pith. sign in

arxiv: 2503.24168 · v2 · pith:5D4ILEMSnew · submitted 2025-03-31 · ⚛️ physics.acc-ph

The Compact Linear e^+e^- Collider (CLIC)

classification ⚛️ physics.acc-ph
keywords clicstagebaselinecolliderlinearacceleratorcompactdevelopments
0
0 comments X
read the original abstract

The Compact Linear Collider (CLIC) is a TeV-scale high-luminosity linear e$^+$e$^-$ collider studied by the international CLIC and CLICdp collaborations. CLIC uses a two-beam acceleration scheme, in which normal-conducting high-gradient 12 GHz accelerating structures are powered via a high-current drive beam. CLIC is foreseen to be built and operated in stages. The initial 380 GeV stage, with a site length of 11 km, optimally combines the exploration of Higgs and top-quark physics, including a top threshold scan near 350 GeV. A higher-energy stage, still using the initial single drive-beam complex, can be optimised for any energy up to 2 TeV. Parameters are presented in detail for a 1.5 TeV stage, with a site length of 29 km. Since the 2018 ESPPU reporting, significant effort was invested in CLIC accelerator optimisation, technology developments and system tests, including collaboration with new-generation light sources and free-electron lasers. CLIC implementation aspects at CERN have covered detailed studies of civil engineering, electrical networks, cooling and ventilation, scheduling, and costing. The CLIC baseline at 380 GeV is now 100 Hz operation, with a luminosity of 4.5$\times 10^{34}$ cm$^{-2}$s$^{-1}$ and a power consumption of 166 MW. Compared to the 2018 design, this gives three times higher luminosity-per-power. The new baseline has two beam-delivery systems, allowing for two detectors operating in parallel. The cost estimate of the 380 GeV baseline is approximately 7.2 billion CHF. The construction of the first CLIC energy stage could start as early as ~2034/35 with first beams following a decade later. This report summarises the CLIC project, its implementation and running scenarios, with emphasis on new developments and recent progress. It concludes with an update on the CLIC detector studies and on the physics potential in light of the improved accelerator performance.

This paper has not been read by Pith yet.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.

Forward citations

Cited by 3 Pith papers

Reviewed papers in the Pith corpus that reference this work. Sorted by Pith novelty score.

  1. Experimental aspects of the Quantum Tomography of tau lepton pairs at a Higgs factory collider

    hep-ex 2026-03 unverdicted novelty 6.0

    A kinematic reconstruction technique for tau pairs at Higgs factories, using momenta and impact parameters with weighted solutions, enables spin polarimeter extraction and shows photon angular resolution is the domina...

  2. Top-quark pair production in electron-positron collisions within the minimal noncommutative Standard Model

    hep-ph 2026-01 unverdicted novelty 5.0

    Noncommutative effects up to second order in Θ induce measurable deviations in the e+e− → tt̄ total cross section, polar and azimuthal distributions, and forward-backward asymmetry at ILC and CLIC energies.

  3. Adapting ILC detector concepts to other facilities

    hep-ex 2026-04 unverdicted novelty 2.0

    The paper summarizes adaptations needed to apply ILC detector concepts to other Higgs Factory projects like FCC-ee.