,"venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":65,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:08.407474Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:fd8f03ca72fd6fa7a8ce7abd4fd45974132255c4618090d669a78cf268ac77c6","observation_id":"404efa81-ec62-42a2-8c82-79fb8846db17","resolution":{"observed_at":"2026-08-06T11:48:08.407474Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.866044Z","title":null,"venue":null,"work_id":"2fcdff2d-fae1-47c9-ae28-2af05a63b04e","year":2021},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":66,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:08.491886Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:a85a098096829cf4f979af34347757379ab6f11697b4967702b3b0cfb9c2f86d","observation_id":"040e7c49-3376-4ad7-a09a-2cfd4d703b32","resolution":{"observed_at":"2026-08-06T11:48:10.869255Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.855778Z","title":null,"venue":null,"work_id":"13cc2ab0-e399-472f-a793-3b294d32a493","year":2021},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":67,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:08.570517Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:e53437344c66292afc5b96e0a927e9335bdea043506751d9958a1fed341ffe19","observation_id":"6bc8775d-6b5c-4d2f-a24b-e64a0eefae39","resolution":{"observed_at":"2026-08-06T11:48:10.859141Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.844738Z","title":null,"venue":null,"work_id":"0f1bc2ca-6125-4bd0-bac2-caf053515df5","year":2021},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":68,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:08.668802Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:886d1bfe54722ac92e3215075d66a6ac4c805eb3941464568fa76beae9a421fc","observation_id":"086b66f8-8977-42a3-9fcb-9a8879bd2e39","resolution":{"observed_at":"2026-08-06T11:48:10.848226Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.834180Z","title":null,"venue":null,"work_id":"0142fe83-42b4-45a7-9d35-b429442d4b58","year":1980},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":69,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:08.758244Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:13346393ba7669214936aef91503ae0a4808498f4247e704cfbc7a5ef81ab709","observation_id":"a822f928-d745-490e-8a25-10d77767d2ba","resolution":{"observed_at":"2026-08-06T11:48:10.837310Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.823593Z","title":null,"venue":null,"work_id":"1cd96707-c2b8-47c9-acc5-e7cc81f235e7","year":2017},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":70,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:08.876131Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:7d9ae3d94fa672c176b334c7459b27e75b13c563c932fb2514a868749d81e8fb","observation_id":"6c678c36-82ba-4142-8435-c44f4e22d6da","resolution":{"observed_at":"2026-08-06T11:48:10.826881Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:08.965495Z","title":null,"venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":71,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:08.965495Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:0229d85f72b388aab3d94b413407d8643cd9a5381f8632f23a8517043810d025","observation_id":"5998c3cf-9e4c-4720-b978-d2883cb9627f","resolution":{"observed_at":"2026-08-06T11:48:08.965495Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.812878Z","title":null,"venue":null,"work_id":"e77f2713-7483-4682-9180-ea92217f934e","year":2021},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":72,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:09.088041Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:bb4f4e4120575370c56b530a55241cd6f572bf5bc19a50b237bc724d7e03d818","observation_id":"9e5bcc74-6f41-4161-b408-021a8db49f0b","resolution":{"observed_at":"2026-08-06T11:48:10.816261Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:09.218795Z","title":null,"venue":null,"work_id":null,"year":2011},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":73,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:09.218795Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:f4aab028983712812785a8e50ead21f8dcac2f16c5c8e8a52e207b234d0bb96b","observation_id":"85bd21dc-c100-4c06-bd83-18679605cdbb","resolution":{"observed_at":"2026-08-06T11:48:09.218795Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.801625Z","title":null,"venue":null,"work_id":"e24f9dba-2b08-4d1c-ad7e-e12df7b5cf84","year":2018},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":74,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:09.262604Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:262b124ccdf191a4e72749ca9abbbe3fc8747291b9d38bb1f9b023a16690471d","observation_id":"f5023a8d-6388-44fb-852d-ac34f452f491","resolution":{"observed_at":"2026-08-06T11:48:10.805194Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.791007Z","title":null,"venue":null,"work_id":"c8108c43-3f5f-4011-a0ba-058cde264827","year":2021},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":75,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:09.266477Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:0037249d73c781c5867fcd8b55e5bc1e187b587042a05087b7e22306f235cc62","observation_id":"dad61f0a-5f72-4e71-be48-1f30c9435324","resolution":{"observed_at":"2026-08-06T11:48:10.794161Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.778868Z","title":null,"venue":null,"work_id":"89a053b6-c13d-4093-9e7e-41cc248f652f","year":2023},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":76,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:09.269820Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:08f8d31a473383e0ab3246b0eca7048c468f52e26b69e631ff4ed93ff473abe1","observation_id":"34224a5a-c1d0-4a65-9610-a1c24e0f147e","resolution":{"observed_at":"2026-08-06T11:48:10.782959Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:09.272747Z","title":null,"venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":77,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:09.272747Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:70caa5682424d80170d2625eca056569beb2b9019c9026dca06cef602e389668","observation_id":"04808af4-bbf3-4ce0-8b36-b6a04b3c2cfa","resolution":{"observed_at":"2026-08-06T11:48:09.272747Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.767061Z","title":null,"venue":null,"work_id":"daa1ceb7-3823-4fc1-8e48-c2c1148d90ce","year":2020},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":78,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:09.276053Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:a2c5211e44d6c5fdd4c1bd0d1f84a8726d499bf7fe4aa9ec217714ef971fe01c","observation_id":"6ef5a249-78c6-4657-820c-13e96183ad3f","resolution":{"observed_at":"2026-08-06T11:48:10.770735Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:09.279470Z","title":null,"venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":79,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:09.279470Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:b1a58669c979ca12b3589bcfed53de90875c5c6bc6a8df7f3764ba7b313a7b54","observation_id":"38e3cbab-47f7-411b-80a6-eeb4d275d5ec","resolution":{"observed_at":"2026-08-06T11:48:09.279470Z","resolver_source":null,"status":"malformed_identifier"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:09.282430Z","title":"Bissyandé","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":80,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:09.282430Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:21c492c06c98d2a760586f9e0bdacbef7d917b06955e07b7a824da73e1653233","observation_id":"bd41e129-8d23-487a-99b5-eb63b501841e","resolution":{"observed_at":"2026-08-06T11:48:09.282430Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.755713Z","title":null,"venue":null,"work_id":"12720e3f-47f1-4cca-9212-9450dcabe8fd","year":2022},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":81,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:09.285750Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:797c20ab48c046a56156652be1f05ee338bde84687424d082effe625c70af1b2","observation_id":"bd76890e-fbd8-46ec-be54-794e833270a5","resolution":{"observed_at":"2026-08-06T11:48:10.759332Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.744529Z","title":null,"venue":null,"work_id":"3185e8f9-add8-4313-b336-447e88500fa2","year":2020},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":82,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:09.288805Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:0fb49b88bb82bffbb103c2269b8ca68f04420b711b72ff54a46ad719b6b795bb","observation_id":"3b8a0ac4-48f2-457a-816f-dd61c02cb709","resolution":{"observed_at":"2026-08-06T11:48:10.747755Z","resolver_source":"raw_fallback","status":"unresolved"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.984973Z","title":"In Proceedings of the 30th ACM Joint European Software Engineering Conference and Symposium on the Foundations of Software Engineering","venue":null,"work_id":"2e2ec9c7-6ed2-4bb0-ad0b-3b53f5936ff8","year":null},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":2022,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:07.237505Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:2210ffd54ffaceaedae7ba223a5a2b220e87ea9e2eb82f2c22d47ac4d78b0d36","observation_id":"aa7d5a67-7223-4306-afcb-6c7c50f3d451","resolution":{"observed_at":"2026-08-06T11:48:10.988759Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-06T11:48:10.876807Z","title":"In Proceedings of the IEEE/ACM 46th International Conference on Software Engineering","venue":null,"work_id":"32926a3a-cd8f-47d4-b788-19ad693c4e89","year":null},"citing_paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation","version":2},"reference_index":2024,"source":"pdf_text","source_observed_at":"2026-08-06T11:48:08.346421Z"},"links":{"citing_paper":"/paper/2507.22442"},"observation_digest":"sha256:fed783f02587965d565c96e0cffad8f1df570dbc5353bfdb8e9659477ec5576f","observation_id":"80df1a84-b627-4e93-9df6-9576e583e267","resolution":{"observed_at":"2026-08-06T11:48:10.880428Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-16T06:30:59.297886+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2507.22442","last_updated":"2026-08-03T06:57:29Z","latest_version":2,"primary_category":"cs.SE","snapshot_observed_at":"2026-08-16T14:43:39.911629Z","submitted_at":"2025-07-30T07:41:31Z","title":"Ensemble Fuzzing with Dynamic Resource Scheduling and Multidimensional Seed Evaluation"},"reference_resolution":{"displayed":83,"state_counts":{"malformed_identifier":1,"metadata_mismatch":5,"parse_uncertain":0,"unresolved":71,"verified_exact":3,"verified_fuzzy":3},"total_outbound_references":83},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-16T06:30:59.297886+00:00","source":"crossref"},{"observed_at":"2026-08-16T06:30:54.164669+00:00","source":"retraction_watch"}],"thesis":"As of 16 August 2026, this Paper Citation Record lists 83 of 83 outbound references and 0 inbound Pith citation observations for arXiv:2507.22442."}