{"as_of":"2026-08-10T14:42:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:d93050b0b4470c592143556cb13119b4199f412fc313909ada5a4051b917bed8","coverage":[{"denominator":39,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":39,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-05T15:52:27.037575Z","state":"measured"},{"denominator":39,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":39,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-10T06:31:04.303077+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2508.19429/citation-record","integrity":"/paper/2508.19429/integrity","json":"/paper/2508.19429/citation-record.json","paper":"/paper/2508.19429"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.784328Z","title":"Robot swarm navigation and victim detection using rendezvous consensus in search and rescue operations,","venue":null,"work_id":"4639d91e-dd30-4a23-bbbf-c0c4a353d7e7","year":2019},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.835496Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:cf1086d68cc6d71355c0fdaf39a2bb0d21538b063ce00d87a47f6e4cb2c76356","observation_id":"9254f0d6-2158-419f-9a5b-3eca63c00ef0","resolution":{"observed_at":"2026-08-05T15:52:27.789514Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.768834Z","title":"Application of multi-robot systems to disaster-relief scenarios with limited communication,","venue":null,"work_id":"0410fb85-5435-48ad-b2c6-2caa6cd8a87f","year":2016},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.840773Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:93ef06388a60315eaf850b0dadd8dcf28e1428563b29cd52962971c1f19c66fd","observation_id":"271af454-6549-4f8b-95ab-480eb832d589","resolution":{"observed_at":"2026-08-05T15:52:27.773889Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.752099Z","title":"Planning for modular aerial robotic tools with temporal logic constraints,","venue":null,"work_id":"676faec3-79a8-4f29-9aae-bb69ec06a148","year":2022},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.845920Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:27a6a85beae0bb95100bc18d7b4270ec691b0267bc31989577c4fddb616ddaeb","observation_id":"b5bdccc8-3acd-495e-a95c-7f02c61a01a1","resolution":{"observed_at":"2026-08-05T15:52:27.757365Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.736653Z","title":"Nasa robotics research for planetary surface exploration,","venue":null,"work_id":"6e071dba-16fd-41b9-b530-7605409502e7","year":2000},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.850607Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:edd1d15a384d58580d710d3d5579513468a5689653f057dc316170b39641f6f8","observation_id":"67e2f296-5160-4b4f-a1f7-a713e4e103dd","resolution":{"observed_at":"2026-08-05T15:52:27.741432Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.721546Z","title":"An autonomous mobile robotic system for surveillance of indoor environments,","venue":null,"work_id":"1ca3566d-e84f-4dad-8e40-00ef17ad45cf","year":2010},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.855541Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:4659c600728b90d5fc617d013707a3c496656e709c86eea17c2db4f3e2beae47","observation_id":"5ee001d3-5042-4868-87aa-f1c144dd8f2b","resolution":{"observed_at":"2026-08-05T15:52:27.726702Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.705825Z","title":"Construction robotics: From automation to collabora- tion,","venue":null,"work_id":"b4f779a2-cc03-4a18-b280-f71da8a459a0","year":2023},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.860327Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:43f09e7184e9149eaca0a70139ae0bc3e8a5f4fc10c8709a64ab96470373d465","observation_id":"d8f7b748-9fee-4e02-a332-4e12ceae9800","resolution":{"observed_at":"2026-08-05T15:52:27.710845Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.689691Z","title":"Aerial surveillance system using uav,","venue":null,"work_id":"212b33d2-cf63-48ed-b899-0b7eb9e981ed","year":2016},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.865446Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:593b9b30ad9f4c80c3016936d96e69bda6be725da0aa782f897dd457997f35c8","observation_id":"f18f0880-e185-4946-90a0-a8e71becc800","resolution":{"observed_at":"2026-08-05T15:52:27.695071Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2406.18019","last_updated":"2024-06-26T02:13:02Z","snapshot_observed_at":"2026-08-10T03:13:49.004812Z","submitted_at":"2024-06-26T02:13:02Z","title":"Continuous Execution of High-Level Collaborative Tasks for Heterogeneous Robot Teams","version":1},"cited_work":{"arxiv_id":"2406.18019","doi":null,"metadata_source":"pith","pith_arxiv_id":"2406.18019","snapshot_observed_at":"2026-08-05T15:52:27.198630Z","title":"Continuous Execution of High-Level Collaborative Tasks for Heterogeneous Robot Teams","venue":"cs.RO","work_id":"8d145234-c601-4a65-b743-87af7d270998","year":2024},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.870088Z"},"links":{"cited_paper":"/paper/2406.18019","citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:cc6ccb5bb904395b713ad13f868c534dbdb1301e7fd5010bc03b5c543f9e9224","observation_id":"068c6f61-eaaf-4d6d-b434-1d68f2337cc5","resolution":{"observed_at":"2026-08-05T15:52:27.205374Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.671566Z","title":"Accomplishing high-level tasks with modular robots,","venue":null,"work_id":"b2a6cd44-adde-47c8-a4b3-e93854638513","year":2018},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.875159Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:43b200d032311d07a2b6c7c867e55b0a9d6403ccfe5866dd26ef0fbf1c1ba39c","observation_id":"bcc47d9f-8050-4034-8eb1-ddc2d0a6f8b0","resolution":{"observed_at":"2026-08-05T15:52:27.678370Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.653874Z","title":"An end-to-end system for accomplishing tasks with modular robots.,","venue":null,"work_id":"c3338b7c-8100-42d1-b0fb-0c355d779378","year":2016},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.879727Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:e05d4b0ea719c768cc9219c2accd5b75d2395e0fa0a561e1c339feb6ab9ea3e8","observation_id":"6665cfb2-c3f4-4cb0-aad2-ce371eacbc46","resolution":{"observed_at":"2026-08-05T15:52:27.659007Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.638760Z","title":"Energy-aware planning of heterogeneous multi-agent systems for serving cooperative tasks with temporal logic specifications,","venue":null,"work_id":"66c3d964-26cf-4494-9552-c292f4805d0e","year":2023},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.884431Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:47d73adbddc2625dcce2e5fc04d4d825c09c90bdd429c903d228304757bda6eb","observation_id":"4a91ed70-8e01-4057-93e3-10a7d9800215","resolution":{"observed_at":"2026-08-05T15:52:27.643707Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.623135Z","title":"Multi-agent planning under local ltl specifications and event-based synchronization,","venue":null,"work_id":"99393f83-daa4-496a-a70b-c54e96fd2cde","year":2016},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.889435Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:b652f2b1a27a03554d6cc15195bb4ddaf43d021cf693132563636a039fd6ad15","observation_id":"e3bcb811-2904-4be1-9805-eaf1bff8c28b","resolution":{"observed_at":"2026-08-05T15:52:27.628079Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.608273Z","title":"Stylus*: A temporal logic optimal control synthesis algorithm for large-scale multi-robot systems,","venue":null,"work_id":"488600b9-04c6-427a-b256-aa50bca44a72","year":2020},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.895664Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:fd88b41e5fc1f44c1fcf603e9b3f9f40037966a79a9993f5447a3786046084fa","observation_id":"f8d9c4bb-daad-4ad4-92b0-8e5d6bb61634","resolution":{"observed_at":"2026-08-05T15:52:27.613177Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.593597Z","title":"Temporal-logic- based reactive mission and motion planning,","venue":null,"work_id":"5fc7e44f-f7fa-46ca-985c-04b0766224b3","year":2009},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.901974Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:70c8bb5791f99f63a44d964912f67c8ef25d41be1acfe639b182e3477fa3c10a","observation_id":"3532aa3a-2333-4542-9edb-e25c8e4ab1a0","resolution":{"observed_at":"2026-08-05T15:52:27.598265Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.578316Z","title":"Multi-agent motion plan- ning from signal temporal logic specifications,","venue":null,"work_id":"550c4261-1b3f-47ac-9305-21c432e7bfee","year":2022},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.907170Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:d637f561aefb56293e75441680225de4e32af7df1d688ebd3662d4f64b3e0ba9","observation_id":"cf0ecd42-f4d6-4b51-8f70-3dc7639863a1","resolution":{"observed_at":"2026-08-05T15:52:27.583090Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.562508Z","title":"Event-based signal temporal logic synthesis for single and multi-robot tasks,","venue":null,"work_id":"26b11f80-96d3-4631-9d25-9e019e45b962","year":2021},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.912610Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:652908d564ca468f5a03b9f225ff9cff5c83a070613a8e9f47f76ee8093b1555","observation_id":"804d0234-4ec5-44ce-8e57-4abc003d49b7","resolution":{"observed_at":"2026-08-05T15:52:27.567921Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.545995Z","title":"Coupled multi-robot systems under linear temporal logic and signal temporal logic tasks,","venue":null,"work_id":"0003e1e3-9d45-460c-aa4a-6dbfb42378b5","year":2019},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.917915Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:390821ac8891eda4aeb2e83a4da6fc3a0459944033dc81f52702c36f8ac7c871","observation_id":"9e865a74-6f84-479b-b299-e08bd44d0513","resolution":{"observed_at":"2026-08-05T15:52:27.551564Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2309.05632","doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.172974Z","title":"Maps2: Multi- robot anytime motion planning under signal temporal logic specifica- tions,","venue":null,"work_id":"bd41dfbd-c8f6-4e82-902b-36c142701e9c","year":2023},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.923731Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:184384edf362d4ff0adc0e7ef56de368f70707430c4376da5b235cae4cc463ba","observation_id":"0d64e98c-8ad4-4871-b29b-65c6348d5f5e","resolution":{"observed_at":"2026-08-05T15:52:27.181502Z","resolver_source":"raw_fallback","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.528626Z","title":"Planning of heterogeneous multi-agent systems under signal temporal logic spec- ifications with integral predicates,","venue":null,"work_id":"a432133e-1463-4fad-b4fe-fdc81cd48f8c","year":2021},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.928732Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:cd4f26661cc287bc7b796e3d6f143444731d904be1f08540d6f5adb5f8fa1784","observation_id":"24044e9a-3241-4ecd-93b0-3e960c9a885e","resolution":{"observed_at":"2026-08-05T15:52:27.534543Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.511794Z","title":"Scratchs: Scalable and robust algorithms for task- based coordination from high-level specifications,","venue":null,"work_id":"9ded7fda-75ce-4abe-9957-d87aa13e64b6","year":2019},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.933696Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:7e731b82a2c74705c0b6f372c1872e1c6e216793ec999c77f20fc666186b86b4","observation_id":"83e97886-cd97-4092-96b3-1eff20909c58","resolution":{"observed_at":"2026-08-05T15:52:27.517498Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.496300Z","title":"Scalable and robust algorithms for task-based coordination from high-level specifications (scratches),","venue":null,"work_id":"df78cbf0-7e0b-4b56-93d1-8aff33fe8813","year":2021},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.938772Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:7e3f092b5eaae54b80e0c5cee916953b899d9c5a78798667852f74cf7cd44259","observation_id":"3be47ad6-cebb-43db-9730-745b1c708ebf","resolution":{"observed_at":"2026-08-05T15:52:27.501072Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.481143Z","title":"Fast decomposition of temporal logic specifications for heterogeneous teams,","venue":null,"work_id":"bdda830d-6d2c-407f-b8d6-1630e6a15928","year":2022},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.945844Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:adba90b55c425c340f54741488c3f793c583ec9d39f1adb3dae9d4bb8ad4ddda","observation_id":"0b056748-1b83-4229-9ccb-13dad3805f05","resolution":{"observed_at":"2026-08-05T15:52:27.486150Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.465628Z","title":"Planning for heterogeneous teams of robots with temporal logic, capability, and resource constraints,","venue":null,"work_id":"c0fd7b24-a18a-4cea-8415-769f904d14df","year":null},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.955246Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:baad8debf9d9defb58349293a6e30dfecf3cd616e99951c30b722810b0e65267","observation_id":"aca17e67-7236-46d1-82e2-3c2f98c1e11b","resolution":{"observed_at":"2026-08-05T15:52:27.470859Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.450023Z","title":"Safe control under uncertainty with prob- abilistic signal temporal logic,","venue":null,"work_id":"9c40b053-5062-45d9-b0a0-0cb05b23f807","year":2016},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.960738Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:1882f8a9d3648c72c33e8920d7664e666633677ae8aafef975ccf714d7bb4a3d","observation_id":"ba716b61-44bb-44e1-b9e8-b764a4914090","resolution":{"observed_at":"2026-08-05T15:52:27.455195Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.434245Z","title":"Auctioning over probabilistic options for temporal logic-based multi-robot coopera- tion under uncertainty,","venue":null,"work_id":"1fdd3338-c24e-47bd-886d-2dc082c6ff46","year":2018},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.965486Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:d19b2b3b9a89a1d805aa9ae23cb60d3c92d4bdf5ddcc5bdb196e055c5f78783d","observation_id":"9091b218-9506-4082-a794-c6d41b0c8fbd","resolution":{"observed_at":"2026-08-05T15:52:27.439595Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.417579Z","title":"Hierarchical motion planning under probabilistic temporal tasks and safe-return constraints,","venue":null,"work_id":"4935ad06-98af-46ca-93d2-b0e8b2746e76","year":2023},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.970228Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:217386265817c251187159f3b73879fb12685b0a9324afa72eed749feb2120cc","observation_id":"f6d82486-47c8-43f9-b8fd-9e48b42a01f3","resolution":{"observed_at":"2026-08-05T15:52:27.423099Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.401228Z","title":"Safe autonomy un- der perception uncertainty using chance-constrained temporal logic,","venue":null,"work_id":"97f5ae23-5154-46a7-acfa-1e4cf178f08c","year":2018},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.975279Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:241a13ba96f90ce38de110f6880c2dc033a0e8c01fd9031bfa831b70b991e565","observation_id":"02ae1ef3-8500-4c77-8a58-087c3b92d2b0","resolution":{"observed_at":"2026-08-05T15:52:27.406323Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.383910Z","title":"Probabilistic co- ordination of heterogeneous teams from capability temporal logic specifications,","venue":null,"work_id":"bcdd5997-e421-4d52-b957-f90ad2dcd39c","year":2021},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.980177Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:ec90a7d6cdf127fb8fd15b9fb255750905765ebab732fbcf066f683f46ce4846","observation_id":"103fb095-f022-4ce9-89ad-3c0984eb2664","resolution":{"observed_at":"2026-08-05T15:52:27.389810Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.366742Z","title":"An iterative approach for heterogeneous multi-agent route planning with temporal logic goals and travel duration uncertainty,","venue":null,"work_id":"40174bd4-0454-4caf-ac01-4d15bfd37d20","year":2024},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.985387Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:9e0ed084e7c0a82a4adfea978267159868d2971df613ddcbee91b527351176bb","observation_id":"398bd5ca-5af7-4140-a4d1-1eb89158b8e3","resolution":{"observed_at":"2026-08-05T15:52:27.372230Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.350840Z","title":"Monitoring temporal properties of contin- uous signals,","venue":null,"work_id":"e2358258-a603-4408-8f62-1086228e561a","year":2004},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.990553Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:bca3c0e1baf5d1538552dd80a01cc359f50059e1d73de515ae7ccc70c2846843","observation_id":"4390c0b1-90ab-4ff8-be86-d9cf2af3dc47","resolution":{"observed_at":"2026-08-05T15:52:27.355824Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.334729Z","title":"Robust multi-agent coordination from catl+ specifications,","venue":null,"work_id":"6fe50b21-30b6-4394-8f82-bd6bd0703b69","year":2023},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:26.995541Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:c7fd69356a15fcd3c6f0550445720fadc1b4c7b92c896cc36f46c016bfdd3336","observation_id":"947aaf15-fa86-4e85-92a8-2884471505ca","resolution":{"observed_at":"2026-08-05T15:52:27.340285Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.317409Z","title":"Partial Satisfaction of Signal Tempo- ral Logic Specifications for Coordination of Multi-robot Systems,","venue":null,"work_id":"4d2bce1c-a156-46ef-8719-ffae37ec174a","year":2022},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:27.000395Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:02cb680c56311eef11e707685dbbb51c4be3e938ef0d3b509290a3bf480cb1d3","observation_id":"29d778f7-506f-4403-9387-2dfc5d2ee811","resolution":{"observed_at":"2026-08-05T15:52:27.322655Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.300994Z","title":"Preferences on partial satisfaction using weighted signal temporal logic specifications,","venue":null,"work_id":"998a2892-b107-4cf8-8b97-1e407326ae74","year":2023},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:27.005992Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:357244b4f45853372c0799ab0c30f5db657b7843c01af952fbaab406cdeba8b4","observation_id":"ed42d9f3-31a5-414f-b950-701bb7bdb714","resolution":{"observed_at":"2026-08-05T15:52:27.306356Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.011103Z","title":"Probabilistic robotics,","venue":null,"work_id":null,"year":2002},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:27.011103Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:b082147d0c8277e57f1ed5f85253b4039e484bcb581af7d02af94a50897d876c","observation_id":"11334242-e084-4e93-82a8-8edb9eb76aa4","resolution":{"observed_at":"2026-08-05T15:52:27.011103Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.271022Z","title":"Gurobi optimizer reference manual,","venue":null,"work_id":"760c3559-36b0-45fe-80fa-0e5ad625bce6","year":2020},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:27.015703Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:b98df8e329d97cd3edb6b284daad1140796ecd163f7da87b4d6ff73bbbafb229","observation_id":"a5c35c10-1254-4e4a-b355-64b750f04a30","resolution":{"observed_at":"2026-08-05T15:52:27.277009Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2310.08714","last_updated":"2023-10-12T20:52:41Z","snapshot_observed_at":"2026-08-10T09:36:52.419021Z","submitted_at":"2023-10-12T20:52:41Z","title":"A Flexible and Efficient Temporal Logic Tool for Python: PyTeLo","version":1},"cited_work":{"arxiv_id":"2310.08714","doi":null,"metadata_source":"pith","pith_arxiv_id":"2310.08714","snapshot_observed_at":"2026-08-05T15:52:27.078014Z","title":"A Flexible and Efficient Temporal Logic Tool for Python: PyTeLo","venue":"cs.LO","work_id":"266fc22d-09cb-448f-af80-9a55ca5b99e6","year":2023},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:27.020816Z"},"links":{"cited_paper":"/paper/2310.08714","citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:1a23fc3ee9862a55dbf61fec521352dcca59186d1b66a44537dc43172deffc71","observation_id":"f404e54f-197e-4c6c-8282-794ced37b9a2","resolution":{"observed_at":"2026-08-05T15:52:27.085760Z","resolver_source":"local_arxiv","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.251622Z","title":"Parr, The definitive ANTLR reference: building domain-specific languages","venue":null,"work_id":"a9ecddbd-ef03-45de-b08b-534225b8af2d","year":2007},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:27.026791Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:238b3f2400e676fe09d5738392f3315adbf67052da1d4a16d9bdd9bbe802f90d","observation_id":"33d01606-80f5-432e-935d-1c7afddfef48","resolution":{"observed_at":"2026-08-05T15:52:27.257767Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.234229Z","title":"Ltl optimal multi-agent planner (lomap)","venue":null,"work_id":"d40cf564-ac4f-406d-8c2a-8de001b4b37e","year":2024},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:27.032505Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:7b0a74bb524b7a5d5f9b2fbba82c6f0726825c7d4ec8d576fa51145ca82ac2cf","observation_id":"3ba8a840-6792-452a-9f8d-bcc594783bd9","resolution":{"observed_at":"2026-08-05T15:52:27.239356Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":"raw_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T15:52:27.217114Z","title":"Exploring network structure, dynamics, and function using networkx,","venue":null,"work_id":"38143a3c-2244-4f2d-9687-4d5fea09d7ee","year":2008},"citing_paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals","version":1},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-08-05T15:52:27.037575Z"},"links":{"citing_paper":"/paper/2508.19429"},"observation_digest":"sha256:7663b628510cfdb77582f2324bd93a87e9d2a11d5a2b9e94bff4d516e868f022","observation_id":"31f44d32-5df4-4b2d-8b51-dd54f5792143","resolution":{"observed_at":"2026-08-05T15:52:27.222689Z","resolver_source":"raw_fallback","status":"verified_fuzzy"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2508.19429","last_updated":"2025-08-26T20:52:11Z","latest_version":1,"primary_category":"cs.RO","snapshot_observed_at":"2026-08-08T04:40:16.385477Z","submitted_at":"2025-08-26T20:52:11Z","title":"An Iterative Approach for Heterogeneous Multi-Agent Route Planning with Resource Transportation Uncertainty and Temporal Logic Goals"},"reference_resolution":{"displayed":39,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":1,"verified_exact":3,"verified_fuzzy":35},"total_outbound_references":39},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"thesis":"As of 10 August 2026, this Paper Citation Record lists 39 of 39 outbound references and 0 inbound Pith citation observations for arXiv:2508.19429."}