{"as_of":"2026-08-10T12:17:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:27c60916e0d1a22526a3132cd236faa9aea8983ed64ad65a722eb97630f55783","coverage":[{"denominator":22,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":22,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-05T17:45:15.469324Z","state":"measured"},{"denominator":25,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":25,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-10T06:31:04.303077+00:00","state":"measured"},{"denominator":3,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":3,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-05T17:42:00.153714Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"arxiv_reference","source_observed_at":"2026-05-15T09:29:53.404206Z","state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2508.15937","snapshot_observed_at":"2026-08-05T17:42:00.153714Z","title":"Due to rapid electrification and decarbonization, these grids are enabling increasingly higher electricity consumption, necessitating the need for upgrades and planning","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2508.15936","last_updated":"2025-08-21T20:01:29Z","snapshot_observed_at":"2026-08-08T21:35:44.938244Z","submitted_at":"2025-08-21T20:01:29Z","title":"Teleportation based detection of quantum critical points using small spin chains","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-05T17:42:00.153714Z"},"links":{"cited_paper":"/paper/2508.15937","citing_paper":"/paper/2508.15936"},"observation_digest":"sha256:26bded7539bb764aebab2404c28ce9511c30631b7135a70596afba3c3e9fbc33","observation_id":"ff1b59ae-c81a-4a1a-91a2-e136dac6fe1c","resolution":{"observed_at":"2026-08-05T17:42:00.153714Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"cited_work":{"arxiv_id":"2508.15937","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"2508.15937","snapshot_observed_at":"2026-06-05T21:23:00.469572Z","title":"Solving three-phase ac infeasibility analysis to near-zero optimality gap","venue":null,"work_id":"25c6baa1-6b1c-4401-b39f-41a3b5bc8330","year":2025},"citing_paper":{"arxiv_id":"2603.17418","last_updated":"2026-07-05T09:53:30Z","snapshot_observed_at":"2026-08-07T04:51:36.475044Z","submitted_at":"2026-03-18T06:52:47Z","title":"PowerDAG: Supervisory Agentic AI System for Automating Distribution Grid Analysis","version":3},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-05-15T09:29:11.147253Z"},"links":{"cited_paper":"/paper/2508.15937","citing_paper":"/paper/2603.17418"},"observation_digest":"sha256:49ff7e346fa7c3827ee650dfbba4fa6a177bfd923adfcad33da2a71a3339bb0a","observation_id":"eb2ea887-87b3-4116-85c3-e5b9ee75ad44","resolution":{"observed_at":"2026-05-15T09:29:53.406951Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2508.15937","snapshot_observed_at":"2026-07-13T23:12:55.091668Z","title":"Solving three-phase ac infeasibility analysis to near-zero optimality gap,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2603.17418","last_updated":"2026-07-05T09:53:30Z","snapshot_observed_at":"2026-08-07T04:51:36.475044Z","submitted_at":"2026-03-18T06:52:47Z","title":"PowerDAG: Supervisory Agentic AI System for Automating Distribution Grid Analysis","version":4},"reference_index":49,"source":"pdf_text","source_observed_at":"2026-07-13T23:12:55.091668Z"},"links":{"cited_paper":"/paper/2508.15937","citing_paper":"/paper/2603.17418"},"observation_digest":"sha256:500a752e9f0cdda2b139421bb5d3b30b074cff447cf918ab07a8d5217f3ffb36","observation_id":"cee08b43-2696-4cb3-8314-e2cb5b57d767","resolution":{"observed_at":"2026-07-13T23:12:55.091668Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"links":{"evidence":"/evidence","html":"/paper/2508.15937/citation-record","integrity":"/paper/2508.15937/integrity","json":"/paper/2508.15937/citation-record.json","paper":"/paper/2508.15937"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:20.030502Z","title":"Beyond Relaxation and Newton–Raphson: Solving AC OPF for Multi-Phase Systems with Renewables,","venue":null,"work_id":"3ac2d548-def3-4c19-8432-54d872f44d00","year":2016},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:13.389355Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:5bc873d2a8b0bf6e68cb1ab074d82770d5655a74ddf19211cdf3ca6ac844c11a","observation_id":"dd4c875a-45aa-4b79-827c-e47e9abb137b","resolution":{"observed_at":"2026-08-05T17:45:20.117375Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:19.837454Z","title":"Three-Phase Infeasibility Analysis for Distribution Grid Studies,","venue":null,"work_id":"72b16937-7fab-470a-b04c-b4c0573bf03f","year":2022},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:13.457342Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:94b921e9863dd2932fdc8a36596e284fbfef74c89fb7d35fd532ad0f9d7a62e2","observation_id":"63094961-df9a-4980-8752-32dcedc182bd","resolution":{"observed_at":"2026-08-05T17:45:19.931317Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2409.14532","last_updated":"2024-09-22T16:58:06Z","snapshot_observed_at":"2026-08-08T00:46:58.128558Z","submitted_at":"2024-09-22T16:58:06Z","title":"Distributed Primal-Dual Interior Point Framework for Analyzing Infeasible Combined Transmission and Distribution Grid Networks","version":1},"cited_work":{"arxiv_id":"2409.14532","doi":null,"metadata_source":"pith","pith_arxiv_id":"2409.14532","snapshot_observed_at":"2026-08-05T17:45:15.656136Z","title":"Distributed Primal-Dual Interior Point Framework for Analyzing Infeasible Combined Transmission and Distribution Grid Networks","venue":"eess.SY","work_id":"1adbcfba-5b54-4c9a-830c-e149851c5b58","year":2024},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:13.521340Z"},"links":{"cited_paper":"/paper/2409.14532","citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:bca379d0f2fcf9dcf1584b30cf7e81d8d894273d226a3c7876feab4ddcafcaf1","observation_id":"b369f1ae-2005-43bc-bdbb-7568d5a5578c","resolution":{"observed_at":"2026-08-05T17:45:15.741593Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:19.595521Z","title":"Convex Relaxations and Linear Approximation for Optimal Power Flow in Multiphase Radial Networks,","venue":null,"work_id":"6ab5b545-3d34-48c4-bf09-377533b50801","year":2014},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:13.585497Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:3da834a6d855da996d6f75692867e4ebc891ad4f8eeab1007954c42ffe686d64","observation_id":"67cb2644-da19-4ffa-9c1f-42445f7c4106","resolution":{"observed_at":"2026-08-05T17:45:19.701213Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:19.366632Z","title":"Linear Power-Flow Models in Multiphase Distribution Networks,","venue":null,"work_id":"acd62a75-4915-499e-898d-4561da931afb","year":2017},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:13.675922Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:eda2bc167df605b73bb1649d1160887e8f7cf6d73b5edcdc735d079f779534af","observation_id":"fd9a184a-566a-4355-adef-d801bb1758de","resolution":{"observed_at":"2026-08-05T17:45:19.471379Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:19.171419Z","title":"Zero Duality Gap in Optimal Power Flow Problem,","venue":null,"work_id":"950b0dbd-81d5-465f-b9a6-c7b20448bb30","year":2011},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:13.760726Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:8e4c7d3338d3657b4e2694d52c1874e98a784277e96854a18cef69cae66dff8c","observation_id":"75257020-c52a-4525-8d0c-f02db6ca439c","resolution":{"observed_at":"2026-08-05T17:45:19.279925Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:18.946717Z","title":"Global Optimization of Optimal Power Flow Using a Branch & Bound Algorithm,","venue":null,"work_id":"791b97cb-a418-47b3-b33e-fe318e51a33c","year":2012},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:13.830874Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:605cfcc9757737c0cf45d4c6ee0625cec9ca82bdd2ce6bc27467d305c0e2070e","observation_id":"68fdf9b2-a4df-4bc6-b66b-319139536a76","resolution":{"observed_at":"2026-08-05T17:45:19.052428Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2505.18435","last_updated":"2025-05-24T00:05:52Z","snapshot_observed_at":"2026-08-08T16:12:03.630115Z","submitted_at":"2025-05-24T00:05:52Z","title":"Scalable Global Optimization for AC-OPF via Quadratic Convex Relaxation and Branch-and-Bound","version":1},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2505.18435","snapshot_observed_at":"2026-08-05T17:45:13.916032Z","title":"Scalable Global Optimization for AC-OPF via Quadratic Convex Relaxation and Branch-and-Bound,","venue":null,"work_id":null,"year":2025},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:13.916032Z"},"links":{"cited_paper":"/paper/2505.18435","citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:cf3b7442ee56edec14675392d3e9debf60a9819554f5f033777eb499909a3694","observation_id":"14946ace-3f54-410b-8374-22ab406909be","resolution":{"observed_at":"2026-08-05T17:45:13.916032Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:18.771930Z","title":"Global Optimisation of General Process Models,","venue":null,"work_id":"9562caae-5091-41b6-9e38-a1f20c7df81c","year":1996},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:14.001934Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:8c79cc22bbd878fc7e51ca6c673d0388aa861d80ca6e177dfd9e28b3b6e45076","observation_id":"28259333-4fa1-4833-99c7-230a2fddece6","resolution":{"observed_at":"2026-08-05T17:45:18.865478Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:18.557944Z","title":"Convex Relaxation of Sparse Tableau Formulation for the AC Optimal Power Flow,","venue":null,"work_id":"f1c76933-c2a7-40af-a0fa-1f3bbe592666","year":2019},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:14.092127Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:9d6e4db205b12fddf654d5b9f1e5392757c6cdef63a6eefd747a941fb83a3ac1","observation_id":"8f620fa0-aa9d-43f2-8bad-c10abea4a171","resolution":{"observed_at":"2026-08-05T17:45:18.650308Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:18.341818Z","title":"Branch-and-Bound Performance Estimation Programming: A Unified Methodology for Constructing Optimal Optimization Methods,","venue":null,"work_id":"9cd619ed-b228-4b46-95d8-621ecae20263","year":2024},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:14.178053Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:b354df0935609b4e44817416f60a0b70d43f25282f566d931b8946cc85c1931b","observation_id":"88d96ac1-e9dc-42d0-b159-8772e7a66f36","resolution":{"observed_at":"2026-08-05T17:45:18.423615Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:17.976166Z","title":"Circuit-Theoretic Joint Parameter-State Estimation—Balancing Optimality and AC Feasibility,","venue":null,"work_id":"d9a611e9-77ac-41e7-9232-a765b003baec","year":2024},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:14.222788Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:ab4baad3349d194285831f40e61660256cf8d501d11671bdaa17f050db3597dd","observation_id":"6f94a11f-c519-4299-9ee3-46ef6acecbed","resolution":{"observed_at":"2026-08-05T17:45:18.188097Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:17.750276Z","title":"Tightening McCormick Relaxations for Nonlinear Programs via Dynamic Multivariate Partitioning,","venue":null,"work_id":"50573d48-fbad-4889-92f7-d59b35340579","year":2016},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:14.290068Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:c8c0645c63aea2c97a01604b953c05a4415963cb72ca0eb1149b810187a7297d","observation_id":"946e9bf4-8180-4cff-8a56-b9a157b789cf","resolution":{"observed_at":"2026-08-05T17:45:17.865203Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:17.463630Z","title":"Evaluating Feasibility Within Power Flow,","venue":null,"work_id":"0fc3d81c-3eb2-48d6-8f8f-8818f1a3236d","year":2020},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:14.380650Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:5ff5ea48e98d1591b7a8f361bf6871c876d82ed0a969a5bc2125c60e369ac6da","observation_id":"f5fa4d44-798d-4499-bc83-de840b87dee2","resolution":{"observed_at":"2026-08-05T17:45:17.607566Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:17.250274Z","title":"Robust Power Flow and Three-Phase Power Flow Analyses,","venue":null,"work_id":"8af82270-a9cf-4602-984e-95fbecd9d3ae","year":2018},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:14.524685Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:84a41678327e1774623a6269dcb8b29436fe3053cde6c5ce8c6c11862b3237ee","observation_id":"ca354127-4cbe-4e5c-b25d-c47448d4bc1f","resolution":{"observed_at":"2026-08-05T17:45:17.330101Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:16.949752Z","title":"Three-Phase Power Flow Calculations Using the Current Injection Method,","venue":null,"work_id":"7766582e-0991-458c-b419-d4305c3fc363","year":2000},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:14.662374Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:15c09c57e969fc93442ee60619d66615cb4a4299a4775eb882f52d5093560b8a","observation_id":"f96459b3-392d-40b4-9619-506d955bf58f","resolution":{"observed_at":"2026-08-05T17:45:17.109764Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:16.605308Z","title":"[Online]","venue":null,"work_id":"03c193cb-75f4-4775-a08c-9f2dcd34ce44","year":2025},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:14.833885Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:bf3f01e0b34b693161afafb134173122f1dac83f55c0aa422c0540ab9ff2b698","observation_id":"6e0384b0-9eed-4880-b7a4-ef91b5fa0fda","resolution":{"observed_at":"2026-08-05T17:45:16.805070Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:16.322167Z","title":"Computability of Global Solutions to Factorable Nonconvex Programs: Part I—Convex Underestimating Problems,","venue":null,"work_id":"8a6cfc28-4c4b-4c51-b1a1-e756571d1e75","year":1976},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:14.944201Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:f67a3ae1006e386789d019ccd883bb7257484ac88dc4c932fa373684b80560ae","observation_id":"f2f1b661-5600-41f6-977b-87aa4494d3d6","resolution":{"observed_at":"2026-08-05T17:45:16.424985Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:15.051358Z","title":"Tightening Piecewise McCormick Relaxations for Bilinear Problems,","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:15.051358Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:4ece21a579ed19f00262d56a41c360ef6ab30ed08adfd6366558b8d1cd861bcb","observation_id":"2e2a7f5e-3544-4866-8a6d-cac3ed875135","resolution":{"observed_at":"2026-08-05T17:45:15.051358Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:15.210756Z","title":"Modern Grid Initiative Distribution Taxonomy Final Report,","venue":null,"work_id":null,"year":2008},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:15.210756Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:36b32b61288b667ede295ba2500d4b576edc68bef7747a42fd4e121db43d1687","observation_id":"ce192907-9158-4861-9b42-e4c9cf0b7037","resolution":{"observed_at":"2026-08-05T17:45:15.210756Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:15.308672Z","title":"On the Implementation of an Interior-Point Filter Line-Search Algorithm for Large-Scale Nonlinear Programming,","venue":null,"work_id":null,"year":2006},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:15.308672Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:a21fd4f67ed10b319457f227b6043f5533a44ea812e69a9333cab5158ec3bfbc","observation_id":"f5e17b0e-5833-41cc-a27b-0a6f3b0af351","resolution":{"observed_at":"2026-08-05T17:45:15.308672Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T17:45:15.897904Z","title":"PREPRINT Version: Prepared for Hawaii International Conference on System Sciences (HICSS-59)","venue":null,"work_id":"bd877e1e-2fd8-4741-af50-e34f4207bb0b","year":2025},"citing_paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-05T17:45:15.469324Z"},"links":{"citing_paper":"/paper/2508.15937"},"observation_digest":"sha256:65cc13df35966bd6fba236b845d3fe5222692da10b0d090e9367aabba39ce09e","observation_id":"4a0f9fa7-614f-47bc-ae32-b4ed5fbab4ea","resolution":{"observed_at":"2026-08-05T17:45:16.104874Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2508.15937","last_updated":"2025-08-21T20:12:59Z","latest_version":1,"primary_category":"eess.SY","snapshot_observed_at":"2026-08-08T08:58:38.340536Z","submitted_at":"2025-08-21T20:12:59Z","title":"Solving Three-phase AC Infeasibility Analysis to Near-zero Optimality Gap"},"reference_resolution":{"displayed":22,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":4,"verified_exact":1,"verified_fuzzy":17},"total_outbound_references":22},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"thesis":"As of 10 August 2026, this Paper Citation Record lists 22 of 22 outbound references and 3 inbound Pith citation observations for arXiv:2508.15937."}