pith. machine review for the scientific record. sign in

arxiv: nucl-ex/0205008 · v1 · submitted 2002-05-14 · ⚛️ nucl-ex

Recognition: unknown

Integration and Conventional Systems at STAR

Authors on Pith no claims yet
classification ⚛️ nucl-ex
keywords detectorgroupstarsystemsassignedcollaborationconstructionresponsibility
0
0 comments X
read the original abstract

At the beginning of the design and construction of the STAR Detector, the collaboration assigned a team of physicists and engineers the responsibility of coordinating the construction of the detector. This group managed the general space assignments for each sub-system and coordinated the assembly and planning for the detector. Furthermore, as this group was the only STAR group with the responsibility of looking at the system as a whole, the collaboration assigned it several tasks that spanned the different sub-detectors. These items included grounding, rack layout, cable distribution, electrical, power and water, and safety systems. This paper describes these systems and their performance.

This paper has not been read by Pith yet.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.

Forward citations

Cited by 1 Pith paper

Reviewed papers in the Pith corpus that reference this work. Sorted by Pith novelty score.

  1. Production of muonic kaon atoms at high-energy colliders

    hep-ph 2026-03 unverdicted novelty 6.0

    Muonic kaon atoms form in D0 decays with branching ratio 2.29×10^{-10} and via QGP coalescence, with projected yields at LHC and RHIC sufficient for first observation and secondary-vertex reconstruction.