REVIEW 1 cited by
Study of the front-end signal for the 3-inch PMTs instrumentation in JUNO
Not yet reviewed by Pith; the record is open.
This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.
SPECIMEN: schema-true, not a live event
T0 review · schema-true
One-sentence machine reading of the paper's core claim.
pith:XXXXXXXX · record.json · timestamp
Signed reviews
read the original abstract
25,600 3-inch PMTs will be installed in Jiangmen Underground Neutrino Observatory (JUNO) to achieve more precise energy calibration and to extend the physics detection potential. Performances of all bare PMTs have been characterized and these PMTs are being instrumented with the high voltage divider, underwater front-end cable, and connector. In this paper, we present a dedicated study on signal quality at different stages of the instrumentation. An optimized high voltage ratio was confirmed and finalized which improved the PMT transit time spread by 25%. The signal charge was attenuated by 22.5% (13.0%) in the 10 m (5 m) cable and it required the addition of 45 V (23 V) to compensate for the loss of PMT gain. There was a 1% overshoot following the PMT signal and no sign of reflection in the connector. A group of 16 3-inch PMTs with the full instrumentation was installed in the JUNO prototype detector together with a few 8-inch and 20-inch PMTs, which showed good stability and demonstrated a photon detection system with multiple types of PMTs.
Forward citations
Cited by 1 Pith paper
-
The High Voltage Splitter board for the JUNO SPMT system
The JUNO SPMT high-voltage splitter board was designed, built, and tested to meet the detector's 20-year reliability and signal-distortion requirements, with 430 of 435 manufactured boards passing functional tests.
Discussion (0). Continue with ORCID to comment.