Pith. sign in

Paper Citation Record · LEDGER

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem

As of 11 August 2026, this Paper Citation Record lists 63 of 63 outbound references and 0 inbound Pith citation observations for arXiv:2502.00018.

A citation records a reference. It does not transfer a finding from one paper to another.

pith.paper-citation-record.v1
2502.00018 v1

Coverage vector

measured 63 of 63 reference resolution

Typed states for the displayed outbound observations.

Source: paper_references, paper_reference_links, observed 2026-08-10T21:04:13.804824Z

measured 63 of 63 standing notices

One-hop event checks from named stored sources.

Source: scholarly_work_events, retraction_status_cache, observed 2026-08-11T06:34:44.6726+00:00

measured 0 of 0 inbound itemization

Pith citing papers itemized under the disclosed page cap.

Source: paper_references, paper_reference_links

measured 0 of 1 external citation measurements

A source-named dated measurement, never combined with another source.

Source: cited_works

Reference resolution

63 of 63 outbound references displayed

  • verified exact1
  • verified fuzzy47
  • unresolved14
  • parse uncertain0
  • malformed identifier1
  • metadata mismatch0

External citation measurements

No source-named external measurement is stored.

Outbound references

Observation f91e9a5a-8dbe-4816-a434-feaf2a1f5383 · outbound

This paper cites A novel mathematical model for the flexible job-shop scheduling problem with limited automated guided vehicles,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem A novel mathematical model for the flexible job-shop scheduling problem with limited automated guided vehicles,

Reference 1

Resolution
malformed identifier
doi_truncated, observed 2026-08-10T21:04:15.479407Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:11.153355Z digest=sha256:e035ef3df7ebee7c0f053f5b6c19a7fccf8122658b59a46f3b55816739cf3d06

Observation 887cc61c-c6e6-4239-80f2-7dbe62a18acb · outbound

This paper cites Knowledge-based lot-splitting optimization method for flexible job shops considering energy consumption,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Knowledge-based lot-splitting optimization method for flexible job shops considering energy consumption,

Reference 2

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:22.904902Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:11.204759Z digest=sha256:58a66a5fe500dd4b27da3fea7933a6cc1a78720c185c9598b02217c24c360666

Observation 57d5d924-3e91-4d42-9ab3-38d50f507b3a · outbound

This paper cites Multitask multiobjective genetic programming for automated scheduling heuristic learning in dy- namic flexible job-shop scheduling,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Multitask multiobjective genetic programming for automated scheduling heuristic learning in dy- namic flexible job-shop scheduling,

Reference 3

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:22.704748Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:11.254758Z digest=sha256:2de9ae4a05d568739f48713bc2f70877a4b98ef375a729190130a121a4ecc19d

Observation f5864ad8-b8b1-48d5-8b9a-583c10b1514b · outbound

This paper cites Multiobjec- tive optimization of energy-efficient job-shop scheduling with dynamic reference point-based fuzzy relative entropy,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Multiobjec- tive optimization of energy-efficient job-shop scheduling with dynamic reference point-based fuzzy relative entropy,

Reference 4

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:22.555635Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:11.294752Z digest=sha256:425c63daeca7be3faa9f55dbfa01273cd97979655885228f592e7a73d6501dce

Observation 79504d18-5ab9-4496-bcaf-fe26109713d3 · outbound

This paper cites Huang, S.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Huang, S

Reference 5

Resolution
unresolved
no resolver link, observed 2026-08-10T21:04:11.344751Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-10T21:04:11.344751Z digest=sha256:547034f1fe8f62ac7e5bc9576734e4ab3191d761c0b326438715fb3d96664ab8

Observation ed8c5a67-3a3c-4847-95a7-ee4f212ee1cd · outbound

This paper cites Self-adaptive multi-objective evolutionary algorithm for flexible job shop scheduling with fuzzy processing time,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Self-adaptive multi-objective evolutionary algorithm for flexible job shop scheduling with fuzzy processing time,

Reference 6

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:22.431700Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:11.387948Z digest=sha256:d91b9635042fc1a03c5adfaebc3ab8753f87d1fb8cd3593c10d9cce258719be0

Observation 0aeb4aa1-0ab5-47a4-9f24-3a2febb28cc2 · outbound

This paper cites Bi-population balancing multi-objective algorithm for fuzzy flexible job shop with energy and transportation,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Bi-population balancing multi-objective algorithm for fuzzy flexible job shop with energy and transportation,

Reference 7

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:22.304748Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:11.434752Z digest=sha256:4899bdce2d3ddaa98728a880992518dc52000061e5a3d3f1b1c57224dddf51a5

Observation a6044fce-3a84-4c75-835a-aca6b3a00bc2 · outbound

This paper cites A decomposition-based evolutionary algorithm with clustering and hierarchical estimation for multi-objective fuzzy flexible jobshop scheduling,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem A decomposition-based evolutionary algorithm with clustering and hierarchical estimation for multi-objective fuzzy flexible jobshop scheduling,

Reference 8

Resolution
unresolved
no resolver link, observed 2026-08-10T21:04:11.485834Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-10T21:04:11.485834Z digest=sha256:d5ce25a8e9a82701d32e108a325123d96dd7c523ba57ec6d31c9a9ba4fe06bcb

Observation fb26933f-9952-4aab-aaeb-5788d01f992c · outbound

This paper cites Solving fuzzy job-shop schedul- ing problem using DE algorithm improved by a selection mechanism,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Solving fuzzy job-shop schedul- ing problem using DE algorithm improved by a selection mechanism,

Reference 9

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:22.159794Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:11.544763Z digest=sha256:3cd270412ed831a25121b21f7a073dd2fad718df1f64924c3f139187191c685b

Observation c8d3ddff-3ddc-4366-a882-9afa82a2270f · outbound

This paper cites Improved artificial immune system algorithm for type-2 fuzzy flexible job shop scheduling problem,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Improved artificial immune system algorithm for type-2 fuzzy flexible job shop scheduling problem,

Reference 10

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:22.035869Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:11.594756Z digest=sha256:178c7ae47c001f4e62ce11c954fd7538feae7ff1570704efcb0b47472450c761

Observation 87a35022-20b1-48e7-a995-83d5770192ec · outbound

This paper cites A hybrid cooperative coevolution algorithm for fuzzy flexible job shop scheduling,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem A hybrid cooperative coevolution algorithm for fuzzy flexible job shop scheduling,

Reference 11

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:21.874747Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:11.644752Z digest=sha256:5d63de0c9afa77b84cfa894d8a9a5199a11f0bf92b0cbe8aae75029f7c550d98

Observation 7c2aadac-a64b-4aa2-81f6-2ed30854acfa · outbound

This paper cites Solving multiobjective fuzzy job-shop scheduling problem by a hybrid adaptive differential evolution algorithm,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Solving multiobjective fuzzy job-shop scheduling problem by a hybrid adaptive differential evolution algorithm,

Reference 12

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:21.714940Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:11.694754Z digest=sha256:394386783cd3cd079124a38a54c8d0330b44e63ee8311df7b3b4c3f2fe503f83

Observation 21030524-1f03-4380-9655-ac9a25e3a256 · outbound

This paper cites A bi-population evolutionary algorithm with feedback for energy-efficient fuzzy flexible job shop scheduling,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem A bi-population evolutionary algorithm with feedback for energy-efficient fuzzy flexible job shop scheduling,

Reference 13

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:21.516542Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:11.754755Z digest=sha256:9926a5a71d5c9d64effa507e58a778443650e903cbf2b746c37d33f3022435dd

Observation eb2a1514-6d7e-4ab9-a6ea-884f1e1873e5 · outbound

This paper cites A learning-based memetic algorithm for energy-efficient flexible job-shop scheduling with type-2 fuzzy processing time,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem A learning-based memetic algorithm for energy-efficient flexible job-shop scheduling with type-2 fuzzy processing time,

Reference 14

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:21.354751Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:11.814753Z digest=sha256:9e11b960fd804b4a6b41982ff401cf3eee8778000a394babdbfd516e0e9f0013

Observation c2d6ead1-3bed-4e46-8598-abc2f51c0284 · outbound

This paper cites A hyperheuristic with Q-learning for the multiobjective energy-efficient distributed blocking flow shop scheduling problem,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem A hyperheuristic with Q-learning for the multiobjective energy-efficient distributed blocking flow shop scheduling problem,

Reference 15

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:21.174755Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:11.864756Z digest=sha256:6675ef3be1bcb9425f3a6c1bc9c44f729294be4e68ce8f1436db1f4a14f8e242

Observation ad18810b-e822-4828-9d25-3190c7e4c1e4 · outbound

This paper cites A reinforcement-learning-based 3-D estimation of distribution algorithm for fuzzy distributed hybrid flow- shop scheduling considering on-time-delivery,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem A reinforcement-learning-based 3-D estimation of distribution algorithm for fuzzy distributed hybrid flow- shop scheduling considering on-time-delivery,

Reference 16

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:21.004750Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:11.894763Z digest=sha256:b0f4fbedc1eee2826dbf9e64e082ac7d12d2be421d429e27fe289738a59c4057

Observation cce62992-1706-4560-972d-296631e0642f · outbound

This paper cites Co-evolution with deep reinforcement learning for energy-aware distributed heterogeneous flexible job shop scheduling,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Co-evolution with deep reinforcement learning for energy-aware distributed heterogeneous flexible job shop scheduling,

Reference 17

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:20.844749Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:11.934772Z digest=sha256:c1818158f2857263a7084ed790d188c28e60bc555e4fe61bdac47f0963da6741

Observation 99fc2dfe-5a9b-439d-91f5-69eee5c04c9f · outbound

This paper cites MQL-MM: A meta-Q-learning- based multi-objective metaheuristic for energy-efficient distributed fuzzy hybrid blocking flow-shop scheduling problem,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem MQL-MM: A meta-Q-learning- based multi-objective metaheuristic for energy-efficient distributed fuzzy hybrid blocking flow-shop scheduling problem,

Reference 18

Resolution
verified exact
doi, observed 2026-08-10T21:04:13.954753Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:11.984837Z digest=sha256:27f5dd58e6b7c5a97db52e707424f100cbe8fc1b44b42fb6e56776dce5b67929

Observation e501b1ba-8c43-40f3-b55b-7406f0a59327 · outbound

This paper cites A reinforcement learning driven cooperative meta-heuristic algorithm for energy-efficient distributed no- wait flow-shop scheduling with sequence-dependent setup time,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem A reinforcement learning driven cooperative meta-heuristic algorithm for energy-efficient distributed no- wait flow-shop scheduling with sequence-dependent setup time,

Reference 19

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:20.724849Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.044750Z digest=sha256:81d889ff320ed3b6bb91871a6112c26f769457f58472837cc61c1f7881291992

Observation 989c84de-7638-4c40-b547-07f2345fb317 · outbound

This paper cites A learning-based multipopulation evolutionary optimization for flexible job shop schedul- ing problem with finite transportation resources,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem A learning-based multipopulation evolutionary optimization for flexible job shop schedul- ing problem with finite transportation resources,

Reference 20

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:20.564817Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.079853Z digest=sha256:ab48fa8fb6afd2f3fdfc60dc41ac5e6cb6b1e0ae8d2f1a7351feeefc63c061b0

Observation 76f1ba88-b1c2-4633-9539-59f1b2a125a5 · outbound

This paper cites An improved artificial bee colony algorithm with q-learning for solving permutation flow-shop scheduling problems,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem An improved artificial bee colony algorithm with q-learning for solving permutation flow-shop scheduling problems,

Reference 21

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:20.434757Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.134905Z digest=sha256:1261864582344dd73c26da7322057a2996284321acf69e8041ab403372262817

Observation 32f79484-6216-4355-8841-2adbfa7967cd · outbound

This paper cites Learning-based grey wolf optimizer for stochastic flexible job shop scheduling,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Learning-based grey wolf optimizer for stochastic flexible job shop scheduling,

Reference 22

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:20.265516Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.184778Z digest=sha256:2ab6d2b05957f0fbbafd5b18abc7daecdcb5ddef45afe92d33bc1e22c312a1c3

Observation 8cb224ff-2e8f-4ca8-90f4-565c59403a41 · outbound

This paper cites Learning to dispatch for job shop scheduling via deep reinforcement learning,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Learning to dispatch for job shop scheduling via deep reinforcement learning,

Reference 23

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:20.160789Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.234854Z digest=sha256:8f71dc735bb616242931e520bb05bd93463a372c1df6c7c5c0d7aa8fc51095e9

Observation 5d46e2ce-ccab-4467-8ccd-6e644160d5b2 · outbound

This paper cites Fast approximations for job shop scheduling: A lagrangian dual deep learning method,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Fast approximations for job shop scheduling: A lagrangian dual deep learning method,

Reference 24

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:20.044750Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.262240Z digest=sha256:ec343656d4876a9998374370608b20fd8daa523c7f5a60b2ade09c6eadbad41b

Observation 46e9a2a0-1be3-4271-afb7-8d47a0d2440b · outbound

This paper cites Self-Labeling the Job Shop Scheduling Problem.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Self-Labeling the Job Shop Scheduling Problem

Reference 25

Resolution
unresolved
no resolver link, observed 2026-08-10T21:04:12.294862Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-10T21:04:12.294862Z digest=sha256:2c2ba94c2442df37e36cdd992a8aad6d50eb7a52b1f38635445f88df357660df

Observation 8a493c1e-a5ee-4027-99e4-48717e380b36 · outbound

This paper cites Flexible job shop scheduling via dual attention network-based reinforcement learning,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Flexible job shop scheduling via dual attention network-based reinforcement learning,

Reference 26

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:19.954750Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.339114Z digest=sha256:1264d84876a69c6948f82ad6ffaadbfe0f87adc1aa7d810a81943d2294a95f1e

Observation e29fa5f9-8f2d-4425-81ea-19ad5f8b2a25 · outbound

This paper cites Deep reinforcement learning based optimization algorithm for permutation flow-shop scheduling,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Deep reinforcement learning based optimization algorithm for permutation flow-shop scheduling,

Reference 27

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:19.905010Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.375131Z digest=sha256:0732418ac820ba704f6daf6d0a68812acbeaa41b86a1741820ca2660c06de962

Observation acba2006-54a4-4e8a-a03c-29cd08ece902 · outbound

This paper cites An end-to-end reinforcement learning approach for job-shop scheduling problems based on constraint programming,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem An end-to-end reinforcement learning approach for job-shop scheduling problems based on constraint programming,

Reference 28

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:19.771797Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.414752Z digest=sha256:a5e96c07b00212d479e9ed658de565eba9b2f196633083b49a584c99a6c053d2

Observation 9f126584-2846-423c-9a26-d19a7ef61db6 · outbound

This paper cites Flexible job-shop scheduling via graph neural network and deep reinforcement learning,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Flexible job-shop scheduling via graph neural network and deep reinforcement learning,

Reference 29

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:19.622683Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.464824Z digest=sha256:c4cbd8fe0ed4d9895addce053d0aa353796973143212454496d5e21ce3c1b2c7

Observation a9b2c037-8386-494b-9950-55720137ef79 · outbound

This paper cites Dynamic parallel machine scheduling with deep q-network,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Dynamic parallel machine scheduling with deep q-network,

Reference 30

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:19.520535Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.514753Z digest=sha256:47df93ece133914b2227b69bae2e64e7e0032bf53b096d3dba6f314c1569fad7

Observation 5758e1de-2eab-4588-93e5-bf2dfc7e47d0 · outbound

This paper cites A knowledge-guided end- to-end optimization framework based on reinforcement learning for flow shop scheduling,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem A knowledge-guided end- to-end optimization framework based on reinforcement learning for flow shop scheduling,

Reference 31

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:19.404759Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.554757Z digest=sha256:dc60671d1ec33fe4b088c7b4567ad2008ad5768e624c67f52a7a9b96ccbf6091

Observation 898fc448-7fb5-4f4b-b92e-9e2d15df090d · outbound

This paper cites A deep reinforcement learning framework based on an attention mechanism and disjunctive graph embedding for the job-shop scheduling problem,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem A deep reinforcement learning framework based on an attention mechanism and disjunctive graph embedding for the job-shop scheduling problem,

Reference 32

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:19.264809Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.589250Z digest=sha256:c468d59488235e060ec317931100abb28215e3ea486aabaeabd3fef3525de6e6

Observation 8810361c-38de-41bb-b8b6-84b92b77e8a0 · outbound

This paper cites A reinforcement learning approach for flexible job shop scheduling problem with crane transportation and setup times,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem A reinforcement learning approach for flexible job shop scheduling problem with crane transportation and setup times,

Reference 33

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:19.154767Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.628162Z digest=sha256:b8a90fd8c69f6cd124e60fd3ab279909ef72f9b2598c0de2a8335954425673e2

Observation 00881303-44cd-4c69-9040-5cb51d9c2fdc · outbound

This paper cites Large- scale dynamic scheduling for flexible job-shop with random arrivals of new jobs by hierarchical reinforcement learning,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Large- scale dynamic scheduling for flexible job-shop with random arrivals of new jobs by hierarchical reinforcement learning,

Reference 34

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:19.014752Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.664827Z digest=sha256:f292c0e4b92315ed57494f5a06925f8adc977b5f525e94db2ffb28b3aeb9cb33

Observation 42c1484e-7e3d-4bf5-b0ca-bb1e7a89472f · outbound

This paper cites Double dqn- based coevolution for green distributed heterogeneous hybrid flowshop scheduling with multiple priorities of jobs,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Double dqn- based coevolution for green distributed heterogeneous hybrid flowshop scheduling with multiple priorities of jobs,

Reference 35

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:18.784750Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.704751Z digest=sha256:9df24ed46bf423c176e06498ea45be1929c71e2f52770281e4eb326aeb60626b

Observation 3c6db507-7637-41b9-89ad-58f6ae6d1bbd · outbound

This paper cites Integrating ma- chine learning and mathematical optimization for job shop scheduling,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Integrating ma- chine learning and mathematical optimization for job shop scheduling,

Reference 36

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:18.634787Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.752487Z digest=sha256:11ef82a3c7ec2a614b7f29ae66aafef6cb8633275f85c85234418154a521ad49

Observation 17c591df-4426-41ea-87d4-6bf7b4fdd98b · outbound

This paper cites Dynamic job-shop scheduling problems using graph neural network and deep reinforcement learning,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Dynamic job-shop scheduling problems using graph neural network and deep reinforcement learning,

Reference 37

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:18.485624Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.784080Z digest=sha256:65b610b7469711679a3359bab0f363a3936aed720b50b59c3dde2326b87416c1

Observation 2e44037e-6e77-4172-b7bb-4e08aa87cc7f · outbound

This paper cites Real-time scheduling for dynamic partial- no-wait multiobjective flexible job shop by deep reinforcement learning,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Real-time scheduling for dynamic partial- no-wait multiobjective flexible job shop by deep reinforcement learning,

Reference 38

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:18.356595Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.824750Z digest=sha256:c17b8ef617ab6148f017c0644f0214c5b204c49be06bd0c5a0eda4d8b03cf57a

Observation 05f8e51b-7664-4f7f-b7fe-5c36988f8026 · outbound

This paper cites Optimal foraging algorithm that incorporates fuzzy relative entropy for solving many-objective permutation flow shop scheduling problems,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Optimal foraging algorithm that incorporates fuzzy relative entropy for solving many-objective permutation flow shop scheduling problems,

Reference 39

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:18.186889Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.844874Z digest=sha256:c03362e44725006b7e627631438d38ac1e4d47f9fa6de064032844555fbd2ed9

Observation 6fafa413-4e7d-4ab5-b8dc-2076c7d58cc1 · outbound

This paper cites Fuzzy job-shop scheduling based on ranking level (/spl lambda/, 1) interval-valued fuzzy numbers,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Fuzzy job-shop scheduling based on ranking level (/spl lambda/, 1) interval-valued fuzzy numbers,

Reference 40

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:18.037220Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.865675Z digest=sha256:d09742f02ba9c1073608bf4374c814f499851cb4e5e2a58b926e332596661c7b

Observation d32eb13b-7b70-4f52-a05b-e6f3a9456ca5 · outbound

This paper cites Jobshop scheduling with imprecise durations: a fuzzy approach,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Jobshop scheduling with imprecise durations: a fuzzy approach,

Reference 41

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:17.900328Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.878682Z digest=sha256:c3b8174d7dd07fff5363807833b028648a66b83381846e7def6d1a347f17c03d

Observation 77659631-811a-4812-b0cb-8fb67fd7b965 · outbound

This paper cites an unresolved cited work.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Unresolved cited work

Reference 42

Resolution
unresolved
raw_fallback, observed 2026-08-10T21:04:17.804951Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.883094Z digest=sha256:9855047c1058d0f44fd8a6f830a00c8616f8f8ceff80abd2612b54c10bdbe49c

Observation 437a7d3e-479d-4a15-be25-c280b6c7c21a · outbound

This paper cites Fuzzy job shop scheduling problem with availability con- straints,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Fuzzy job shop scheduling problem with availability con- straints,

Reference 43

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:17.624753Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.891775Z digest=sha256:09df3756e4465a730ea60f80bce1cec2d115d04c7fc1ec1f769a3c8152fad285

Observation 803b90bb-ae53-4780-9484-4fe8d7f1522a · outbound

This paper cites An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedate,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem An efficient genetic algorithm for job-shop scheduling problems with fuzzy processing time and fuzzy duedate,

Reference 44

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:17.474851Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.954754Z digest=sha256:e9ab96f07dd5ac06d2a07abd439002838cdf4cddcb16376e278f85fbbe40cc82

Observation 795c6a95-ac20-4e77-bdd9-a39f42851354 · outbound

This paper cites The expected value of a fuzzy number,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem The expected value of a fuzzy number,

Reference 45

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:17.335112Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:12.992114Z digest=sha256:cf85da099d84702ded162fc39d67d480277156cb379705a48402c0a0b28eb346

Observation 2796ce78-85dc-41be-aded-8d4f95db1ed2 · outbound

This paper cites Co- evolutionary makespan optimisation through different ranking methods for the fuzzy flexible job shop,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Co- evolutionary makespan optimisation through different ranking methods for the fuzzy flexible job shop,

Reference 46

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:17.194836Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:13.030327Z digest=sha256:d231d160d2930481996ad2bc24f2342391d038ff370c7c678f3937c1c420c057

Observation a8a6cb66-cc95-4b2f-89ec-978df6d5a7ad · outbound

This paper cites an unresolved cited work.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Unresolved cited work

Reference 47

Resolution
unresolved
raw_fallback, observed 2026-08-10T21:04:17.079251Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:13.065694Z digest=sha256:f30d2aff90df6515c782fe65d1daf641b94a106f47ff8fe2080e6019601989c5

Observation 4e286641-a02b-4191-8936-d25241e2aece · outbound

This paper cites Job shop scheduling by simulated annealing,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Job shop scheduling by simulated annealing,

Reference 48

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:16.961943Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:13.114759Z digest=sha256:9d1b9a4f09b6fa8f4147c21a3889ec9c7b3e493b79d0eb6023618c88ec49cfb8

Observation 910ae732-1c2c-48f8-a243-15351c164750 · outbound

This paper cites How Attentive are Graph Attention Networks?.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem How Attentive are Graph Attention Networks?

Reference 49

Resolution
unresolved
no resolver link, observed 2026-08-10T21:04:13.147735Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-10T21:04:13.147735Z digest=sha256:d5497cab4f33c50672e6bd1875bdd2886a72effae0918ef1e7ded33391814332

Observation 783aec08-de28-4b59-b79d-75b1914697b0 · outbound

This paper cites Attention is all you need,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Attention is all you need,

Reference 50

Resolution
unresolved
no resolver link, observed 2026-08-10T21:04:13.184971Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-10T21:04:13.184971Z digest=sha256:e315c67cebe9396fa521187f38bd7183b0d344a51fbfc1aec5ec770e1994bdef

Observation a72a9c7a-aba8-453a-8c11-de4c6c345f3d · outbound

This paper cites Understanding the difficulty of training deep feedforward neural networks,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Understanding the difficulty of training deep feedforward neural networks,

Reference 51

Resolution
unresolved
no resolver link, observed 2026-08-10T21:04:13.234750Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-10T21:04:13.234750Z digest=sha256:ff4c70c6c1fc5018197a278a01c2f790878a75893f8eaad75cf591a4fd48bbd9

Observation ed14cc6a-3cc4-4cc0-823a-814d195c04ba · outbound

This paper cites Maximum likelihood from incomplete data via the EM algorithm,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Maximum likelihood from incomplete data via the EM algorithm,

Reference 52

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:16.596139Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:13.272315Z digest=sha256:23203b716e6d65efef65d8b457eaa1d042c91368835b39c4d55814861e63cb66

Observation 83d0b546-0d6c-4da5-8a5f-e9b0734fdd7b · outbound

This paper cites Many-objective evolutionary algorithm with reference point-based fuzzy correlation entropy for energy-efficient job shop scheduling with limited workers,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Many-objective evolutionary algorithm with reference point-based fuzzy correlation entropy for energy-efficient job shop scheduling with limited workers,

Reference 53

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:16.454750Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:13.324755Z digest=sha256:fde3c20b4ce1cd5eb6de49ca79e78b3b0a7e22342504b9bfe0839f73648985c5

Observation b99e2afa-27e5-4180-bc4a-c06665611f8b · outbound

This paper cites Fuzzy job-shop scheduling problems: A review,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Fuzzy job-shop scheduling problems: A review,

Reference 54

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:16.294891Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:13.374756Z digest=sha256:4a27315e3e613b792017e84845c4570d8ef08e8f4d9021ab85fbdae20f5f2678

Observation 6b7f4c20-49e7-4959-a1d3-4b8bc82b415a · outbound

This paper cites Adam: A Method for Stochastic Optimization.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Adam: A Method for Stochastic Optimization

Reference 55

Resolution
unresolved
no resolver link, observed 2026-08-10T21:04:13.414744Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-10T21:04:13.414744Z digest=sha256:e3a517d8f492690b153f412fb22cc83b293511847563d1192c6c48ef04d15486

Observation c58f840d-69ec-4581-bacb-92e956a92906 · outbound

This paper cites Mitchell, An introduction to genetic algorithms.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Mitchell, An introduction to genetic algorithms

Reference 56

Resolution
unresolved
no resolver link, observed 2026-08-10T21:04:13.464755Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-10T21:04:13.464755Z digest=sha256:3d38d9cdd60a40a4bf32404ff02a88439f718af7c83b6551ac0d121f4f5aed0b

Observation 3ef2ae40-b3c5-47d0-b148-1696b73a121e · outbound

This paper cites Particle swarm optimization,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Particle swarm optimization,

Reference 57

Resolution
unresolved
no resolver link, observed 2026-08-10T21:04:13.514905Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-10T21:04:13.514905Z digest=sha256:5f27fdc8fbf7f7fb44920cfd11df2f34e2050ee131684daf4a1a5146488c02d0

Observation 9e406efc-c324-4351-b078-f52bee4eda53 · outbound

This paper cites Denoising diffusion probabilistic models,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Denoising diffusion probabilistic models,

Reference 58

Resolution
unresolved
no resolver link, observed 2026-08-10T21:04:13.574756Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-10T21:04:13.574756Z digest=sha256:cceb88583c233a5fb08a09f87c474aa2d7087b39ff9b90c2199ad61e051a410f

Observation 034cf543-b356-45ae-9b63-397def07bb9e · outbound

This paper cites Generative adversarial nets,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Generative adversarial nets,

Reference 59

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:15.949811Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:13.614752Z digest=sha256:aeea4883e5725d89f9c1e37d620ff2eea55bba4523595b2244d7abf747efef9f

Observation 08cda87a-9169-4789-913c-a86ecdac691d · outbound

This paper cites NICE: Non-linear Independent Components Estimation.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem NICE: Non-linear Independent Components Estimation

Reference 60

Resolution
unresolved
no resolver link, observed 2026-08-10T21:04:13.655689Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-10T21:04:13.655689Z digest=sha256:41cef6d427a4b68777fc9cc131ee052f18f86a8e5c996fb4eaf74d9503a522a1

Observation 1206cbf0-d4a1-41b3-aee5-dafb74c1a52e · outbound

This paper cites Permutation flow shop schedul- ing with multiple lines and demand plans using reinforcement learning,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem Permutation flow shop schedul- ing with multiple lines and demand plans using reinforcement learning,

Reference 61

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:15.775953Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:13.705500Z digest=sha256:61a93bbf67da75d576906b7850482d8b03918e644331cdc8887b4e77544fae58

Observation 3a9b16df-80ac-4b74-ac73-528e0322d714 · outbound

This paper cites A tree-based multiobjective evo- lutionary algorithm for energy-efficient hybrid flow-shop scheduling,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem A tree-based multiobjective evo- lutionary algorithm for energy-efficient hybrid flow-shop scheduling,

Reference 62

Resolution
unresolved
no resolver link, observed 2026-08-10T21:04:13.754752Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-10T21:04:13.754752Z digest=sha256:9fef4c075ca615cd7fc8559ced97543cd2da90df203d755ed94c5439b1ac7345

Observation fe8f4798-08f1-4340-ad31-6245393db32e · outbound

This paper cites A biobjective optimization for integrated parallel machine scheduling and location problem: Mathe- matical model and iterative two-stage heuristic,.

An Expectation-Maximization Algorithm-based Autoregressive Model for the Fuzzy Job Shop Scheduling Problem A biobjective optimization for integrated parallel machine scheduling and location problem: Mathe- matical model and iterative two-stage heuristic,

Reference 63

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T21:04:15.595518Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T21:04:13.804824Z digest=sha256:be8b30c8cda02b146a13ebcc2e3e77a92b08e40e558d99c1b6dfa32370eb5c6b

Pith citing papers

No inbound Pith citation observations are available.