{"as_of":"2026-08-10T12:05:00Z","caps":{"database_statements":6,"inbound":100,"outbound":100},"context_digest":"sha256:554565db8fb2aa1e2e89827bf4ff7d60a0047ae62d47869d90acb6d721e89905","coverage":[{"denominator":32,"lane":"reference_resolution","note":"Typed states for the displayed outbound observations.","records_observed":32,"source":"paper_references, paper_reference_links","source_observed_at":"2026-06-28T18:17:07.763765Z","state":"measured"},{"denominator":32,"lane":"standing_notices","note":"One-hop event checks from named stored sources.","records_observed":32,"source":"scholarly_work_events, retraction_status_cache","source_observed_at":"2026-08-10T06:31:04.303077+00:00","state":"measured"},{"denominator":0,"lane":"inbound_itemization","note":"Pith citing papers itemized under the disclosed page cap.","records_observed":0,"source":"paper_references, paper_reference_links","source_observed_at":null,"state":"measured"},{"denominator":1,"lane":"external_citation_measurements","note":"A source-named dated measurement, never combined with another source.","records_observed":0,"source":"cited_works","source_observed_at":null,"state":"measured"}],"external_citation_measurements":[],"inbound":[],"links":{"evidence":"/evidence","html":"/paper/2606.00792/citation-record","integrity":"/paper/2606.00792/integrity","json":"/paper/2606.00792/citation-record.json","paper":"/paper/2606.00792"},"outbound":[{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2020.115439","doi":"10.1016/j.apenergy.2020.115439","metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Forrest, M","venue":"Applied Energy","work_id":"271feea7-2058-434a-89e6-316c0577bc0d","year":2020},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":2,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:220376491bb9fa5100709eba548d3252559f2bf6a87315243e330690be071b01","observation_id":"9f43a0c8-deb8-47a6-9e41-bdf131652978","resolution":{"observed_at":"2026-06-28T18:22:27.132887Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2022.133249","doi":"10.1016/j.jclepro.2022.133249","metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Alonso-Villar, B","venue":"Journal of Cleaner Production","work_id":"764e9996-382b-41d1-8630-2af691c5a499","year":2022},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":3,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:56f24ab075f2d751aa565c1e084a99e2a00f8ec962b66416964fcd00c5ad3b2e","observation_id":"90a01689-3d64-4362-9488-731aec624e56","resolution":{"observed_at":"2026-06-28T18:22:27.098781Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"5779.2023","doi":"10.23919/acc55779.2023","metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Automated Vehicle Highway Merging: Motion Planning via Adaptive Interactive Mixed-Integer MPC","venue":null,"work_id":"b3a0b44f-e99e-4965-a66b-9531249fa5c9","year":2023},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":4,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:38845b13242ff66349ff968e4e8b5ae794ac3ead08480b23c5b92088c96fccfb","observation_id":"f6482872-49b7-4ca9-8eaf-a17ab46b0b21","resolution":{"observed_at":"2026-06-28T18:22:27.096566Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T18:17:07.763765Z","title":"March, 2021, [Online]","venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":5,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:14368f38a013c81563feedbf38462403cf64f4bdb02d1b35be731593e4517cc1","observation_id":"58254496-712e-423d-be19-6de3120c15b1","resolution":{"observed_at":"2026-06-28T18:17:07.763765Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2013.0490","doi":"10.1287/trsc.2013.0490","metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Schneider, A","venue":"Transportation Science","work_id":"6f67713d-b6f0-43b0-ab08-29d7de3630c3","year":2014},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":6,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:b2f6b03b41606e22d6769817adf7210efa9a9f0590a056f8c06af0df1a4b6445","observation_id":"cfc8a315-1690-46b9-b2ec-91dd690ea6a2","resolution":{"observed_at":"2026-06-28T18:22:27.123360Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-05-22T20:25:00.509536+00:00","source":"crossref_status_cache"},{"observed_at":"2026-05-22T20:25:00.509536+00:00","source":"openalex_status_cache"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/j.tre.2014.09.003","metadata_source":"openalex","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Felipe, M","venue":"Transportation Research Part E Logistics and Transportation Review","work_id":"1366cdd7-3f71-40ca-8123-7c9543eeafa6","year":2014},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":7,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:15e7f8e4c3676e26cbc41bac292425328f373888e2265f4bbd958c70998d6298","observation_id":"5d1d69f3-a127-4d96-a44a-e96091707625","resolution":{"observed_at":"2026-06-28T18:22:27.115677Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2022.102917","doi":"10.1016/j.tre.2022.102917","metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Dönmez, Ç","venue":"Transportation Research Part E Logistics and Transportation Review","work_id":"c96e83c1-7c94-45ce-bb09-d3647a54c823","year":2022},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":8,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:3cf1f14bbf8797597958e3f93ad02890d9a1ec2800ffc8758e6bd3eea50f94b4","observation_id":"bbc96841-aa35-42d7-a736-de586c699884","resolution":{"observed_at":"2026-06-28T18:22:27.113763Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2023.106261","doi":"10.1016/j.cor.2023.106261","metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Bruglieri, M","venue":"Computers & Operations Research","work_id":"a627c258-db84-4780-8b65-bf70f8be8d68","year":2023},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":9,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:ad191879fc6ba55f6f1976f9bb684bf2b8f66e9f9de842f49cb245d5613f2cbf","observation_id":"278c1213-d3d5-48a0-b5a1-b9442387764c","resolution":{"observed_at":"2026-06-28T18:22:27.130170Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2024.122976","doi":"10.1016/j.apenergy.2024.122976","metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Jahangir Samet, H","venue":"Applied Energy","work_id":"8cd4703c-564b-4644-a54d-47c3cb5c4935","year":2024},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":10,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:009b67f038ee5ea455c085631d8a73d83a35c2f81beac29e6a9c90648bcf279d","observation_id":"78e6ce6f-6bc7-441d-929d-359e0681b10b","resolution":{"observed_at":"2026-06-28T18:22:27.135706Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[{"edge_observation":{"observed_at":"2026-07-11T11:51:00.725631+00:00","source":"paper_reference_links","state":"open"},"event_date":"2024-04-23","event_type":"correction","notice_doi":"10.1016/j.apenergy.2024.123287","provenance":{"observed_at":"2026-07-11T03:12:34.047324+00:00","source":"crossref","source_record_id":"10.1016/j.apenergy.2024.123287->10.1016/j.apenergy.2024.122976:correction"}}],"reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T18:17:07.763765Z","title":"Alexeenko, C","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":11,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:721caa3f74235f79b92caa1c8ed03e849726dcea56e84c00a854a14ff51b8c01","observation_id":"edf4f0ae-b075-46f3-b180-78867dfe3794","resolution":{"observed_at":"2026-06-28T18:17:07.763765Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2024.123407","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T18:22:27.124747Z","title":"Wang et al., ‘Robust routing for a mixed fleet of heavy- duty trucks with pickup and delivery under energy consumption uncertainty’, Appl Energy, vol","venue":null,"work_id":"db512897-f91e-4259-ba25-605aa9f9a101","year":2024},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":12,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:c37e8d684af8eea5a3b6aff87c0b3b0e20dfdf7fbccea7f7b26ff7f93cc8ac88","observation_id":"e27b9043-aff5-4e75-8900-5a0fe37364cf","resolution":{"observed_at":"2026-06-28T18:22:27.126442Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/j.tre.2011.08.001","metadata_source":"openalex","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"A Green Vehicle Routing Problem","venue":"Transportation Research Part E Logistics and Transportation Review","work_id":"9387ce56-2da7-41ae-a555-be1572dc1301","year":2012},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":14,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:92b88a77e95a70fb62da1b981224e68905d63a4caccb940c75924a4f2ddaba13","observation_id":"1649e6b4-c1a0-44f1-ad65-fe9ffe8501b4","resolution":{"observed_at":"2026-06-28T18:22:27.117718Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2023.109108","doi":"10.1016/j.cie.2023.109108","metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Amiri, H","venue":"Computers & Industrial Engineering","work_id":"4994af35-14c9-4992-9e73-21c4ce2ce82f","year":2023},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":15,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:4b69cb3dd3e7962ac637fc2e77291fa415b0d346611b26b2e1e451880bd45903","observation_id":"2a5bb313-f51c-4a03-9dce-755e63ff051d","resolution":{"observed_at":"2026-06-28T18:22:27.120491Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2023.138184","doi":"10.1016/j.jclepro.2023.138184","metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":null,"venue":"Journal of Cleaner Production","work_id":"651fa856-dd08-4bb9-bcc4-d63334b0a937","year":2023},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":16,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:eec9221fdcbe315818051b3e35c5fc4aeb2c345a5ffa0666096864d3d31e0b72","observation_id":"49b22033-e526-4519-b9fe-52e61ddf885c","resolution":{"observed_at":"2026-06-28T18:22:27.120886Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T18:17:07.763765Z","title":"Accessed: Oct","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":17,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:08ec955b8c4f0b6f6ced0786eb6fab03f7464b776931438b5876c83b2744b421","observation_id":"76c8326a-edcb-4a61-9447-26fe18cc4ead","resolution":{"observed_at":"2026-06-28T18:17:07.763765Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/j.trd.2016.03.017","metadata_source":"openalex","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Asamer, A","venue":"Transportation Research Part D Transport and Environment","work_id":"b7a292ae-fdc6-42d5-a4ab-b7da8bdd1a4e","year":2016},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":18,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:71d14ac8f5c18ae27ae219a2360167cc0a053d4b9ff723a48e7a6be6f358e62f","observation_id":"342002de-8b82-4040-9af0-d543fc112303","resolution":{"observed_at":"2026-06-28T18:22:27.091131Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.4271/2007-01-0302","metadata_source":"openalex","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":null,"venue":"SAE technical papers on CD-ROM/SAE technical paper series","work_id":"58985485-6a88-4892-960a-e4b983bfccbf","year":2007},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":19,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:c8ef65de265d25fbeaf5aa2b03acd221e9615ec52d731351ef0dbad9d9aebf18","observation_id":"8f8dfd41-cc59-4515-ad1b-e5dcd1580ea4","resolution":{"observed_at":"2026-06-28T18:22:27.112602Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T18:17:07.763765Z","title":"Prohaska, A","venue":null,"work_id":null,"year":2015},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":20,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:70fa1c33ae4a270f57367812ba63806b1607278fda03b02594c7505585b71a20","observation_id":"610d7822-7d7c-4b0d-b345-5547bfcb73bb","resolution":{"observed_at":"2026-06-28T18:17:07.763765Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T18:17:07.763765Z","title":"Accessed: Oct","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":21,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:fd2fd7add954c31833c60c518760fe9212bb5e363fe32651b204402ae63dbe47","observation_id":"ce145289-32fc-4723-a6f7-a3064c90531c","resolution":{"observed_at":"2026-06-28T18:17:07.763765Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1007/s10732-018-9377-x","metadata_source":"openalex","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Santini, S","venue":"Journal of Heuristics","work_id":"5be053eb-335b-4fe7-a40a-a902934d9bbf","year":2018},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":22,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:f13aa052e9f94c234995dd11efdd70b8517f5acc0150ea9abe2153ed48cc2f55","observation_id":"b2857652-4a84-49d6-a202-69b1ea0e3c87","resolution":{"observed_at":"2026-06-28T18:22:27.108109Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":{"arxiv_id":"2303.04147","last_updated":"2023-03-01T14:20:45Z","snapshot_observed_at":"2026-08-09T11:49:16.608328Z","submitted_at":"2023-03-01T14:20:45Z","title":"Heuristics for Vehicle Routing Problem: A Survey and Recent Advances","version":1},"cited_work":{"arxiv_id":"2303.04147","doi":null,"metadata_source":"arxiv_reference","pith_arxiv_id":"2303.04147","snapshot_observed_at":"2026-07-01T20:36:12.169178Z","title":"Heuristics for vehicle routing problem: A survey and recent advances","venue":null,"work_id":"6e662698-5bbe-436c-8d3d-5fde1dd7b546","year":2023},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":23,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"cited_paper":"/paper/2303.04147","citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:06ce8605c2e76260100a3b0836b11bb6f02a1943fded76025029de91c7e42a88","observation_id":"9f113b06-f2e0-4327-86f5-1ef1456e62a9","resolution":{"observed_at":"2026-07-01T20:36:12.171246Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"1050.0135","doi":"10.1287/trsc.1050.0135","metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"[Sha98] Paul Shaw","venue":"Transportation Science","work_id":"416e252c-9c93-4a90-977c-c7f8d14c6e85","year":2006},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":24,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:b4a0331d63fa3cba71e71162dd45776e53b0bc77af8cdaae19fecc9d7300406c","observation_id":"f1988b55-a03a-4791-b364-25f0373dacaf","resolution":{"observed_at":"2026-06-28T18:22:27.126343Z","resolver_source":"arxiv_id","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/j.trb.2019.06.006","metadata_source":"openalex","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Pelletier, O","venue":"Transportation Research Part B Methodological","work_id":"8f1cb45b-5102-444d-9744-999ee53c48cc","year":2019},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":25,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:aa52c9e1932b91a913d781a64a91344dfc437cbf3b045f8a0656f5ead19ba146","observation_id":"96eb4d7b-f047-47c2-a83a-1e0a9a2e83b8","resolution":{"observed_at":"2026-06-28T18:22:27.102525Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T18:17:07.763765Z","title":"Accessed: Oct","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":26,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:9c0d3586fd7040195f94cbfca287b2ed6fbe6df014534b3da6c1ec3d24fda59b","observation_id":"a9096171-cd82-4d28-8b96-ff22dbb30348","resolution":{"observed_at":"2026-06-28T18:17:07.763765Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T18:17:07.763765Z","title":"Available: https://opendata.atlantaregional.com/datasets/c3c35b3e33db 4c98af32eae207748621_0/explore?location=33.979534%2C -84.340230%2C10.00","venue":null,"work_id":null,"year":null},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":27,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:15d9263af2a64074d92b9253ddc86536aaee6df6d5616b46bd7fbd582e8552fc","observation_id":"f1fcd1c1-f0b5-4aca-b452-14e039b662e6","resolution":{"observed_at":"2026-06-28T18:17:07.763765Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T18:17:07.763765Z","title":"Energy Information Administration (EIA)’","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":28,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:c4c7bba38d8cf61ef106007da52c5d5d019688e36fabc8f02167eddc80384e28","observation_id":"e06126dd-9152-4737-966b-03e122077667","resolution":{"observed_at":"2026-06-28T18:17:07.763765Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T18:17:07.763765Z","title":null,"venue":null,"work_id":null,"year":2021},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":29,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:735e18fd00a791688a89eb5df2bb19d29d6016c64e79391b656531d92255f6b6","observation_id":"6d3bd291-9984-4766-9a9e-3ef58f65430e","resolution":{"observed_at":"2026-06-28T18:17:07.763765Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T18:17:07.763765Z","title":"2022– 2023, 2020, [Online]","venue":null,"work_id":null,"year":2022},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":30,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:f0ee3707ee47ed131eb39fef2dfcb9f2b9344c14c9625e3706834a4dae2d9ff8","observation_id":"34a96a16-0caa-4cb8-9c30-ebd31ae0ff93","resolution":{"observed_at":"2026-06-28T18:17:07.763765Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":"2024.104119","doi":"10.1016/j.ijplas.2024.104119","metadata_source":"arxiv_reference","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":"Leoni, B","venue":"International Journal of Plasticity","work_id":"462fce7b-0b8c-4336-a564-03321c24926d","year":2024},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":31,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:bcae5d8c3227f40882485da42f04c69721e0fdcb6a9116596bca015731d5e1c1","observation_id":"c0b09b10-388f-4082-b2c7-36516496e054","resolution":{"observed_at":"2026-06-28T18:22:27.129524Z","resolver_source":"arxiv_id","status":"metadata_mismatch"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T18:17:07.763765Z","title":"Accessed: Oct","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":32,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:03fdf5bd335cd795196cd245b794094135246a7a030c832486be0b089e324738","observation_id":"239c4f64-1744-446f-967d-8a478fdaad44","resolution":{"observed_at":"2026-06-28T18:17:07.763765Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":null,"metadata_source":null,"pith_arxiv_id":null,"snapshot_observed_at":"2026-06-28T18:17:07.763765Z","title":"Accessed: Oct","venue":null,"work_id":null,"year":2024},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":33,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:18a18a41a07ef71c007075ab7226865d514f45709f2dc5aa0bad1ddbb931a48c","observation_id":"0b0c9b0d-36f6-4242-963e-fe8e2e5b39e1","resolution":{"observed_at":"2026-06-28T18:17:07.763765Z","resolver_source":null,"status":"unresolved"},"standing_notice":{"events":[],"reason":"canonical_work_link_unavailable","source_receipts":[],"state":"unavailable"}},{"citation":{"cited_paper":null,"cited_work":{"arxiv_id":null,"doi":"10.1016/j.egyr.2023.08.069","metadata_source":"openalex","pith_arxiv_id":null,"snapshot_observed_at":"2026-08-05T02:28:24.338817Z","title":null,"venue":"Energy Reports","work_id":"7ef5d139-4f52-44ff-8093-97e9958f5598","year":2023},"citing_paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses","version":1},"reference_index":34,"source":"pdf_text","source_observed_at":"2026-06-28T18:17:07.763765Z"},"links":{"citing_paper":"/paper/2606.00792"},"observation_digest":"sha256:e0feb19958b8e998d77468b337a985c11243d38be10866595b2d46624216d9aa","observation_id":"2733f96b-95ad-487e-b53b-343a71013da8","resolution":{"observed_at":"2026-06-28T18:22:27.100213Z","resolver_source":"doi","status":"verified_exact"},"standing_notice":{"events":[],"observation":"No event found in the named queried sources as of 2026-08-10T06:31:04.303077+00:00.","reason":null,"source_receipts":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"state":"measured"}}],"paper":{"arxiv_id":"2606.00792","last_updated":"2026-05-30T16:14:23Z","latest_version":1,"primary_category":"math.OC","snapshot_observed_at":"2026-08-09T12:01:05.190915Z","submitted_at":"2026-05-30T16:14:23Z","title":"Coupled Routing and Charge Schedule Optimization of Electrified Delivery Truck Fleets: Feasibility Analyses"},"reference_resolution":{"displayed":32,"state_counts":{"malformed_identifier":0,"metadata_mismatch":2,"parse_uncertain":0,"unresolved":12,"verified_exact":18,"verified_fuzzy":0},"total_outbound_references":32},"refusal":"A citation records a reference. It does not transfer a finding from one paper to another.","schema":"pith.paper-citation-record.v1","standing_sources":[{"observed_at":"2026-08-10T06:31:04.303077+00:00","source":"crossref"},{"observed_at":"2026-08-10T06:30:57.382061+00:00","source":"retraction_watch"}],"thesis":"As of 10 August 2026, this Paper Citation Record lists 32 of 32 outbound references and 0 inbound Pith citation observations for arXiv:2606.00792."}