Pith. sign in

REVIEW

Horizontal Test for BEPCII 500MHz Spare Cavity

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 1112.2486 v1 pith:QF5HF7OR submitted 2011-12-12 physics.acc-ph

classification physics.acc-ph
keywords cavitytesthorizontalbepciiparametersspareaginganalyzed
verification ladder T0 review T1 audit T2 compute T3 formal

Signed reviews

No signed human review yet.

0 comments
read the original abstract

The horizontal test for BEPCII 500MHz spare cavity has been completed in IHEP. The max voltage of the cavity is 2.17MV, Q0 is 5.78\times108.This paper mainly reports coupler aging parameters before the horizontal test, as well as the parameters during cool-down the change of frequency, loaded Q, vacuum and the deformation of the cavity with temperature. And the test results were analyzed.

Discussion (0). Continue with ORCID to comment.

Pith tools