pith. sign in

arxiv: 1803.08940 · v1 · pith:MWLMUNGMnew · submitted 2018-03-23 · ⚛️ physics.acc-ph

Status of the warm front end of PIP-II injector test

classification ⚛️ physics.acc-ph
keywords beamenergypip-iitesttransportconstructionfrontinjector
0
0 comments X p. Extension
pith:MWLMUNGM Add to your LaTeX paper What is a Pith Number?
\usepackage{pith}
\pithnumber{MWLMUNGM}

Prints a linked pith:MWLMUNGM badge after your title and writes the identifier into PDF metadata. Compiles on arXiv with no extra files. Learn more

read the original abstract

The Proton Improvement Plan II (PIP-II) at Fermilab is a program of upgrades to the injection complex. At its core is the design and construction of a CW compatible, pulsed H- SRF linac. To validate the concept of the front-end of such machine, a test accelerator known as PIP-II Injector Test (PIP2IT) is under construction. It includes a 10 mA DC, 30 keV H- ion source, a 2 m-long Low Energy Beam Transport (LEBT), a 2.1 MeV CWRFQ, followed by a Medium Energy Beam Transport (MEBT) that feeds the first of 2 cryomodules increasing the beam energy to about 25 MeV, and a High Energy Beam Transport section (HEBT) that takes the beam to a dump. The ion source, LEBT, RFQ, and initial version of the MEBT have been built, installed, and commissioned. This report presents the overall status of the warm front end.

This paper has not been read by Pith yet.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.