{"state_type":"pith_open_graph_state","state_version":"1.0","pith_number":"pith:2026:UFSMAPYYUJMVAI55S2LTJOKZHO","merge_version":"pith-open-graph-merge-v1","event_count":2,"valid_event_count":2,"invalid_event_count":0,"equivocation_count":0,"current":{"canonical_record":{"metadata":{"abstract_canon_sha256":"b51215e087440c0f6404feef11619c8ae63b7dbc9c2d6fe0daed1e3e65503ec5","cross_cats_sorted":[],"license":"http://creativecommons.org/licenses/by-nc-nd/4.0/","primary_cat":"cs.NI","submitted_at":"2026-05-01T11:09:48Z","title_canon_sha256":"1fc1a7d116a81b7bb1b98a0e7ddacd6e09d86d791b3d1a16ad599671df5e1e28"},"schema_version":"1.0","source":{"id":"2605.00570","kind":"arxiv","version":2}},"source_aliases":[{"alias_kind":"arxiv","alias_value":"2605.00570","created_at":"2026-06-23T03:13:57Z"},{"alias_kind":"arxiv_version","alias_value":"2605.00570v2","created_at":"2026-06-23T03:13:57Z"},{"alias_kind":"doi","alias_value":"10.48550/arxiv.2605.00570","created_at":"2026-06-23T03:13:57Z"},{"alias_kind":"pith_short_12","alias_value":"UFSMAPYYUJMV","created_at":"2026-06-23T03:13:57Z"},{"alias_kind":"pith_short_16","alias_value":"UFSMAPYYUJMVAI55","created_at":"2026-06-23T03:13:57Z"},{"alias_kind":"pith_short_8","alias_value":"UFSMAPYY","created_at":"2026-06-23T03:13:57Z"}],"graph_snapshots":[{"event_id":"sha256:fcd0a8baba7461cc60d75781e3ff2bbc3d82ac5ea55edaff4d3de2c60b83adb7","target":"graph","created_at":"2026-06-23T03:13:57Z","signer":{"key_id":"pith-v1-2026-05","public_key_fingerprint":"8d4b5ee74e4693bcd1df2446408b0d54","signer_id":"pith.science","signer_type":"pith_registry"},"payload":{"graph_snapshot":{"author_claims":{"count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57","strong_count":0},"builder_version":"pith-number-builder-2026-05-17-v1","claims":{"count":4,"items":[{"attestation":"unclaimed","claim_id":"C1","kind":"strongest_claim","source":"verdict.strongest_claim","status":"machine_extracted","text":"An industrial video inspection case study on a real B5G system, complemented by large-scale simulation, illustrates that such coordination can improve service continuity, reduce disruptive rejections, and increase workflow completion under heavy load."},{"attestation":"unclaimed","claim_id":"C2","kind":"weakest_assumption","source":"verdict.weakest_assumption","status":"machine_extracted","text":"That networks can accurately expose sustainable QoS profiles within a bounded planning window and that industrial workflows can be mapped to these profiles without introducing significant prediction errors or coordination overhead."},{"attestation":"unclaimed","claim_id":"C3","kind":"one_line_summary","source":"verdict.one_line_summary","status":"machine_extracted","text":"A capability-aware coordination framework for industrial workflows in B5G/6G networks improves service continuity and completion by having networks disclose sustainable QoS profiles for forward-looking demand planning."},{"attestation":"unclaimed","claim_id":"C4","kind":"headline","source":"verdict.pith_extraction.headline","status":"machine_extracted","text":"A coordination framework lets B5G/6G networks expose sustainable QoS profiles so industrial workflows can map phases and submit demand trajectories for joint planning."}],"snapshot_sha256":"0f12be5ead92db120b22e82bf302f1bfcfc10767d0a497bc44b3914e63204e07"},"formal_canon":{"evidence_count":0,"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"integrity":{"available":true,"clean":true,"detectors_run":[{"findings_count":0,"name":"ai_meta_artifact","ran_at":"2026-05-20T19:39:33.689866Z","status":"completed","version":"1.0.0"},{"findings_count":0,"name":"doi_compliance","ran_at":"2026-05-19T18:02:42.842512Z","status":"completed","version":"1.0.0"}],"endpoint":"/pith/2605.00570/integrity.json","findings":[],"snapshot_sha256":"0f1536fe1d30ab45a46eea969a2c57509b5c2065fead256cd6478c826083616b","summary":{"advisory":0,"by_detector":{},"critical":0,"informational":0}},"paper":{"abstract_excerpt":"Beyond-5G (B5G) and 6G networks are expected to enable more complex industrial services, which often operate according to multi-phase workflows with phase-specific communication requirements. However, current interaction between applications and networks remains predominantly request-driven: Quality of Service (QoS) is requested at each workflow phase transition and evaluated independently, without explicit consideration of upcoming demand or network's near-term capability. This mismatch limits the ability of both sides to plan ahead, often resulting in foreseeable incompatibilities, even serv","authors_text":"Bjoern Riemer, Hao Yu, Hemant Zope, Qize Guo, Tarik Taleb, Yan Chen","cross_cats":[],"headline":"A coordination framework lets B5G/6G networks expose sustainable QoS profiles so industrial workflows can map phases and submit demand trajectories for joint planning.","license":"http://creativecommons.org/licenses/by-nc-nd/4.0/","primary_cat":"cs.NI","submitted_at":"2026-05-01T11:09:48Z","title":"Beyond Per-Request QoS: Coordinating Industrial Workflows with B5G/6G Network Capabilities"},"references":{"count":0,"internal_anchors":0,"resolved_work":0,"sample":[],"snapshot_sha256":"258153158e38e3291e3d48162225fcdb2d5a3ed65a07baac614ab91432fd4f57"},"source":{"id":"2605.00570","kind":"arxiv","version":2},"verdict":{"created_at":"2026-05-09T18:43:47.631231Z","id":"6800ea24-f466-4210-bfc8-91c665c2cb64","model_set":{"reader":"grok-4.3"},"one_line_summary":"A capability-aware coordination framework for industrial workflows in B5G/6G networks improves service continuity and completion by having networks disclose sustainable QoS profiles for forward-looking demand planning.","pipeline_version":"pith-pipeline@v0.9.0","pith_extraction_headline":"A coordination framework lets B5G/6G networks expose sustainable QoS profiles so industrial workflows can map phases and submit demand trajectories for joint planning.","strongest_claim":"An industrial video inspection case study on a real B5G system, complemented by large-scale simulation, illustrates that such coordination can improve service continuity, reduce disruptive rejections, and increase workflow completion under heavy load.","weakest_assumption":"That networks can accurately expose sustainable QoS profiles within a bounded planning window and that industrial workflows can be mapped to these profiles without introducing significant prediction errors or coordination overhead."}},"verdict_id":"6800ea24-f466-4210-bfc8-91c665c2cb64"}}],"author_attestations":[],"timestamp_anchors":[],"storage_attestations":[],"citation_signatures":[],"replication_records":[],"corrections":[],"mirror_hints":[],"record_created":{"event_id":"sha256:748c7e41d310a72686c13cded02c57402f31e2c541b2f939689b5d17353be3d9","target":"record","created_at":"2026-06-23T03:13:57Z","signer":{"key_id":"pith-v1-2026-05","public_key_fingerprint":"8d4b5ee74e4693bcd1df2446408b0d54","signer_id":"pith.science","signer_type":"pith_registry"},"payload":{"attestation_state":"computed","canonical_record":{"metadata":{"abstract_canon_sha256":"b51215e087440c0f6404feef11619c8ae63b7dbc9c2d6fe0daed1e3e65503ec5","cross_cats_sorted":[],"license":"http://creativecommons.org/licenses/by-nc-nd/4.0/","primary_cat":"cs.NI","submitted_at":"2026-05-01T11:09:48Z","title_canon_sha256":"1fc1a7d116a81b7bb1b98a0e7ddacd6e09d86d791b3d1a16ad599671df5e1e28"},"schema_version":"1.0","source":{"id":"2605.00570","kind":"arxiv","version":2}},"canonical_sha256":"a164c03f18a2595023bd969734b9593b9c3f4828b6f0a82bf624566101d8f709","receipt":{"algorithm":"ed25519","builder_version":"pith-number-builder-2026-05-17-v1","canonical_sha256":"a164c03f18a2595023bd969734b9593b9c3f4828b6f0a82bf624566101d8f709","first_computed_at":"2026-06-23T03:13:57.506723Z","key_id":"pith-v1-2026-05","kind":"pith_receipt","last_reissued_at":"2026-06-23T03:13:57.506723Z","public_key_fingerprint":"8d4b5ee74e4693bcd1df2446408b0d54","receipt_version":"0.3","signature_b64":"vPSCXt9Fhwolx86LQltirBlaOGO9FiikwU/woi+VOsAeJKio8+OP+HsXb0Cp1EYoxiOZxVKwQ1yARjgZuU2qBg==","signature_status":"signed_v1","signed_at":"2026-06-23T03:13:57.507073Z","signed_message":"canonical_sha256_bytes"},"source_id":"2605.00570","source_kind":"arxiv","source_version":2}}},"equivocations":[],"invalid_events":[],"applied_event_ids":["sha256:748c7e41d310a72686c13cded02c57402f31e2c541b2f939689b5d17353be3d9","sha256:fcd0a8baba7461cc60d75781e3ff2bbc3d82ac5ea55edaff4d3de2c60b83adb7"],"state_sha256":"f243e15b5d192637b9230f8216f90367bb57cac8c3dd7aedf406106db0aeb917"}