REVIEW 4 major objections 6 minor 36 references
A gravity-aligned vertical e+e− linear collider in one deep shaft can break the cost-and-scale impasse of horizontal Higgs factories.
Reviewed by Pith at T0; open to challenge. T0 means a machine referee read the full paper against a public rubric. the ladder, T0–T4 →
T0 review · grok-4.5
2026-07-31 21:42 UTC pith:FPQCGYUO
load-bearing objection A genuinely new collider geometry idea, honestly framed as concept-level, that still hangs on undemonstrated high-gradient performance. the 4 major comments →
Gravity-Aligned Vertical Electron-Positron Linear Collider
The pith
A machine-rendered reading of the paper's core claim, the machinery that carries it, and where it could break.
Core claim
Orienting an electron-positron linear collider along the local gravitational field inside a single deep vertical shaft, with positrons driven downward and electrons upward to a deep interaction point, can deliver a staged 250–500 GeV Higgs factory while shrinking the surface footprint, reusing SuperKEKB infrastructure, and gaining mechanical, cryogenic, vibration, and cosmic-ray advantages that horizontal machines lack.
What carries the argument
The gravity-aligned vertical shaft geometry itself: one ~3 km shaft houses both main linacs, a deep interaction point, and drive-beam power extraction, converting accelerator length into depth and making the local plumb line the natural alignment reference.
Load-bearing premise
That average accelerating gradients well above 100 MV per meter, with shunt impedance near 1 gigaohm per meter, can be sustained efficiently in cryogenic dielectric-assist or 300 GHz structures that have not yet been demonstrated.
What would settle it
A sustained high-power test showing that cryogenic X-band dielectric-assist (or 300 GHz metallic) structures reach and hold gradients of order 300 MV/m at the required shunt impedance and efficiency without multipacting or breakdown failure, or a geotechnical study proving a 3 km shaft at the proposed site is impractical.
If this is right
- Higgs-factory physics at 250–500 GeV becomes possible inside a compact surface footprint rather than a tens-of-kilometers horizontal tunnel.
- A deep, cosmically quiet interaction point opens cleaner searches for long-lived particles and displaced vertices.
- Gravity-parallel beam and spin orientations create a concrete setting in which spin-gravity and Lorentz-violation couplings can be tested.
- Existing SuperKEKB tunnels, rings, and injector can be reused, lowering the civil and source cost of a new collider.
- On-site pumped storage, geothermal heat, and gravity-assisted cryogenics become design options rather than afterthoughts.
Where Pith is reading between the lines
- If the gradient goal is met first in a short vertical test shaft, the same technology would also shrink any future horizontal compact collider, so the R&D has dual use.
- A successful 3 km physics shaft would create a dual-purpose deep laboratory that particle physics and geophysics could share, similar to existing mine-based labs but purpose-built.
- The social-industrial framing implies that funding cases for future colliders may need to treat civil works and energy assets as co-products, not pure science overhead.
- Failure of multipacting mitigation in dielectric-assist structures would force the concept onto undeveloped 300 GHz power extraction, tightening the critical path.
Editorial analysis
A structured set of objections, weighed in public.
Referee Report
Summary. The manuscript proposes, at deliberately conceptual level, a vertical e+e− linear collider: the beam axis aligned with local gravity inside a single ~3 km shaft, positrons accelerated downward from the surface and electrons upward from the bottom, colliding at a deep IP near mid-depth. The machine targets a staged 250–500 GeV Higgs-factory program, which inside a 3-km shaft requires average gradients well above 100 MV/m (~300 MV/m is used as the illustration). Via Eq. (1), the author argues this requires ~1 GΩ/m shunt impedance per unit length at CLIC-like power densities, and identifies cryogenic X-band dielectric-assist (DAA) structures and 300 GHz cryogenic metallic structures as candidate technologies. The paper inventories vertical-specific advantages (azimuthal load symmetry, plumb-line alignment reference, deep vibration isolation, cosmically quiet IP, gravity-assisted pressure-staged cryogenics, natural dump locations, possible on-site energy storage, PR/industrial opportunity), lists disadvantages honestly (gradient, shaft construction, installation/maintenance, unproven luminosity, unproven BSM motivation), and sketches reuse of the SuperKEKB complex (LER as positron damping ring, HER as drive-beam combiner ring, injector linac in high-duty SC operation). Excavation feasibility of a ~3 km shaft is argued from public mining precedents (Witwatersrand, South Deep single-lift ~3 km shaft) and from the geology beneath the KEK Tsukuba Campus.
Significance. If the concept survives feasibility study, it addresses a real problem — the cost-and-scale impasse that has stalled e+e− Higgs factories — with a genuinely novel geometric proposal rather than an incremental one. Specific strengths worth naming: the author correctly frames the paper as concept-level and explicitly enumerates the critical disadvantages rather than hiding them; the gradient–shunt-impedance–power tradeoff is stated openly through Eq. (1) with CLIC reference values, making the key assumption falsifiable and externally anchored (no circular fitting); the shaft-depth assumption is benchmarked against concrete public precedents (South Deep, Mponeng, SNOLAB, CJPL, Fig. 2) rather than asserted; vertical-specific systematics that most concept papers would ignore (Coriolis deflection of counter-propagating beams, tidal tilt of the local vertical, anomalous skin effect limiting the cryogenic conductivity gain) are identified and estimated; and the cosmically-quiet deep IP is a real, non-speculative detector-environment point. The paper's honest hedging on the BSM spin-gravity motivation (Sec. II C, II D item v) is also to its credit. As a concept paper intended to stimulate R
major comments (4)
- [Sec. II B, shunt impedance targets (around Eq. (1)) and Sec. IV] The compactness claim stands or falls on sustained operation at ~300 MV/m with R_sh/L ~ 1 GΩ/m. The primary option (cryogenic DAA at 1.8 GΩ/m) rests on an extrapolation from a few-cell room-temperature measurement (Ref. [22]) plus a private communication (Ref. [23]), while the text itself states that DAA gradient is presently limited by multipacting and that 300 GHz power extraction is undemonstrated. Because Eq. (1) makes the tradeoff transparent, the paper should include one quantitative fallback scenario: at demonstrated-class cryogenic NC performance (~100-120 MV/m, e.g., Ref. [27]), a 500 GeV stage needs ~2.1-2.5 km of active length per beam plus BDS and extraction, so the machine no longer fits a 3 km shaft, while a 250 GeV stage (~1.1 km/beam) marginally does. Stating this scaling explicitly would convert the weakest assumption into a clearly staged R&D milestone (250 GeV stage vi
- [Secs. I, II D(ii), IV: cost claim] The stated motivation — breaking the cost-and-scale impasse — is the paper's title-level claim, yet no quantitative comparison of any kind is offered between a ~3 km deep large-diameter shaft (with staged access drifts, hoisting, ground support, refrigeration, and water control at 3-4 km rock temperatures) and a conventional 20-30 km horizontal tunnel, nor between reuse of SuperKEKB and greenfield construction. Sec. II D(ii) calls the shaft 'a major, multi-year, high-cost undertaking', which cuts directly against the framing motivation unless at least an order-of-magnitude unit-cost discussion (shaft sinking and equipping per meter vs. TBM tunneling per meter, with public mining/civil-engineering figures of the kind already used for Fig. 2) is included. A concept paper need not have a cost model, but a cost-motivated concept paper should show the cost triangle can plausibly close; this i
- [Sec. III B, spent-beam handling] There is an internal numerical inconsistency: the IP is placed 'near mid-depth' (~1.5 km) in Secs. II C and III B, but the stated ~10 m surface offset of the electron dump from a 14 mrad crossing angle implies an IP-to-surface drift of only ~0.7 km. With a mid-depth IP, 14 mrad gives ~21 m at the surface (before any BDS/extraction bending, which is presumably where the factor of 2 went). Please either correct the offset, state the assumed extraction optics, or move the IP. The number is small, but it is the only fully worked geometric number in the dump scheme and it currently does not check out.
- [Sec. II D(iv) and Sec. IV] No strawman luminosity or parameter set is given anywhere — not even a target luminosity, bunch charge, or repetition rate — although luminosity is listed as an open challenge and a start-to-end simulation is listed as a next step. For a Higgs-factory concept paper the absence of any luminosity anchor (e.g., 'the concept must deliver ~2x10^34 cm^-2s^-1 at 250 GeV to be competitive with FCC-ee/CEPC/ILC; here is what that implies for drive-beam power and wall-plug power at the assumed RF-to-beam efficiency') leaves the reader unable to judge whether the vertical geometry is even in the right ballpark. A short paragraph with such an anchor would substantially raise the paper's value to the community it aims to motivate.
minor comments (6)
- [Sec. II C, 'Cosmically quiet interaction point'] The claim of ~6 orders of magnitude muon-flux reduction at ~1.5 km rock (~4 km.w.e.) should carry a citation to a standard muon-flux-vs-depth compilation (e.g., the Mei & Hime parameterization or the SNOLAB/CJPL measurements already cited as [35, 36]), rather than resting on the facility citations alone.
- [Sec. II B] Ref. [23] is a private communication that carries the single most important number in the paper (1.8 GΩ/m at 77 K for the five-regular-cell magnesia/6N-copper DAA structure). If any preprint, proceedings, or public report of these data exists, it should be cited instead; at minimum the text should state explicitly that this value is unpublished and single-source.
- [Sec. II C, alignment] The Coriolis estimate ('sub-micrometer displacement and nrad-level angle') is a nice inclusion; please give the assumed latitude and beam rigidity in a parenthetical so the number is checkable. Similarly, the claim that Earth-tide tilt of the local vertical falls within beam-based feedback bandwidth should state the expected tilt amplitude (~tens of nrad diurnal) for comparison with the nrad tiltmeter sensitivity quoted two sentences earlier.
- [Fig. 2] The depth bars lack explicit labels for which value corresponds to which facility on the bar itself, and the South Deep entry should distinguish hoisting-shaft depth from working depth, since the paper's single-lift precedent argument depends on that distinction.
- [Sec. III C] The HER-to-isochronous-combiner-ring conversion mentions coherent synchrotron radiation for high-charge trains; a pointer to the CLIC combiner-ring design studies (CSR mitigation in the CDR) would help readers gauge how much of this is redesign versus extrapolation.
- [General] Notation: 'NC (SC) AC' in the Fig. 3 caption is non-standard (presumably 'accelerating cavity/structure'); E_acc and R_sh/L are defined cleanly but 'acceleration efficiency' is used loosely for shunt impedance in Sec. II B — consider 'power efficiency' to avoid confusion with RF-to-beam efficiency, which is a separate unaddressed quantity.
Circularity Check
No circularity: concept proposal with external engineering anchors, not a closed derivation or fitted prediction loop.
full rationale
This paper is a deliberately concept-level accelerator proposal, not a first-principles derivation that claims to predict observables from fitted inputs. The only quantitative relation used as a design tradeoff is the standard RF identity E_acc = sqrt((R_sh/L)*(P_in/L)) (Eq. 1), populated with external CLIC-like reference values (R_sh/L ≈ 100 MΩ/m, P_in/L ≈ 100 MW/m) and then scaled to state a target R_sh/L ≈ 1 GΩ/m at ~300 MV/m. That scaling does not define the answer as the input; it is an ordinary engineering requirement statement. Supporting numbers for cryogenic DAA and 300 GHz structures are taken from external literature and a private communication, not from a fit inside this manuscript that is later re-labeled a prediction. Shaft-depth feasibility rests on publicly cited mining and underground-lab precedents (South Deep, SNOLAB, CJPL, etc.), and SuperKEKB reuse is an external institutional anchor. There are no self-citation uniqueness theorems, no ansatz smuggled from the author’s prior work as forced mathematics, and no renaming of a known empirical pattern as a new unification. Residual softness (undemonstrated sustained gradient, multipacting, 300 GHz power extraction) is a correctness/feasibility risk, not circularity. Score 0 with empty steps is the honest finding.
Axiom & Free-Parameter Ledger
free parameters (5)
- Working shaft depth =
~3 km
- Target average accelerating gradient =
~300 MV/m (illustrative)
- Target shunt impedance per unit length =
≈1 GΩ/m
- IP depth / overburden for cosmic quietness =
~1.5 km IP depth
- Illustrative crossing angle for surface dump offset =
14 mrad
axioms (7)
- domain assumption Normal-conducting cryogenic structures (DAA at X-band or metallic at ~300 GHz) can eventually deliver sustained gradients ≫100 MV/m at high efficiency without show-stopping multipacting or breakdown.
- domain assumption A ~3 km large-diameter vertical shaft is feasible at acceptable cost and risk for a precision collider at a geologically favorable site (e.g., granite basement under KEK Tsukuba).
- domain assumption Ultra-low-emittance cryogenic RF photoinjectors can replace an electron damping ring while preserving luminosity-relevant brightness at the IP.
- domain assumption CLIC-like two-beam power delivery can be implemented with SuperKEKB HER reused as combiner ring (isochronous optics, sub-harmonic deflectors) and drive beams sent down the shaft.
- standard math RF power per unit length scales as Pin/L = E_acc² / (Rsh/L) (Eq. 1), so impedance targets follow from chosen gradient and reference Pin/L.
- ad hoc to paper Extensive reuse of SuperKEKB tunnels, magnets, injector, LER as positron DR, and HER as drive-beam complex is central to the cost argument.
- ad hoc to paper Vertical geometry yields net practical advantages (alignment, vibration, cryogen thermosiphon cells, dumps, PR/funding) that help break the cost-and-scale impasse.
invented entities (2)
-
Gravity-aligned vertical e+e− linear collider (single-shaft architecture)
no independent evidence
-
Optional BSM sensitivity from gravity-parallel polarized e+ vs e− collisions (SME / spin-gravity / axion monopole-dipole)
no independent evidence
read the original abstract
A gravity-aligned vertical electron-positron linear collider is proposed as a concept to break the cost-and-scale impasse that confronts conventional horizontal Higgs factories. The accelerating axis is oriented along the local gravitational field inside a single deep vertical shaft. Positrons are injected downward from the surface while electrons are accelerated upward from the bottom, the two beams meeting at an interaction point located deep underground. Targeting a staged center-of-mass energy in the Higgs factory range (250-500 GeV), this concept assumes high-gradient, high-efficiency, normal-conducting accelerating structures operated at cryogenic temperature together with a two-beam power-delivery scheme. It can be designed to reuse the existing KEK/SuperKEKB accelerator complex at the KEK Tsukuba Campus. We discuss the advantages of the vertical orientation, namely a small surface footprint, intrinsic azimuthal symmetry of the gravity load, deep vibration isolation of the collision point, gravity-assisted cryogenics, a natural vertical alignment reference, a cosmically quiet deep interaction point, an opportunity for on-site electricity self-sufficiency, and a unique opportunity in social/industrial evaluation, as well as the principal disadvantages and challenges, including the required accelerating gradient and the construction of a kilometers-deep shaft. Using only publicly available information, we argue that excavating a shaft with a depth of ~3 km is feasible at a geologically favorable site. This paper is deliberately concept-level and is intended to motivate technological innovation, feasibility studies, and the exploration of possible new channels for Beyond-Standard-Model searches through vertical collisions.
Figures
Reference graph
Works this paper leans on
-
[5]
H. Abramowiczet al.,The International Lin- ear Collider Technical Design Report — Volume 4: Detectors(2013), arXiv:1306.6329 [physics.ins- det]. [6]https://linearcollider.org/
Pith/arXiv arXiv 2013
-
[7]
Aicheleret al.,A Multi-TeV Linear Col- lider Based on CLIC Technology, CERN-2012- 007, SLAC-R-985, KEK-Report-2012-1, PSI-12- 01, JAI-2012-001 (2012)
M. Aicheleret al.,A Multi-TeV Linear Col- lider Based on CLIC Technology, CERN-2012- 007, SLAC-R-985, KEK-Report-2012-1, PSI-12- 01, JAI-2012-001 (2012)
2012
-
[8]
Physics Potential of CLIC Operation at 380 GeV,
A. Winter [CLICdp], “Physics Potential of CLIC Operation at 380 GeV,” CLICdp-Conf-2017-009 (2017)
2017
-
[9]
Huang, A
X. Huang, A. Grudiev, Z. Zhao, and W. Fang, CLIC380: RF design and parameters of the 2017 re-baselined 380 GeV CLIC linac accelerat- ing structure, Nucl. Instrum. Meth. A916, 230 (2019). [10]https://clic.cern/
2017
-
[11]
C. Vernieriet al.,Strategy for Understanding the Higgs Physics: The Cool Copper Collider, JINST 18(07), P07053 (2023), arXiv:2203.07646 [hep- ex]. [12]https://web.slac.stanford.edu/c3/
Pith/arXiv arXiv 2023
-
[13]
M. Benediktet al.(FCC),Future Circular Col- lider Feasibility Study Report: Volume 1, Physics, Experiments, Detectors, Eur. Phys. J. C85, 1468 (2025), arXiv:2505.00272 [hep-ex]
Pith/arXiv arXiv 2025
-
[14]
M. Benediktet al.(FCC),Future Circular Col- lider Feasibility Study Report: Volume 2, Accel- erators, Technical Infrastructure and Safety, Eur. Phys. J. ST234, 5713 (2025), arXiv:2505.00274 [physics.acc-ph]
Pith/arXiv arXiv 2025
-
[15]
M. Benediktet al.(FCC),Future Circular Collider Feasibility Study Report: Volume 3, Civil Engi- neering, Implementation and Sustainability, Eur. Phys. J. ST234, 5113 (2025), arXiv:2505.00273 [physics.acc-ph]. [16]https://fcc.web.cern.ch/
Pith/arXiv arXiv 2025
-
[17]
Abdallahet al.[CEPC Study Group], Ra- diat
W. Abdallahet al.[CEPC Study Group], Ra- diat. Detect. Technol. Methods8, no.1, 1-1105 (2024) [erratum: Radiat. Detect. Technol. Meth- ods9, no.1, 184-192 (2025)] doi:10.1007/s41605- 024-00463-y [arXiv:2312.14363 [physics.acc-ph]]
arXiv 2024
-
[18]
S. P. Adhyaet al.[CEPC Study Group], [arXiv:2510.05260 [hep-ex]]. [19]http://cepc.ihep.ac.cn/ [20]https://www.kek.jp/en/topics/202202251335
-
[21]
D. Satoh,High Power Experimental Stud- ies of X-band Dielectric Assist Accelerating Structure at Nextef2, presented at the 16th Workshop on Breakdown Science and High Gradient Accelerator Technology (HG2025) (2025).https://indico.fnal.gov/event/ 65159/contributions/311809/
2025
-
[22]
D. Satoh, T. Shibuya, H. Ogawa, M. Tanaka, R. Kuroda, S. Mori, M. Yoshida, H. Toyokawa, Power Efficiency Enhancement of Dielectric Assist Accelerating Structure, Nucl. Instrum. Methods Phys. Res. Sect. B459, pp. 148- 152 (2019).https://doi.org/10.1016/j.nimb. 2019.09.006
doi:10.1016/j.nimb 2019
-
[23]
Satoh (AIST), private communication
D. Satoh (AIST), private communication
-
[24]
E. A. Nanni,THz Accelerators and Their Appli- cation to Ultrafast Electron Diffraction, presented at the UK Accelerator Institutes Seminar (2022). https://indico.cern.ch/event/1108852/ contributions/4664388/attachments/ 2393560/4092141/THzUK_FINAL.pdf
arXiv 2022
-
[25]
Minamide and Y
H. Minamide and Y. Takida,Intense Multicycle Terahertz-Wave Generation for Electron Acceler- ation, presented at the 11th International Work- shop on Infrared Microscopy and Spectroscopy with Accelerator Based Sources (WIRMS2022) (2022). 7
2022
- [26]
-
[27]
A. D. Cahillet al.,High Gradient Exper- iments with X-band Cryogenic Copper Accel- erating Cavities, Phys. Rev. Accel. Beams 21, 102002 (2018).https://doi.org/10.1103/ PhysRevAccelBeams.21.102002
2018
-
[28]
Jacewiczet al.,Temperature Dependent Field Emission and Breakdown Measurements using a Pulsed High-Voltage CryoSystem, Phys
M. Jacewiczet al.,Temperature Dependent Field Emission and Breakdown Measurements using a Pulsed High-Voltage CryoSystem, Phys. Rev. Ap- plied14, 061002 (2020).https://doi.org/10. 1103/PhysRevApplied.14.061002
2020
-
[29]
J. B. Rosenzweiget al.,Next Generation High Brightness Electron Beams from Ultrahigh Field Cryogenic RF Photocathode Sources, Phys. Rev. Accel. Beams22, 023403 (2019).https://doi. org/10.1103/PhysRevAccelBeams.22.023403
-
[30]
Robleset al.,Versatile, high brightness, cryo- genic photoinjector electron source, Phys
R. Robleset al.,Versatile, high brightness, cryo- genic photoinjector electron source, Phys. Rev. Accel. Beams24, 063401 (2021).https://doi. org/10.1103/PhysRevAccelBeams.24.063401
-
[31]
R. J. Durrheimet al.,Factors influencing the severity of rockburst damage in South African gold mines, J. S. Afr. Inst. Min. Metall.98, 53 (1998).https://journals.co.za/doi/pdf/ 10.10520/AJA0038223X_2507
-
[32]
R. J. Durrheim,Mitigating the risk of rockbursts in the deep hard-rock mines of South Africa: 100 years of research,In Extracting the Science: a cen- tury of mining research, J. Brune (editor), Soci- ety for Mining, Metallurgy, and Exploration, Inc., ISBN 978-0-87335-322-9, pp. 156-171(2010)
2010
-
[33]
Mining Technology,The top ten deep- est mines in the world(2019).https: //www.mining-technology.com/marketdata/ feature-top-ten-deepest-mines-world-south-africa/ [34]https://www.goldfields-southdeep.co.za/ about-us/about-south-deep/our-mine
2019
-
[35]
J. P. Cheng, K. J. Kang, J. M. Li, J. Li, Y. J. Li, Q. Yue, Z. Zeng, Y. H. Chen, S. Y. Wu and X. D. Jiet al.,The China Jinping Underground Laboratory and its Early Science, Ann. Rev. Nucl. Part. Sci.67, pp. 231-251 (2017).https: //www.annualreviews.org/content/journals/ 10.1146/annurev-nucl-102115-044842
-
[36]
N. J. T. Smith,The SNOLAB deep under- ground facility, Eur. Phys. J. Plus127, 108 (2012).https://link.springer.com/article/ 10.1140/epjp/i2012-12108-9
-
[37]
K. Akai, K. Furukawa, and H. Koiso (Su- perKEKB),SuperKEKB Collider, Nucl. In- strum. Meth. A907, pp.188-199 (2018), arXiv:1809.01958 [physics.acc-ph].https: //www.sciencedirect.com/science/article/ abs/pii/S0168900218309616?via%3Dihub [38]https://www-superkekb.kek.jp/
Pith/arXiv arXiv 2018
-
[39]
Colladay and V
D. Colladay and V. A. Kosteleck´ y,CPT vio- lation and the standard model, Phys. Rev. D 55, pp.6760-6774 (1997).https://doi.org/10. 1103/PhysRevD.55.6760
1997
-
[40]
Colladay and V
D. Colladay and V. A. Kosteleck´ y,Lorentz- violating extension of the standard model, Phys. Rev. D58, 116002 (1998).https://doi.org/10. 1103/PhysRevD.58.116002
1998
-
[41]
V. A. Kosteleck´ y and J. D. Tasson,Matter-gravity couplings and Lorentz violation, Phys. Rev. D 83, 016013 (2011).https://doi.org/10.1103/ PhysRevD.83.016013
2011
-
[42]
J. E. Moody and F. Wilczek,New macroscopic forces?, Phys. Rev. D30, 130 (1984).https:// doi.org/10.1103/PhysRevD.30.130
-
[43]
V. A. Kosteleck´ y and N. Russell,Data tables for Lorentz and CPT violation, Rev. Mod. Phys. 83, 11 (2011).https://journals.aps.org/rmp/ abstract/10.1103/RevModPhys.83.11(updated annually in arXiv:0801.0287)
arXiv 2011
-
[44]
Hayashi, K
H. Hayashi, K. Kasahara, and H. Kimura,Pre- Neogene basement rocks beneath the Kanto Plain, central Japan, Jour. Geol. Soc. Japan112, No.1, pp. 2-13 (2006).https://doi.org/10. 5575/geosoc.112.2
2006
-
[45]
Hayashi, K
H. Hayashi, K. Kasahara, H. Kimura,Erratum : Pre-Neogene basement rocks beneath the Kanto Plain, central Japan, Jour. Geol. Soc. Japan 112, No.3, pp. 241 (2006).https://doi.org/10. 5575/geosoc.erratum_2006.02
2006
-
[46]
K. Kasaharaet al.,3.2.2 Deep Borehole Drilling, Well Logging, and Downhole Velocity Structure Survey, in Final Report of the Special Project for Earthquake Disaster Mitigation in Urban Areas I: Prediction of Strong Ground Motion Study on Crustal Structure in Metropolitan Areas (FY2006), pp. 304-335 (2007), published by National Research Institute for Eart...
2007
-
[47]
National Research Institute for Earth Science and Disaster Resilience (NIED), Strong-Motion Seis- mograph Networks K-NET & KiK-net.https: //www.kyoshin.bosai.go.jp/
-
[48]
Yoshidaet al.,Generation and Acceleration of Low-Emittance, High-Current Electron Beams for SuperKEKB, in Proceedings of LINAC2014, MOIOB03 (2014).https://proceedings
M. Yoshidaet al.,Generation and Acceleration of Low-Emittance, High-Current Electron Beams for SuperKEKB, in Proceedings of LINAC2014, MOIOB03 (2014).https://proceedings. jacow.org/LINAC2014/papers/moiob03.pdf 8
2014
discussion (0)
Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.