Recognition: unknown
Integration and Conventional Systems at STAR
read the original abstract
At the beginning of the design and construction of the STAR Detector, the collaboration assigned a team of physicists and engineers the responsibility of coordinating the construction of the detector. This group managed the general space assignments for each sub-system and coordinated the assembly and planning for the detector. Furthermore, as this group was the only STAR group with the responsibility of looking at the system as a whole, the collaboration assigned it several tasks that spanned the different sub-detectors. These items included grounding, rack layout, cable distribution, electrical, power and water, and safety systems. This paper describes these systems and their performance.
This paper has not been read by Pith yet.
Forward citations
Cited by 1 Pith paper
-
Production of muonic kaon atoms at high-energy colliders
Muonic kaon atoms form in D0 decays with branching ratio 2.29×10^{-10} and via QGP coalescence, with projected yields at LHC and RHIC sufficient for first observation and secondary-vertex reconstruction.
discussion (0)
Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.