Pith. sign in

REVIEW

Total Completion Time Scheduling Under Scenarios

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2402.19259 v1 pith:JQHPFJN3 submitted 2024-02-29 cs.DS

classification cs.DS
keywords scenariosjobsschedulingcompletionproblemtotalgivenidentical
verification ladder T0 review T1 audit T2 compute T3 formal

Signed reviews

No signed human review yet.

0 comments
read the original abstract

Scheduling jobs with given processing times on identical parallel machines so as to minimize their total completion time is one of the most basic scheduling problems. We study interesting generalizations of this classical problem involving scenarios. In our model, a scenario is defined as a subset of a predefined and fully specified set of jobs. The aim is to find an assignment of the whole set of jobs to identical parallel machines such that the schedule, obtained for the given scenarios by simply skipping the jobs not in the scenario, optimizes a function of the total completion times over all scenarios. While the underlying scheduling problem without scenarios can be solved efficiently by a simple greedy procedure (SPT rule), scenarios, in general, make the problem NP-hard. We paint an almost complete picture of the evolving complexity landscape, drawing the line between easy and hard. One of our main algorithmic contributions relies on a deep structural result on the maximum imbalance of an optimal schedule, based on a subtle connection to Hilbert bases of a related convex cone.

Discussion (0). Continue with ORCID to comment.

Pith tools