REVIEW 2 cited by
Interim Design Report
Not yet reviewed by Pith; the record is open.
This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.
SPECIMEN: schema-true, not a live event
T0 review · schema-true
One-sentence machine reading of the paper's core claim.
pith:XXXXXXXX · record.json · timestamp
read the original abstract
The International Design Study for the Neutrino Factory (the IDS-NF) was established by the community at the ninth "International Workshop on Neutrino Factories, super-beams, and beta- beams" which was held in Okayama in August 2007. The IDS-NF mandate is to deliver the Reference Design Report (RDR) for the facility on the timescale of 2012/13. In addition, the mandate for the study [3] requires an Interim Design Report to be delivered midway through the project as a step on the way to the RDR. This document, the IDR, has two functions: it marks the point in the IDS-NF at which the emphasis turns to the engineering studies required to deliver the RDR and it documents baseline concepts for the accelerator complex, the neutrino detectors, and the instrumentation systems. The IDS-NF is, in essence, a site-independent study. Example sites, CERN, FNAL, and RAL, have been identified to allow site-specific issues to be addressed in the cost analysis that will be presented in the RDR. The choice of example sites should not be interpreted as implying a preferred choice of site for the facility.
Forward citations
Cited by 2 Pith papers
-
The Neutrino Slice at Muon Colliders
Beam-induced neutrinos at a muon collider would yield around 10^11 interactions per year in the main detector, enabling precision electroweak and neutrino measurements.
-
On T-Invariance Violation in Neutrino Oscillations and Matter Effects
Matter-induced T-invariance violation in neutrino oscillations requires an asymmetric matter potential along the neutrino path, and for Earth-bound experiments the effect is numerically tiny.
Discussion (0). Continue with ORCID to comment.