The reviewed record of science sign in
Pith

arxiv: 1906.06461 · v1 · pith:MK4MZ4A3 · submitted 2019-06-15 · math.OC · cs.SY· eess.SY

Post-disaster Repair Scheduling in Partially Automated Electricity Distribution Networks

Reviewed by Pith T0 review T1 audit T2 compute T3 formal T4 kernel pith:MK4MZ4A3record.jsonopen to challenge →

classification math.OC cs.SYeess.SY
keywords schedulingalgorithmdistributionelectricityminimizenetworksnumberrepair
0
0 comments X
read the original abstract

Natural disasters require repairing all damaged components in electricity distribution networks. Optimal scheduling repair crews to minimize the aggregate duration of interruptions reduces the harm. We consider the fact that the number of switches is much smaller than the number of edges. The problem is modeled by a parallel identical machine scheduling with group soft precedence constraints to minimize the total weighted energization time. We propose an LP-based list scheduling algorithm and a conversion algorithm and analyze their theoretical performances.

This paper has not been read by Pith yet.

discussion (0)

Sign in with ORCID, Apple, or X to comment. Anyone can read and Pith papers without signing in.