Pith. sign in

REVIEW 1 cited by

MANTA: A Negative-Triangularity NASEM-Compliant Fusion Pilot Plant

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2405.20243 v1 pith:54K6XIAP submitted 2024-05-30 physics.plasm-ph

classification physics.plasm-ph
keywords fusionmantacoilcostfieldhighplantpower
verification ladder T0 review T1 audit T2 compute T3 formal
0 comments
abstract

The MANTA (Modular Adjustable Negative Triangularity ARC-class) design study investigated how negative-triangularity (NT) may be leveraged in a compact, fusion pilot plant (FPP) to take a ``power-handling first" approach. The result is a pulsed, radiative, ELM-free tokamak that satisfies and exceeds the FPP requirements described in the 2021 National Academies of Sciences, Engineering, and Medicine report ``Bringing Fusion to the U.S. Grid". A self-consistent integrated modeling workflow predicts a fusion power of 450 MW and a plasma gain of 11.5 with only 23.5 MW of power to the scrape-off layer (SOL). This low $P_\text{SOL}$ together with impurity seeding and high density at the separatrix results in a peak heat flux of just 2.8 MW/m$^{2}$. MANTA's high aspect ratio provides space for a large central solenoid (CS), resulting in ${\sim}$15 minute inductive pulses. In spite of the high B fields on the CS and the other REBCO-based magnets, the electromagnetic stresses remain below structural and critical current density limits. Iterative optimization of neutron shielding and tritium breeding blanket yield tritium self-sufficiency with a breeding ratio of 1.15, a blanket power multiplication factor of 1.11, toroidal field coil lifetimes of $3100 \pm 400$ MW-yr, and poloidal field coil lifetimes of at least $890 \pm 40$ MW-yr. Following balance of plant modeling, MANTA is projected to generate 90 MW of net electricity at an electricity gain factor of ${\sim}2.4$. Systems-level economic analysis estimates an overnight cost of US\$3.4 billion, meeting the NASEM FPP requirement that this first-of-a-kind be less than US\$5 billion. The toroidal field coil cost and replacement time are the most critical upfront and lifetime cost drivers, respectively.

Discussion (0). Continue with ORCID to comment.

Forward citations

Cited by 1 Pith paper

Reviewed papers in the Pith corpus that reference this work. Sorted by Pith novelty score. Full citation record

  1. Impact of model uncertainty on SPARC operating scenario predictions with empirical modeling

    physics.plasm-ph 2025-06 conditional novelty 6.0 of 10

    Accounting for uncertainties in empirical scaling laws, plasma profiles, and impurities shifts the predicted optimal SPARC operating point away from the deterministic POPCON optimum.

Pith tools