Pith. sign in

Paper Citation Record · LEDGER

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control

As of 11 August 2026, this Paper Citation Record lists 40 of 40 outbound references and 0 inbound Pith citation observations for arXiv:2501.13270.

A citation records a reference. It does not transfer a finding from one paper to another.

pith.paper-citation-record.v1
2501.13270 v1

Coverage vector

measured 40 of 40 reference resolution

Typed states for the displayed outbound observations.

Source: paper_references, paper_reference_links, observed 2026-08-10T16:27:56.468850Z

measured 40 of 40 standing notices

One-hop event checks from named stored sources.

Source: scholarly_work_events, retraction_status_cache, observed 2026-08-11T06:34:44.6726+00:00

measured 0 of 0 inbound itemization

Pith citing papers itemized under the disclosed page cap.

Source: paper_references, paper_reference_links

measured 0 of 1 external citation measurements

A source-named dated measurement, never combined with another source.

Source: cited_works

Reference resolution

40 of 40 outbound references displayed

  • verified exact0
  • verified fuzzy22
  • unresolved18
  • parse uncertain0
  • malformed identifier0
  • metadata mismatch0

External citation measurements

No source-named external measurement is stored.

Outbound references

Observation 1f2254be-a4e7-4ebf-9530-4ba17807bc83 · outbound

This paper cites an unresolved cited work.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Unresolved cited work

Reference 1

Resolution
unresolved
raw_fallback, observed 2026-08-10T16:27:57.084573Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.327676Z digest=sha256:be2529f2c1b6bf8671985a18bb2d79ce7fd73e581490b61c48c277289fd5b22d

Observation 9b56c1e2-5c1a-4fa3-b9b4-5fb929a6a990 · outbound

This paper cites an unresolved cited work.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Unresolved cited work

Reference 2

Resolution
unresolved
raw_fallback, observed 2026-08-10T16:27:57.074698Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.332073Z digest=sha256:164ca20291c41a5b8ff3885cb0ba9c9b2133efd762b7a280afc7a8226a35ed51

Observation 6eec1aa8-0d41-4b9c-bfb1-7257258a5a82 · outbound

This paper cites Alessio, A.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Alessio, A

Reference 3

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:57.065189Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.335974Z digest=sha256:3d12b61781d7116397a328b8404ca4fd57585c1911c553ce43a87ddfff09c911

Observation fcfcc061-2116-499c-af92-12bee7a346a4 · outbound

This paper cites Kvasnica, P.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Kvasnica, P

Reference 4

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:57.055396Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.339818Z digest=sha256:4a565bdf6990612d83c019ad8e9af2dbe308a42ec28d86dfc0280f65bec4310b

Observation 57e6c8d4-9768-4c92-9032-6e6de2d38a61 · outbound

This paper cites an unresolved cited work.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Unresolved cited work

Reference 5

Resolution
unresolved
raw_fallback, observed 2026-08-10T16:27:57.045314Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.343939Z digest=sha256:e64e4bee9f84b2896748d94efbc6a819367b7bc8db0ff2c0edafcde436b71062

Observation 69897f1e-67a1-476e-9f3d-828cefddb802 · outbound

This paper cites Henriksson, D.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Henriksson, D

Reference 6

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:57.034901Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.347697Z digest=sha256:7cd2f93a81d19817fa66d8e43972c576faa9a2d7041d4b75511f23445c9b0424

Observation 5269c038-e17c-4ea9-9194-8d10f8b82015 · outbound

This paper cites an unresolved cited work.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Unresolved cited work

Reference 7

Resolution
unresolved
raw_fallback, observed 2026-08-10T16:27:57.024991Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.351456Z digest=sha256:3164a5b31ec453a61097fbe508400bf4d8b363814055378ace3445e8ff2e9be2

Observation 3bba6b8f-4d91-426a-8691-2e1862f0a04f · outbound

This paper cites an unresolved cited work.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Unresolved cited work

Reference 8

Resolution
unresolved
raw_fallback, observed 2026-08-10T16:27:57.015346Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.354918Z digest=sha256:dfa99bc7da8dde5f9c18689f866a068c550696622fc4d8450e88b837e1e27b2d

Observation 6c57a7dc-531a-4378-a384-6709e4c8f88a · outbound

This paper cites an unresolved cited work.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Unresolved cited work

Reference 9

Resolution
unresolved
raw_fallback, observed 2026-08-10T16:27:57.005233Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.358318Z digest=sha256:2fbb0b724341758ef0c799745ec2f44a096b53f1cd22011f8c85df850aedcfe9

Observation 1e59edec-27c9-4c1a-944e-c8be5d4b8317 · outbound

This paper cites an unresolved cited work.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Unresolved cited work

Reference 10

Resolution
unresolved
raw_fallback, observed 2026-08-10T16:27:56.995441Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.361677Z digest=sha256:a5ab5784bea16d93f794229746d1398aba81f90c2bcf75794e3f0e944533584f

Observation c7c4a655-7f19-4ffe-8afd-abed3f3c5ef9 · outbound

This paper cites Heydari, M.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Heydari, M

Reference 11

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.986338Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.364945Z digest=sha256:be8475874f409ff322b6b70472436a537747ba69907576d09e5bc8866d661cfe

Observation 9f892658-eb54-4164-9d17-d83c536f4caa · outbound

This paper cites Cimini, A.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Cimini, A

Reference 12

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.977419Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.368434Z digest=sha256:5f5dc98955ec5fd17149af39e4e570ae7d529e1d75dea6352e890ded1c9a2609

Observation 6f5fd23a-0bc5-4be3-b3ec-b4217436c598 · outbound

This paper cites Ghaemi, J.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Ghaemi, J

Reference 13

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.967836Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.371678Z digest=sha256:fbb815621ca9f53abcc2b73f673fd3859aecee143b7971ee6a6b3733c5244352

Observation 1ddcbd2a-3726-438e-9961-2b199a88318e · outbound

This paper cites Liao-McPherson, M.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Liao-McPherson, M

Reference 14

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.958661Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.375164Z digest=sha256:67dd0d7d4f97d7675c86b022c1919649bf4e56f775ac58949e90c5b602b96898

Observation dcd27d0b-1270-42af-9077-6fc6154a446e · outbound

This paper cites Feller, C.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Feller, C

Reference 15

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.949445Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.378917Z digest=sha256:3126a9009446a9f009351343352b6b0b8d6a4ef58ef09c03eb53ac12cfe5df83

Observation 51523eb3-d74e-4e0e-b2ee-eeb3a51a0cf8 · outbound

This paper cites Feller, C.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Feller, C

Reference 16

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.940181Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.382176Z digest=sha256:d9d0e62c7444ce32eac106a3c8c63411ec95a3b62c19a894e3c9d5a63a7fb65f

Observation 2431ee66-2c15-4cbf-8bdf-05c3971dc27d · outbound

This paper cites Gharbi, C.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Gharbi, C

Reference 17

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.930456Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.385500Z digest=sha256:4e9e0500e46afdea50d50161375042cb66d7762543f77e39c1299256c933def3

Observation 28e11eaa-bbc8-471a-be91-fb9ea0b1e26f · outbound

This paper cites Amiri, M.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Amiri, M

Reference 18

Resolution
unresolved
no resolver link, observed 2026-08-10T16:27:56.389565Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-10T16:27:56.389565Z digest=sha256:e4106d9299f1c03e0b16d3aa8f089fac4eee1fc461e205da3f392e151974eea4

Observation 8e1301fa-2fd7-478d-b483-0910d72d2a6c · outbound

This paper cites Limon, I.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Limon, I

Reference 19

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.920944Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.392943Z digest=sha256:7266c1c39f477c566360adb4b8c2239c6d2562af9b9d72cf28999f5a9c188513

Observation c7f061dd-f76e-470b-aaa6-313d4ce20059 · outbound

This paper cites Ferramosca, D.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Ferramosca, D

Reference 20

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.911388Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.396313Z digest=sha256:1c990421fb5eabc9912f61dfceeec30b4cfc3449b125c939646ddd9a12a615ef

Observation 6c214d30-6615-49d1-997f-00f7aff0ca43 · outbound

This paper cites an unresolved cited work.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Unresolved cited work

Reference 21

Resolution
unresolved
raw_fallback, observed 2026-08-10T16:27:56.901741Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.399500Z digest=sha256:d41914cc3e1fcf8151b4924519eb763c1a071ed5ef34901855e799f93667c283

Observation 00207af0-3ae4-4997-9e00-feb967c8dcaf · outbound

This paper cites Nicotra, D.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Nicotra, D

Reference 22

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.892203Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.402940Z digest=sha256:7b81a23ecaf1673853f4ef6a7880a941c05c0917cf85fa927c2eb82d7dc72ced

Observation c60df943-10a7-4916-bddc-dfdcab289fbb · outbound

This paper cites Hosseinzadeh, E.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Hosseinzadeh, E

Reference 23

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.882881Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.406368Z digest=sha256:2f5e91238d7189403967f4462f9e9d4a9fc03f51b997234f7104a6be10cf71ee

Observation 01cb340c-27d1-4b6f-9f91-04df18b41997 · outbound

This paper cites Hosseinzadeh, B.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Hosseinzadeh, B

Reference 25

Resolution
unresolved
no resolver link, observed 2026-08-10T16:27:56.413134Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-10T16:27:56.413134Z digest=sha256:e9419568447dc89495ec4d9dd1a0459b5110779deb14d4243678378516a665f1

Observation 71f23bd5-1ee3-44a5-8dd6-24052c5a6502 · outbound

This paper cites an unresolved cited work.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Unresolved cited work

Reference 26

Resolution
unresolved
raw_fallback, observed 2026-08-10T16:27:56.863241Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.416749Z digest=sha256:a449f21e42d27f2d5139c1ac8d2824734a6e9458908175b6fc138a53fc71be4e

Observation abf279d4-6767-44c5-bdb4-47be5379658b · outbound

This paper cites Hosseinzadeh, B.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Hosseinzadeh, B

Reference 28

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.843437Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.423671Z digest=sha256:06584f2e764706b0c3f15f06eb85804d934ffd69d0b61af3e36576aaf62e5e4e

Observation a55a36e4-1042-482e-b280-ac539e71ec06 · outbound

This paper cites Strang, Introduction to Linear Algebra, Wellesley-Cambridge Press, 2016.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Strang, Introduction to Linear Algebra, Wellesley-Cambridge Press, 2016

Reference 29

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.832840Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.426762Z digest=sha256:7f51b9a59e3f48c0b3d59797c3174cd0126384ed0df16d24adf46928b7ce4c41

Observation 8492f25e-2fbd-4c19-8818-9b463f0b198b · outbound

This paper cites an unresolved cited work.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Unresolved cited work

Reference 30

Resolution
unresolved
raw_fallback, observed 2026-08-10T16:27:56.822285Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.430019Z digest=sha256:6c7953c868fe984a910333c4574c07d4a693908043e46028c61e89d8666cff23

Observation f211a6ca-916e-4587-806f-abaa0a484eed · outbound

This paper cites Polyak, Modified barrier functions (theory and methods), Mathemati- cal Programming 54 (1–3) (1992) 177–222.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Polyak, Modified barrier functions (theory and methods), Mathemati- cal Programming 54 (1–3) (1992) 177–222

Reference 31

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.811444Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.433388Z digest=sha256:1122f136c33c897225f67759a154c512f86a016697ae3ac8288ab0de1e75a77a

Observation 9a44800e-090d-49b2-b65c-e87391009e45 · outbound

This paper cites Melman, R.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Melman, R

Reference 32

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.800789Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.436607Z digest=sha256:53f1f3e840e8c648031da93419f081a069f40f6fba9cc2b4e47d2368c187df4f

Observation 17224bfd-7ffe-4d36-80f3-bd13a80abf34 · outbound

This paper cites an unresolved cited work.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Unresolved cited work

Reference 33

Resolution
unresolved
raw_fallback, observed 2026-08-10T16:27:56.789883Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.439723Z digest=sha256:ce58f6e1133098a2e31ebc0a5e642a381b5464ab6800cf3e70bed1c5eee5e111

Observation 0e31efae-082f-4ebc-8dce-426393f72d9c · outbound

This paper cites Feijer, F.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Feijer, F

Reference 34

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.777671Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.442803Z digest=sha256:37f102df732f7790ec00235a7bc4b1529806188db66b8b5e11fe3a211aabff7e

Observation 55d9488c-eae0-4101-8982-480d15cdfaa2 · outbound

This paper cites Hosseinzadeh, E.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Hosseinzadeh, E

Reference 35

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.853598Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.445831Z digest=sha256:bfc5145e99ee39bf7e45ecb71e6f841170a90e33c2bd1bb618a25b1769d1257b

Observation 760d325f-0de1-4b8a-b045-44e8332556ae · outbound

This paper cites Hosseinzadeh, A.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Hosseinzadeh, A

Reference 36

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.873140Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.449201Z digest=sha256:05e345d36591461bd14363a26b1fa7445f46c86886fe400dfd48b8d438be453b

Observation 0e233165-1c76-40a3-aa52-8988b4acef28 · outbound

This paper cites Hosseinzadeh, E.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Hosseinzadeh, E

Reference 37

Resolution
verified fuzzy
raw_fallback, observed 2026-08-10T16:27:56.766823Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.452011Z digest=sha256:f818cee9776906cfcc9f8d8c0217410f739efea9f071250b38af0a95e097d797

Observation c521d8a0-8423-4527-9fc8-a3f8b40af58c · outbound

This paper cites an unresolved cited work.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Unresolved cited work

Reference 38

Resolution
unresolved
no resolver link, observed 2026-08-10T16:27:56.455396Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-10T16:27:56.455396Z digest=sha256:b8aca23f65cf8a4893fd34209773bc1a8e051c7428f62c68b7d900794ce81eb2

Observation fe94c09e-e433-4c93-99fd-4df7c7259737 · outbound

This paper cites an unresolved cited work.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Unresolved cited work

Reference 39

Resolution
unresolved
raw_fallback, observed 2026-08-10T16:27:56.755967Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.458811Z digest=sha256:c3ee0338b85151d68e1895df8255d9dca0f45cb20b972382bb2bc871c3357f42

Observation aeff5dc9-f76d-43c2-a2cb-887a9d4d20b0 · outbound

This paper cites an unresolved cited work.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Unresolved cited work

Reference 40

Resolution
unresolved
raw_fallback, observed 2026-08-10T16:27:56.745780Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.461963Z digest=sha256:e5e3c85c70a16e63d9064918723c1bb4ade21559121d3d81c08301e1c6628712

Observation 5ce300e6-a7b8-4b5d-88c7-8184a413fbf3 · outbound

This paper cites an unresolved cited work.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Unresolved cited work

Reference 41

Resolution
unresolved
raw_fallback, observed 2026-08-10T16:27:56.734186Z

Source-reported events for the cited work

No event found in the named queried sources as of 2026-08-11T06:34:44.6726+00:00.

source=pdf_text observed=2026-08-10T16:27:56.465585Z digest=sha256:adaffec42bc60fef7c9e7cdd9220f76a2351fda591123eec555700f897d677a3

Observation a47dfb33-58a0-48dc-bc0a-67e3f1b5741b · outbound

This paper cites Closed-Loop Model Identification and MPC-based Navigation of Quadcopters: A Case Study of Parrot Bebop 2.

Practical Considerations for Implementing Robust-to-Early Termination Model Predictive Control Closed-Loop Model Identification and MPC-based Navigation of Quadcopters: A Case Study of Parrot Bebop 2

Reference 42

Resolution
unresolved
no resolver link, observed 2026-08-10T16:27:56.468850Z

Source-reported events for the cited work

Unavailable: canonical work link unavailable.

source=pdf_text observed=2026-08-10T16:27:56.468850Z digest=sha256:63fce10926fb656bfd6bf7373f4e53c1622de4c2a04b3e7d3899891af5536447

Pith citing papers

No inbound Pith citation observations are available.