REVIEW
On the Design of an Insurance Mechanism for Reliability Differentiation in Electricity Markets
Not yet reviewed by Pith; the record is open.
This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.
SPECIMEN: schema-true, not a live event
T0 review · schema-true
One-sentence machine reading of the paper's core claim.
pith:XXXXXXXX · record.json · timestamp
Signed reviews
read the original abstract
Securing an adequate supply of dispatchable resources is critical for keeping a power system reliable under high penetrations of variable generation. Traditional resource adequacy mechanisms are poorly suited to exploiting the growing flexibility and heterogeneity of load enabled by advancements in distributed resource and control technology. To address these challenges this paper develops a resource adequacy mechanism for the electricity sector utilising insurance risk management frameworks that is adapted to a future with variable generation and flexible demand. The proposed design introduces a central insurance scheme with prudential requirements that align diverse consumer reliability preferences with the financial objectives of an insurer-of-last-resort. We illustrate the benefits of the scheme in (i) differentiating load by usage to enable better management of the system during times of extreme scarcity, (ii) incentivising incremental investment in generation infrastructure that is aligned with consumer reliability preferences and (iii) improving overall reliability outcomes for consumers.
Discussion (0). Continue with ORCID to comment.