Pith. sign in

REVIEW 1 cited by

Orbits and structure of quadruple systems GJ 225.1 and FIN 332

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2008.02361 v1 pith:MNYZRQZK submitted 2020-08-05 astro-ph.SR

classification astro-ph.SR
keywords innerorbitsquadruplesystemsorbitperiodinclinationlarge
verification ladder T0 review T1 audit T2 compute T3 formal

Signed reviews

No signed human review yet.

0 comments
read the original abstract

Only a handful of quadruple systems with two accurate inner visual orbits are known. Architecture of two such systems is studied here to determine period ratios, mutual orbit orientation, and other parameters; updated orbital elements and their errors are derived. Gliese 225.1 (HIP 28442) is composed of three K-type and one M-type dwarfs and has inner orbital periods of 67.2+-0.2 and 23.4+-0.5 yr. Its inner orbits have small mutual inclination and are likely coplanar with the outer orbit of ~2 kyr period. The quadruple system FIN 332 (HIP 92037) consists of four early A type stars with similar masses and magnitudes. Both its inner orbits with periods of 27.6+-0.2 and 39.8+-0.4 yr have large eccentricities (0.82 and 0.84). Their orientation in the sky is remarkably similar. In contrast, the outer orbit with a period of ~5 kyr has a large relative inclination to the inner orbits. Dynamics and formation of these quadruple systems are briefly discussed.

Discussion (0). Continue with ORCID to comment.

Forward citations

Cited by 1 Pith paper

Reviewed papers in the Pith corpus that reference this work. Sorted by Pith novelty score. Full citation record

  1. Peering through the disc of HD 98800 BaBb. Precise timing predictions for the HD 98800 AaAb occultation

    astro-ph.EP 2026-07 conditional novelty 5.0 of 10

    New RVs and multi-wavelength astrometry tighten the HD 98800 outer orbit by ~2×, yielding 5–15-day 1σ windows for the 2025–2031 disc occultation of AaAb.

Pith tools