pith. sign in

arxiv: 1605.08391 · v1 · pith:PPROU35Unew · submitted 2016-05-26 · 🧮 math.OC

Absolute semi-deviation risk measure for ordering problem with transportation cost in Supply Chain

classification 🧮 math.OC
keywords stochasticchaincomputationalexpectedinstancesriskrisk-measuresupply
0
0 comments X
read the original abstract

We present a decomposition method for stochastic programs with 0-1 variables in the second-stage with absolute semi-deviation (ASD) risk measure. Traditional stochastic programming models are risk-neutral where expected costs are considered for the second-stage. A common approach to address risk is to include a dispersion statistic in addition with expected costs and weighted appropriately. Due to the lack of block angular structure, stochastic programs with ASD risk-measure possess computational challenges. The proposed decomposition algorithm uses another risk-measure `expected excess', and provides tighter bounds for ASD stochastic models. We perform computational study on a supply chain replenishment problem and standard knapsack instances. The computational results using supply chain instances demonstrate the usefulness of ASD risk-measure in decision making under uncertainty, and knapsack instances indicate that the proposed methodology outperforms a direct solver.

This paper has not been read by Pith yet.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.