Pith. sign in

REVIEW

Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty

Not yet reviewed by Pith; the record is open.

This paper has not been read by Pith yet. Machine review is queued; the pith claim, tier, and objections will appear here once it completes.

SPECIMEN: schema-true, not a live event

T0 review · schema-true

One-sentence machine reading of the paper's core claim.

pith:XXXXXXXX · record.json · timestamp

arxiv 2501.14526 v1 pith:CRG6ZS4S submitted 2025-01-24 cs.RO cs.SYeess.SY

Robustified Time-optimal Point-to-point Motion Planning and Control under Uncertainty

classification cs.RO cs.SYeess.SY
keywords stagemotiontimecontroluncertaintyapproachconstraintsgrid
verification ladder T0 review T1 audit T2 compute T3 formal T4 reserved
0 comments
read the original abstract

This paper proposes a novel approach to formulate time-optimal point-to-point motion planning and control under uncertainty. The approach defines a robustified two-stage Optimal Control Problem (OCP), in which stage 1, with a fixed time grid, is seamlessly stitched with stage 2, which features a variable time grid. Stage 1 optimizes not only the nominal trajectory, but also feedback gains and corresponding state covariances, which robustify constraints in both stages. The outcome is a minimized uncertainty in stage 1 and a minimized total motion time for stage 2, both contributing to the time optimality and safety of the total motion. A timely replanning strategy is employed to handle changes in constraints and maintain feasibility, while a tailored iterative algorithm is proposed for efficient, real-time OCP execution.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.