Pith. sign in

REVIEW 2 cited by

The Metallicity of the HD 98800 System

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 0905.1907 v1 pith:2R6CZLAK submitted 2009-05-12 astro-ph.SR

The Metallicity of the HD 98800 System

classification astro-ph.SR
keywords metallicitysystemcomponentsfitsluminositiesmassesspectrumstellar
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

Pre-main sequence (PMS) binaries and multiples enable critical tests of stellar models if masses, metallicities, and luminosities of the component stars are known. We have analyzed high-resolution, high signal-to-noise echelle spectra of the quadruple-star system HD 98800 and using spectrum synthesis, computed fits to the composite spectrum for a full range of plausible stellar parameters for the components. We consistently find that sub-solar metallicity yields fits with lower $\chi^2$ values, with an overall best-fit of $[M/H] = -0.20\pm0.10$. This metallicity appears to be consistent with PMS evolutionary tracks for the measured masses and luminosities of the components of HD 98800 but additional constraints on the system and modelling are needed.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.

Forward citations

Cited by 2 Pith papers

Reviewed papers in the Pith corpus that reference this work. Sorted by Pith novelty score.

  1. Peering through the disc of HD 98800 BaBb. Precise timing predictions for the HD 98800 AaAb occultation

    astro-ph.EP 2026-07 conditional novelty 5.0

    A joint orbital fit of new and archival data narrows the predicted 2025–2031 occultation windows of HD 98800 AaAb by the BaBb circumbinary disc to roughly 5–15 days for the sharpest crossings.

  2. Peering through the disc of HD 98800 BaBb. Precise timing predictions for the HD 98800 AaAb occultation

    astro-ph.EP 2026-07 conditional novelty 4.0

    New RVs and multi-wavelength astrometry tighten the HD 98800 outer orbit by ~2×, yielding 5–15-day 1σ windows for the 2025–2031 disc occultation of AaAb.