{"as_of":"2026-08-12T08:58:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:8a0b94890cc2d421d59a55ca5cc946b204e182a292948ec48f7306eadfc1e408","coverage":[{"denominator":40,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":40,"source":"paper_references, paper_reference_links","source_observed_at":"2026-06-29T17:31:03.383308Z","state":"measured"},{"denominator":41,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":41,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-12T06:34:41.77262+00:00","state":"measured"},{"denominator":1,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":1,"source":"paper_references, paper_reference_links","source_observed_at":"2026-08-01T04:54:11.693692Z","state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[{"citation":{"cited_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":"2605.26625","snapshot_observed_at":"2026-08-01T04:54:11.693692Z","title":"Provably safe motion planning under unknown disturbances,","venue":null,"work_id":null,"year":2026},"citing_paper":{"arxiv_id":"2607.22409","last_updated":"2026-07-24T15:27:07Z","snapshot_observed_at":"2026-08-06T08:26:50.852020Z","submitted_at":"2026-07-24T15:27:07Z","title":"Conformal Constraint Tightening for Chance-Constrained Motion Planning with Unknown Dynamics","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-08-01T04:54:11.693692Z"},"links":{"cited_paper":"/paper/2605.26625","citing_paper":"/paper/2607.22409"},"observation_digest":"sha256:728bfc13ff398899235df53686a3871560c232b4c39c0fe66888886605276d43","observation_id":"b3f5d05a-b56b-4545-b97d-091c1814879f","resolution":{"observed_at":"2026-08-01T04:54:11.693692Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}}],"links":{"evidence":"/evidence","html":"/paper/2605.26625/citation-record","integrity":"/paper/2605.26625/integrity","json":"/paper/2605.26625/citation-record.json","paper":"/paper/2605.26625"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Rapidly-exploring random trees : a new tool for path planning,","venue":null,"work_id":null,"year":1998},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":1,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:8a789bc36df2383e202f31df8f1ae203de75499f1a39f8301095a25c1d213762","observation_id":"5bf6df1e-ad88-4f85-b82b-54e42cf392e6","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Sampling-based algorithms for optimal motion planning,","venue":null,"work_id":null,"year":2011},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:c280f3e5fe803d87c5dcdd84ae89b096df9b7cb14a4d412c7ff10abd12606314","observation_id":"ee94748c-d47b-4357-bac7-b7eef0765dd2","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Asymptotically optimal sampling- based kinodynamic planning,","venue":null,"work_id":null,"year":2016},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:c04840c6138b7f7dce9d86ae9adaf0f94f92f3d9a926e15f1d95661654f1d7eb","observation_id":"0ea150b5-aa68-48c1-a3d2-1f0243163c6d","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Cort ´es and T","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:e8d7f7c817024f725edd27dbbd753af28e4586520b9e740716d995663b2d9309","observation_id":"3fa8b66f-7ecd-43a9-abed-083145522395","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"An optimizing sampling-based motion planner with guaranteed robustness to bounded uncertainty,","venue":null,"work_id":null,"year":2014},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:8254da73daec7b5f235b0a73e54c370e175c3456aa4fa40437568cc61876f3c5","observation_id":"a0484280-5693-4ba0-9504-f3ba26526394","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Robust-rrt: Probabilistically-complete motion planning for uncertain nonlinear sys- tems,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:65230ea2e7bf22d8bbc9c74270d1f32d8f08181f552386d95cbb7fb8d836968c","observation_id":"d92698da-daf9-4861-966e-db48861751ab","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Funnel libraries for real-time robust feed- back motion planning,","venue":null,"work_id":null,"year":2017},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:653ff1c8646d82e8344478f48a0cbd03ab9ae5c5d5f0f153ca6e3baa464cc581","observation_id":"3e80c66a-90c1-4f46-a578-3c0d93d008df","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Dynamic tube mpc for nonlinear systems,","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:9e13daab9bc795b71445e9de446b20597f9e1010cf38548ffe15659e03ad6710","observation_id":"e61b864f-a840-4149-b8cc-15d217764964","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Chance constrained RRT for probabilistic robustness to environmental uncertainty,","venue":null,"work_id":null,"year":2010},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:dcd9baa3d2b588128a21cda89bcfb6a846b921327c16797023500f36b7a8b89c","observation_id":"e9b01318-3cba-4bfb-95ad-149f649f71bf","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Gaussian belief trees for chance constrained asymptotically optimal motion planning,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:24496b8af67a158ba9f015dfc63c77e72fe5c3c903a136c1a320490bd1ba00f2","observation_id":"d0766d4e-8332-41b6-a6a2-c4a59767fe3e","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Robust motion planning in the presence of estimation uncertainty,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:204416788ff486bc3b56fde2f86d6a0eb87e6259c55b1ad54353c398f797c8b0","observation_id":"2d74b1fb-819c-4b13-8222-dcc3767caea2","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Perception-based temporal logic planning in uncertain semantic maps,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:af61bb29b9a7cf6707914f13eda6c87afdab61e744f066e73af01f288b2bad18","observation_id":"f56deed3-54b0-43c8-8bae-02d48be079a0","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"The belief roadmap: Efficient planning in belief space by factoring the covariance,","venue":null,"work_id":null,"year":2009},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":13,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:b73c13dd263803fab61a421668a4f0e544b11e2c23e01b617824905c7c270f1f","observation_id":"7926a505-5725-4652-9802-384c0d188508","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Rapidly-exploring random belief trees for motion planning under uncertainty,","venue":null,"work_id":null,"year":2011},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:8156e96a2984baf902e475ef0bde06796468f541fb69113232eb12ffe1f1edf9","observation_id":"465c4193-85bb-44ed-8c79-079f4b700b45","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Distributionally robust sampling-based motion planning under uncertainty,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:34e31764f562654d5cf62a26cf428f7d6b7241031b05ee8a8fccabbc497efaf0","observation_id":"a0933258-925c-456d-86e2-21e43c0dd62d","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Distributionally robust rrt with risk allocation,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:b2172f86411caf36807b353cfe89c9ea8660d787ea6312f6d957a91f3b304058","observation_id":"7f536aa1-5c3d-4bf0-89c1-27042b7e2450","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Distributionally robust stochastic optimiza- tion with wasserstein distance,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:61fe1e1f8c09461c04525d2b03c57f4f6bbea9f2482680bca5e6833e4a813e5a","observation_id":"bfe5a49c-5731-47c9-b318-90d362395ca6","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Data-driven distributionally robust optimization using the wasserstein metric: Performance guarantees and tractable reformulations,","venue":null,"work_id":null,"year":2018},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:61787b70e4fd0b0be0b8681520b57cc18647fe24c2fd21443e37e3aaf6bea2a1","observation_id":"620d1e33-0698-47dd-9502-e00ee0bf49b7","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Quantifying distributional model risk via optimal transport,","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:2c97e772048c0215f0ee2339799ca2d892135fde1bb6277755b84c9a8cbf51be","observation_id":"727ec3ed-965f-42b0-8676-910c24139586","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"High-confidence data-driven ambiguity sets for time-varying linear systems,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:8b3af51c1bc7d0ffb32ed7a462e321f487036a1dc9420e178a97d06216008e36","observation_id":"47d45829-d331-46a0-8955-c7b2f4062781","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Uncertainty propa- gation via optimal transport ambiguity sets,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:2967a8c6214ae0c1500e2d6981cf002549d27b00720ff86b431d5e1ae09ac87c","observation_id":"69382054-7c02-4654-ac96-6fb61e51ff76","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Capture, propagate, and control distributional uncertainty,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:7dd13f90825f8e28ab9d65296f1f65f16429742562497fd8223f6537bd61ec2f","observation_id":"18fe711a-719e-465c-bf46-a1df22a9f821","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2506.08689","last_updated":"2025-06-11T08:29:12Z","snapshot_observed_at":"2026-08-11T02:33:37.468454Z","submitted_at":"2025-06-10T10:54:29Z","title":"Efficient Uncertainty Propagation with Guarantees in Wasserstein Distance","version":2},"cited_work":{"arxiv_id":"2506.08689","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"2506.08689","snapshot_observed_at":"2026-06-29T17:33:45.140410Z","title":"Efficient uncertainty propagation with guarantees in wasserstein distance,","venue":null,"work_id":"40ee5fe5-e2ae-47dc-ab0e-3b07938ecdfa","year":2025},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"cited_paper":"/paper/2506.08689","citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:98b3e6846cebaeae93fb5770ba63304fcbd07c035a263f2895baf91f365dce5c","observation_id":"b39ef515-496b-4f9c-929c-74f2d4fcf7a2","resolution":{"observed_at":"2026-06-29T17:33:45.142205Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Distributionally safe path planning: wasserstein safe rrt,","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:06cd6124e032a232a09dba901c6589f65a6ab3bb9f34d4ff6d6611490d0ed9f5","observation_id":"1df8c5db-bc17-4d60-877b-7caf56d4926d","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Distributionally robust risk map for learning- based motion planning and control: A semidefinite programming ap- proach,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:8aab26bb0fb8b264c86ee2b6128fc4f67fab0e82e3e41b1796badb4f88b50212","observation_id":"056bb1dd-9f2f-4c82-8b97-1d19e541c953","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Wasserstein distributionally robust motion planning and control with safety constraints using conditional value-at-risk,","venue":null,"work_id":null,"year":2020},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:27daa3cfefaf6dab6ac4c83f1ad87c5560c5e9900a0ab50b5ce45a08d1ad0cb1","observation_id":"c550b13d-5894-471e-826e-24a23eed4c0b","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Wasserstein tube mpc with exact uncertainty propagation,","venue":null,"work_id":null,"year":2023},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:326b17d6b94ee02e20d301e5f863e38259886ec67ef8494a3b606049ca412bb1","observation_id":"8ee308a5-0fb0-459f-a532-8a250f5ee7e7","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Coherent measures of risk,","venue":null,"work_id":null,"year":1999},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:2ab73a2d0218b1a357ea4e78522c9d08b9e593e74a8c626579b0ab042583217d","observation_id":"4a779f41-7a03-45f1-83b1-8c3df1475d8a","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2310.20657","last_updated":"2023-10-31T17:26:33Z","snapshot_observed_at":"2026-08-11T02:34:08.537899Z","submitted_at":"2023-10-31T17:26:33Z","title":"Structured ambiguity sets for distributionally robust optimization","version":1},"cited_work":{"arxiv_id":"2310.20657","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"2310.20657","snapshot_observed_at":"2026-06-29T17:33:45.143378Z","title":"Structured ambi- guity sets for distributionally robust optimization,","venue":null,"work_id":"981c7580-93ad-4b95-92a8-10534bff6e1a","year":2023},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"cited_paper":"/paper/2310.20657","citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:0c19daf6235773fcfd016a5b65ccf2ba3add2b94ccfcef1c448de89afe8e77c4","observation_id":"6b350397-6e8c-4e64-ac53-9de7be3ef841","resolution":{"observed_at":"2026-06-29T17:33:45.145169Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Chance constrained rrt for prob- abilistic robustness to environmental uncertainty,","venue":null,"work_id":null,"year":2010},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:421b40585a024f7f3a526ad8061ce90f3375637e066c99c8775957decd551f5d","observation_id":"3fb0e10e-98d6-47e2-9bc9-0e77a86c184a","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"On the rate of convergence in wasserstein distance of the empirical measure,","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:d7fcfb3363cfc13700fca4bb53ab5ca19dc8af5f5f260ccb2f1fde70b542efa3","observation_id":"d01c0501-7ec5-49f0-bbab-7435ebad9000","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"2209.00923","last_updated":"2023-03-14T16:23:12Z","snapshot_observed_at":"2026-08-11T02:33:52.639229Z","submitted_at":"2022-09-02T09:58:03Z","title":"Convergence of the empirical measure in expected Wasserstein distance: non asymptotic explicit bounds in $\\mathbb{R}^d$","version":2},"cited_work":{"arxiv_id":"2209.00923","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"2209.00923","snapshot_observed_at":"2026-06-29T17:33:45.148307Z","title":"Convergence of the empirical measure in expected wasser- stein distance: non asymptotic explicit bounds inR d,","venue":null,"work_id":"7d818171-dacf-4e95-b0cc-662883c89130","year":2022},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"cited_paper":"/paper/2209.00923","citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:c1aa9136b39f35d2a09895f17c66af1a72b4b7f8712fc6574508a0d6a176c781","observation_id":"d6c92019-9982-4d5e-8687-8d2ac769389b","resolution":{"observed_at":"2026-06-29T17:33:45.150058Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2406.09704","last_updated":"2024-06-14T04:14:30Z","snapshot_observed_at":"2026-08-11T02:33:53.804780Z","submitted_at":"2024-06-14T04:14:30Z","title":"Data-Driven Strategy Synthesis for Stochastic Systems with Unknown Nonlinear Disturbances","version":1},"cited_work":{"arxiv_id":"2406.09704","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"2406.09704","snapshot_observed_at":"2026-06-29T17:33:45.145638Z","title":"Data-driven strategy synthesis for stochastic systems with unknown nonlinear dis- turbances,","venue":null,"work_id":"c08f059d-03c0-41e2-8cf1-dbaa6836171e","year":2024},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"cited_paper":"/paper/2406.09704","citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:f02a77b087c9d9b66470206d796667418aac196a3c6b2c95022241c2972ae55f","observation_id":"0b215884-38f9-46a4-9299-2f783eae3f9f","resolution":{"observed_at":"2026-06-29T17:33:45.147702Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"An introduction to cora 2015,","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:379bc143ab61e9fc413091e50fd61d442bc9a453a6077dfd17d66d6a57a9d6fe","observation_id":"19bd0b7a-f1bf-40c4-b364-178bc6f7ba29","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Sce- nario reduction revisited: Fundamental limits and guarantees,","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":35,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:3c7d9312e912b902ecc7e835eb343c09632f5350e4245a7dafa76fcd0d3e220e","observation_id":"56d5f006-6f17-4c9d-9c00-e4f2cb28c21d","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Least squares quantization in pcm,","venue":null,"work_id":null,"year":1982},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":36,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:1a21ac1cd5c73720290bff5cc73cf6b32d82a6d4d92e177295ad51685c70d79f","observation_id":"8e168a4b-cb48-458e-b590-92086e591262","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"The Open Motion Planning Library,","venue":null,"work_id":null,"year":2012},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":37,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:931afa05493132c5f0c7922538174622931d5345da1e504ad78fb8435e206f8b","observation_id":"10ae4490-06ce-449c-9243-3b5a9380120f","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Probabilistic completeness of rrt for geometric and kinodynamic plan- ning with forward propagation,","venue":null,"work_id":null,"year":2019},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":38,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:352ed1a6420d0119f2415c9194ddda6367eb1346987be125784034e1a0b75c10","observation_id":"421c4085-cbc7-4f28-b17a-fa0a0cb13917","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-29T17:31:03.383308Z","title":"Villani,Topics in optimal transportation","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":39,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:c570128a490188b02e113bde291dced06ca335eb1a6fccc1085350ec411df9e3","observation_id":"1431c0a3-f438-465f-9531-69a094ac5452","resolution":{"observed_at":"2026-06-29T17:31:03.383308Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":{"arxiv_id":"1809.07051","last_updated":"2022-05-31T07:11:19Z","snapshot_observed_at":"2026-08-11T07:42:44.025406Z","submitted_at":"2018-09-19T08:17:10Z","title":"Probabilistic completeness of RRT for geometric and kinodynamic planning with forward propagation","version":2},"cited_work":{"arxiv_id":"1809.07051","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"1809.07051","snapshot_observed_at":"2026-06-29T17:33:45.137323Z","title":"Probabilistic completeness of rrt for geometric and kinodynamic plan- ning with forward propagation,","venue":null,"work_id":"e4b25058-f39d-495f-abd3-229b7ddbe63c","year":2018},"citing_paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances","version":2},"reference_index":40,"source":"pdf_text","source_observed_at":"2026-06-29T17:31:03.383308Z"},"links":{"cited_paper":"/paper/1809.07051","citing_paper":"/paper/2605.26625"},"observation_digest":"sha256:9e3b3badf46bf7b631b879044efb856e98b324f413ae02f0687456cd1c8be146","observation_id":"58bc1058-3536-4353-82d6-77d8b91e3307","resolution":{"observed_at":"2026-06-29T17:33:45.139140Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-12T06:34:41.77262+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2605.26625","last_updated":"2026-05-30T01:43:59Z","latest_version":2,"primary_category":"cs.RO","snapshot_observed_at":"2026-08-11T02:34:35.677088Z","submitted_at":"2026-05-26T07:02:27Z","title":"Provably Safe Motion Planning Under Unknown Disturbances"},"reference_resolution":{"displayed":40,"state_counts":{"malformed_identifier":0,"metadata_mismatch":0,"parse_uncertain":0,"unresolved":35,"verified_exact":5,"verified_fuzzy":0},"total_outbound_references":40},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-12T06:34:41.77262+00:00","source":"crossref"},{"observed_at":"2026-08-12T06:34:36.333875+00:00","source":"retraction_watch"}],"thesis":"As of 12 August 2026, this Paper Citation Record lists 40 of 40 outbound references and 1 inbound Pith citation observation for arXiv:2605.26625."}