The reviewed record of science sign in
Pith

arxiv: 2502.11960 · v1 · pith:JXGNZW5Q · submitted 2025-02-17 · stat.AP

Seamless short- to mid-term probabilistic wind power forecasting

Reviewed by Pith T0 review T1 audit T2 compute T3 formal T4 kernel pith:JXGNZW5Qrecord.jsonopen to challenge →

classification stat.AP
keywords forecastsuncertaintyweatherwindfarmsforecastingmid-termlead
0
0 comments X
read the original abstract

This paper presents a method for probabilistic wind power forecasting that quantifies and integrates uncertainties from weather forecasts and weather-to-power conversion. By addressing both uncertainty sources, the method achieves state-of-the-art results for lead times of 6 to 162 hours, eliminating the need for separate models for short- and mid-term forecasting. It also improves short-term forecasts during high weather uncertainty periods, which methods based on deterministic weather forecasts fail to capture. The study reveals that weather-to-power uncertainty is more significant for short-term forecasts, while weather forecast uncertainty dominates mid-term forecasts, with the transition point varying between wind farms. Offshore farms typically see this shift at shorter lead times than onshore ones. The findings are supported by an extensive, reproducible case study comprising 73 wind farms in Great Britain over five years.

This paper has not been read by Pith yet.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.